The human version (we wrote this, not the council)This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.
Southend
88 sections of the plan, in document order.
The human version (we wrote this, not the council)This section sets out Southend's context and main issues. The city boundary tightly abuts the urban area and the countryside around it is Green Belt, so land is very limited. Southend has 83,500 dwellings housing 182,000 people, and the Government Standard Method says 1,405 new homes are needed each year. There are around 80,000 jobs, and 86% of companies employ 10 staff or fewer. The resort draws around 7 million day visitors and over 200,000 staying visitors a year. The section also covers seven miles of foreshore, over 500 hectares of green space, flood risk, congestion on the A127 and A13, and the Airport's recovery after Covid-19.
The human version (we wrote this, not the council)This section sets out the vision and strategic objectives for the Local Plan. It draws on the Southend City Vision, 'Our City, Our Future', which looks to 2035. The long term vision is of a prosperous, well connected and sustainable "City by the Sea" with distinct neighbourhoods and a cherished coastal identity. There are 24 strategic objectives, grouped under themes from a city that is healthy and safe to a city that is connected and smart. They include an 'infrastructure led' approach, complete neighbourhoods, a choice of homes, a regenerated City Centre, more green space and the growth of London Southend Airport.
The human version (we wrote this, not the council)This policy, Strategic Policy SP1, sets out the Spatial Principles that all new development must follow where relevant. Development should be served by the infrastructure it needs, using an 'infrastructure led' approach. It should make the best use of previously developed land and minimise the use of greenfield land. The openness of the Green Belt will be protected. The policy supports tourism, culture and economic growth at the City Centre, London Southend Airport and the employment areas. It also asks for good design, sustainable travel, support for existing centres, resilience to climate change, protection of heritage, net gains in biodiversity, and care over unstable land.
The human version (we wrote this, not the council)This policy, Strategic Policy SP2, sets out where growth will go in Southend. The Local Plan provides for 14,700 new homes and 68,400sqm of employment space to 2045. The main focus is Southend Central Area, with 3,600 additional homes, and Land North of Southend, with a new neighbourhood of 4,900 homes. Other growth areas are Fossetts, with around 1,350 new homes, the Seafront, Shoeburyness, London Southend Airport and environs, and Priority Urban Areas such as Leigh, Westcliff and the A13 corridor. Airport jobs will be split 50-50 with Rochford District Council. New development must enhance local character and the sense of place.
The human version (we wrote this, not the council)This policy, Strategic Policy SP2b, sets the guiding principles for the Bournes Green New Neighbourhood on Land North of Southend. It will deliver a minimum of 4,900 new homes and 12,500 sqm of employment floorspace as a series of urban villages. Design must have regard to a Council endorsed Concept Framework, with design codes informed by a Quality Review Panel. The principles include a country park, green and blue corridors along brooks, phased schools and healthcare, road and public transport improvements, links to Garon Park, a high proportion of family homes and local centres. A 9-hole golf course at Garon Park would be lost, but the 18-hole course is kept.
The human version (we wrote this, not the council)This site allocation, Policy DM2b, allocates land north of Southend at Bournes Green, shown as BG001 on the Policies Map. It is for a minimum of 4,900 new homes, including 45% affordable housing and at least 150 self-build or custom-build plots, plus at least 12,500 sqm of employment floorspace. It must provide transport mitigation, new primary and secondary schooling, a purpose built primary care facility, a country park, sports pitches and a Golf Impact Assessment. Development must protect the Essex Coast Habitats Sites, with at least two seasons of wintering bird surveys. The text says exceptional circumstances justify removing this land and Fossetts Farm (HEA264) from the Green Belt.
The human version (we wrote this, not the council)This policy, Strategic Policy SP3, makes sure new development is backed by the infrastructure it needs. Infrastructure must be phased with new homes through an 'Infrastructure Led Approach' and must not overload what already exists. Required infrastructure includes highway upgrades, sustainable transport, more school places, healthcare, emergency services, Protected Green Space, broadband, sewer network improvements and flood prevention. The Council will use planning obligations to secure provision or money from developers. It will review the Southend Community Infrastructure Levy and may use compulsory purchase powers. The text notes problems such as Victorian sewers and parts of the Leigh electricity network operating close to capacity.
The human version (we wrote this, not the council)This section introduces the chapter on healthy lifestyles and wellbeing. Southend faces public health challenges and an ageing population. Life expectancy is around 10 years lower in the most disadvantaged areas than in the least disadvantaged. Healthy life expectancy is estimated at 61.3 years for males and 61.4 years for females. Nearly 1 in 4 adults are physically inactive, and around 26% of 4-5 year olds and 36% of 10-11 year olds are overweight or living with obesity. The section explains how planning can help, for example through safe play spaces, active travel networks, flexible homes and avoiding pollution and flood risk.
The human version (we wrote this, not the council)This policy, Strategic Policy SP4, requires new buildings and spaces to support healthy lifestyles, physical activity and safe, inclusive places. Development should not harm the city's ability to improve education, health and wellbeing. The Council will support schemes that improve the primary care network with the NHS. A Health Impact Assessment is needed for developments of 50 or more dwellings or 5000sqm or more of non-residential floorspace. It is also needed where an Environmental Impact Assessment is required, or for a large HMO of 7 or more unrelated people. A full assessment may follow if significant issues are found. Policy Table SP4.1 lists other policies that affect health.
The human version (we wrote this, not the council)This policy, Policy