How many new homes are planned, where they go, affordable housing requirements, housing mix, density and homes for older people.

295 sections of the plan, in document order.

The human version (we wrote this, not the council)This section is the foreword from Councillor Catherine Sayer, Leader of the Council. It says the government has set Tandridge District Council a very high housing target of 819 homes per year. In the two previous consultations, nearly 89% of respondents put protecting the Green Belt and countryside first, and more than two-thirds said development should be phased to match infrastructure. The Plan aims to minimise harm to the Green Belt and set lasting boundaries. Without an up to date plan, the district faces speculative planning applications. On 1 April next year the East Surrey unitary authority takes over planning, so the Council wants this Plan ready first.

The human version (we wrote this, not the council)This section introduces the new Solihull Local Plan. It notes that two thirds of the Borough is in the Green Belt, including the Meriden Gap that separates Solihull and the Birmingham conurbation from Coventry. The current plan was adopted in December 2013 and covers 2011 to 2028, but is now seen as largely out of date. A 2020 Draft Submission Plan was withdrawn in October 2024 after a long examination. This plan replaces the 2013 plan and the 2014 Gypsy and Traveller Site Allocations DPD. Without a plan, the Council could not show a 5-year land supply. Five neighbourhood plans have been made and remain part of the development plan.

The human version (we wrote this, not the council)This section introduces the Tandridge District Local Plan, which sets out how growth will be delivered to 2042. It is the Regulation 19 version, covering 2027 to 2042, and will replace the Core Strategy 2008 in full. The plan period was cut from 2044 to 2042. On 1 April 2027, East Surrey Council will replace Tandridge District Council. The Plan must pass four soundness tests: positively prepared, justified, effective and consistent with national policy. Comments should focus on legal compliance and soundness, sent through the online portal, by email or by post. The publication period runs for at least six weeks, closing at 9am on Tuesday 8 December 2026.

The human version (we wrote this, not the council)This section explains the district's housing need and sets out the housing allocations policy. The plan runs from 2026 to 2041 and uses the Government's standard method, which gives a need of 832 homes a year and a target of 12,480 homes. After counting existing planning permissions and an allowance for windfall sites, 10,312 homes must come from allocated sites. The policy safeguards allocated sites for housing, expects development broadly in line with each site's stated capacity, and only allows earlier release of sites if the five-year housing land supply falls short.

The human version (we wrote this, not the council)This section sets out the national and regional setting for the plan. The plan will be tested against the NPPF of December 2024, but planning applications are decided under the NPPF published in August 2026, which brings in National Development Management Policies. The West Midlands Combined Authority is preparing a Spatial Development Strategy for the region, guided by eight principles, with adoption expected from spring or summer 2028. Regulations from 25 March 2026 removed the legal duty to cooperate, but the soundness test remains. The Council plans to meet all of its own needs. If the strategy later shows Solihull should take more, a new plan may be needed sooner.

The human version (we wrote this, not the council)This section describes Tandridge District, a mainly rural area in the east of Surrey covering about 248 square kilometres. About 94% of it is Green Belt, and 16% lies in the Surrey Hills and High Weald National Landscapes. M25 Junction 6 runs beyond its designed capacity. The district has 22 parishes. The 2021 Census population was 87,874, rising to 90,586 by mid-2024, with an older age profile. In 2025 the median house price was £490,000. Delivery has averaged about 247 homes a year, against a need of 819, or 12,285 homes over 15 years. The HEDNA finds an employment land need of 21.4 hectares.

The human version (we wrote this, not the council)This section sets out the housing need figure. Using the Government's Standard Method, the council calculates local housing need for Hart at 804 homes a year. Over the proposed plan period from 2026 to 2039, this equals 10,452 homes. Sites for 1,751 homes already have planning permission. This means land must be identified for a further 8,701 homes. The council says it needs to identify land to meet that remaining figure.

The human version (we wrote this, not the council)This section describes the district and the issues the plan must tackle. Three Rivers covers about 88 square kilometres on the edge of London, with around 93,800 residents in 2021, projected to reach 98,919 by 2041 alongside a fast-growing over-65 population. It is among the least deprived areas in England, though pockets of deprivation exist, notably in South Oxhey. House prices averaged £594,000 in October 2025, making affordable housing a pressing need. Around 76% of the district is Green Belt, car dependency is high, and the council declared a climate emergency in 2019.

The human version (we wrote this, not the council)This section lists the proposed measurable outcomes for monitoring the plan. They include delivering at least 10,452 net additional homes between 2026 and 2039, a mix of homes including at least 43 Gypsy and Traveller pitches, and employment land for about 8,300 sqm of offices and 3,000 sqm of industrial space. Others cover growth in accessible locations, more walking, cycling and public transport, and timely infrastructure. Further outcomes cover environmental standards, mitigation for the Thames Basin Heaths, and biodiversity. Question 1 asks for comments on the Vision, and question 2 on the outcomes.

The human version (we wrote this, not the council)This section introduces the chapter on where new development should go. It sets out a suggested approach and asks for views on it, the evidence and reasonable alternatives. No pattern of growth has been chosen and no decisions have been made on sites. The standard method sets a minimum need of 10,452 new homes between 2026 and 2039, an average of 804 a year. Planning permission exists for 1,751 homes, leaving at least 8,701 homes to find land for. The council will update these figures for completions, lapsed permissions and the latest evidence.

The human version (we wrote this, not the council)This section asks how far ahead the plan should look. The consultation figures use a plan period of 2026 to 2039. An alternative would extend it to 2044, planning for around 14,500 homes, around 4,000 more. A longer period could give a clearer framework for large developments and help coordinate infrastructure. No decision has been made. The council currently expects its housing requirement to meet need in full, and says infrastructure pressures do not by themselves mean fewer homes. It seeks views on where growth should go, how to balance brownfield and greenfield land, and which sites to propose.

The human version (we wrote this, not the council)This section introduces the Hertsmere Local Plan as the statutory planning framework for managing growth, investment and change across the Borough. It lists the Plan's commitments, such as meeting housing needs, using brownfield land and protecting the Green Belt as far as possible. It explains that the Plan must be read as a whole alongside the Policies Map and national policy. It outlines the stages of plan preparation, including Regulation 18 consultation, this Regulation 19 stage, submission and examination, and the evidence base, Sustainability Appraisal and tests of soundness.

The human version (we wrote this, not the council)This section sets out the Plan's vision and ten strategic objectives. By 2042, the district should keep its rural, historic and landscape character while delivering homes, jobs and infrastructure. Growth will go to accessible places, with infrastructure phased alongside it, brownfield land put first and Green Belt released only in exceptional circumstances. Delivery has averaged 247 homes since 2006/2007. The Plan aims for an average of 663 dwellings per year through strategic development at Redhill Aerodrome and justified Green Belt release elsewhere. Land south of Redhill Aerodrome is safeguarded for possible future need. The objectives cover growth, housing, health, the economy, infrastructure, climate change, nature, heritage, design and monitoring.

The human version (we wrote this, not the council)This section lists the plan's strategic objectives, which flow from the Spatial Vision. They include a sustainable pattern of development that reflects the rural character, meeting the Borough's housing needs and growing the local economy. Further objectives are maintaining the vitality of the Market Towns, promoting rural diversification, delivering high quality and inclusive design, and protecting the natural and historic environment. For each objective the plan lists how it will be achieved, such as reusing previously developed land and providing affordable housing. The section also includes a table showing which policies are strategic and which are non-strategic.

The human version (we wrote this, not the council)This section explains the district's constraints and development needs. About 94% of the district is Green Belt. The standard method gives 819 dwellings each year, a minimum of 12,285 dwellings over the 15 years from adoption in 2027. The HEDNA identifies about 21.4 hectares of employment land need: 10.3 ha of E(g)(i-ii), 4.5 ha of E(g)(iii) / B2 and 6.6 ha of B8. Existing commitments add only 0.6 ha. The GTAA finds a need for 143 Gypsy and Traveller pitches and 69 Travelling Showpeople plots from 2025/2026 to 2044/2045. The Infrastructure Delivery Plan identifies the main infrastructure needed.

The human version (we wrote this, not the council)This section explains the brownfield first approach. National policy requires plans to make effective use of suitable brownfield land, but Hart must still find enough deliverable land for its housing needs. Vacant or underused land in settlements, centres and employment areas could support regeneration and reduce the need for greenfield land. The council will examine each suitable opportunity for availability, deliverability, access, infrastructure, costs, timing, environmental effects and the value of existing uses. Current evidence indicates brownfield land can meet only part of the need, so the council will compare brownfield and greenfield opportunities positively and realistically.

The human version (we wrote this, not the council)This section covers greenfield opportunities. Because brownfield land can meet only part of the Government-set housing need, the council must also assess suitable greenfield land. Such land could create well-designed places, provide affordable homes and secure infrastructure and environmental improvements. Larger developments could provide new services, transport connections and green spaces. The council will explore greenfield opportunities and compare the growth patterns they could support, looking at links to existing communities, travel choices, infrastructure, deliverability and benefits. National policy requires a range of site sizes, including for small and medium-sized builders, so smaller and medium sites will need to contribute too.

The human version (we wrote this, not the council)This section explains why a new Local Plan is needed. Buckinghamshire became a single unitary council in April 2020, and this is the first plan to cover the whole county under one framework. The old district plans are increasingly out of date, and national policy has changed. National policy identifies a housing need of about 4,344 homes a year up to the end of March 2045. The county must balance this growth with protecting assets such as the Chilterns National Landscape and the Green Belt.

The human version (we wrote this, not the council)This section explains the Spatial Strategy. It puts brownfield and underused land in settlements first, but this cannot meet needs in full, so the Plan also allocates greenfield and Green Belt land. Table 4 sets out a four-tier settlement hierarchy, from Urban Centres such as Caterham on the Hill and Oxted down to smaller villages and hamlets. The Council says exceptional circumstances justify Green Belt boundary changes. Redhill Aerodrome is the main strategic site, expected to deliver about 2,350 homes. The minimum housing requirement is 9,946 over the plan period, around 663 homes each year, compared with past delivery of about 247. Policies SP1 and SP2 follow.

The human version (we wrote this, not the council)This section covers new settlements, which the council says offer a strong chance to plan homes, infrastructure, services and green space together. It is exploring two opportunities: growth around Winchfield Station and the promoted Rokeham New Village proposal for around 1,500 homes between Crondall and Odiham. It will consider whether one, both or neither should contribute to the growth strategy. Each would need good access to jobs and services, a realistic way to fund infrastructure, and a deliverable first phase. The council will make realistic assumptions about when building could start and how many homes could be completed in the plan period.

The human version (we wrote this, not the council)This section describes the stage the Plan has reached. It is at the Regulation 19 stage of the formal plan-making process. Early engagement ran from 2021 to 2022, followed by consultation on the vision and objectives in 2023 and several Call for Sites exercises. Regulation 18 consultation on the draft plan took place in September and October 2025, with Regulation 19 consultation between July and September 2026. The Plan was submitted for independent examination in December 2026.

The human version (we wrote this, not the council)This section describes the evidence base behind the Plan. A wide range of technical studies covers housing and employment needs, transport, infrastructure, climate change, sustainability, health and design. Key studies include the Housing and Economic Land Availability Assessment (HELAA) and the New and Expanded Settlement Study (NESS), which test whether promoted sites are suitable, available and achievable. Other evidence covers flood risk, water, renewable energy, retail and gypsy and traveller accommodation. A full list is on the Council's website.

The human version (we wrote this, not the council)This section explains the national and strategic context for the Plan. It has been prepared under the December 2024 National Planning Policy Framework (NPPF), which requires plans to cover at least 15 years and to balance economic, social and environmental aims. Using the Government's standard method, Buckinghamshire's housing need is 4,344 homes a year, or about 91,230 homes over the plan period to 2045. The Council has worked with neighbouring authorities on cross-boundary issues and aligned the Plan with the Local Transport Plan.

The human version (we wrote this, not the council)This section explains how the strategy leads to individual sites. The council will first decide the overall pattern of growth, then assess sites against it, so sites put forward will not determine the strategy. The Land Availability Assessment identifies options from the call for sites, which remains open. Five maps show opportunities and constraints, and site options for housing, economic uses, Gypsy and Traveller accommodation, and other uses. These sites are understood to be available and not ruled out by a major constraint, but need further assessment. No sites were submitted solely for Gypsy and Traveller use. Comments can be made on interactive maps online, or by email or post.

The human version (we wrote this, not the council)This policy sets the Spatial Strategy. Development will be directed through an infrastructure-led approach that combines a new mixed-use community at Redhill Aerodrome with a capacity-led spread of development across the settlement hierarchy in Table 4. Settlements in all tiers will contribute in proportion to their role and capacity. All development must use land effectively, be supported by the infrastructure it needs and protect the Green Belt, countryside, landscape, biodiversity, heritage and the separate identity of settlements. Settlement and Green Belt boundaries have been changed where needed. Development outside settlement boundaries will not be supported unless allocated or allowed by other policies, including GRB1 and NE3.

The human version (we wrote this, not the council)This section covers population and communities. Buckinghamshire has around 553,000 people, up 9.5% since 2011, which is faster than the 6.6% growth for England. Aylesbury and High Wycombe are the main urban centres, supported by market towns such as Amersham, Buckingham, Chesham and Marlow. The population is ageing, with residents aged 65 and over up 23.2% between 2011 and 2021. Life expectancy in the most deprived areas is about 5.4 years lower than in wealthier areas.

The human version (we wrote this, not the council)This policy sets out how the Plan will meet development needs. It provides for a minimum of 9,946 homes under Policy H1. The Council accepts that a residual housing need remains against the standard method. It will address this through further development, by exploring land south of Redhill Aerodrome in a Local Plan review, and through cross-boundary work including the Surrey Strategic Development Strategy. An early review will start no later than the third anniversary of adoption. The Plan provides for 143 Gypsy and Traveller pitches, 69 Travelling Showpeople plots and about 21.4 hectares of employment land. These are minimums, and extra development meeting set criteria will be supported.

The human version (we wrote this, not the council)This section introduces the housing policies H1 to H7. The Plan provides a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March 2042, through a stepped trajectory. Supply comes from commitments of around 1,612 dwellings, about 2,350 at Redhill Aerodrome from year 6, about 4,124 on new allocations, about 1,300 from the Settlement and Windfall Study and about 560 from rural windfall. Land next to Redhill Aerodrome is removed from the Green Belt but not allocated. The stepped requirement rises from 350 dwellings in 2027/2028 to 600 a year, averaging 470 over five years, then 760 a year from 2032/2033.

The human version (we wrote this, not the council)This section explains the spatial strategy, which steers most development to the Main Towns and then through a cascade to other settlements, with very little in the countryside. Atherstone with Mancetter and Polesworth with Dordon are the Main Towns. Coleshill is also a historic Market Town, but its growth is smaller because Green Belt surrounds it. There are five Local Service Centres. About 60% of the Borough is in the Green Belt. The section also allows development on the edge of the Borough close to Tamworth and Nuneaton. All proposals must be proportionate to the size of the settlement.

The human version (we wrote this, not the council)This section introduces the strategic policies chapter through the spatial strategy, which directs growth to the edges of the district's larger settlements where services and transport are strongest. It explains that brownfield sites can deliver fewer than 700 new homes, so the plan provides for around 4,200 dwellings on land currently in the Green Belt. The council argues that exceptional circumstances justify changing Green Belt boundaries, citing the scale of housing need, limited brownfield land, acute affordable housing need and the extent of Green Belt cover.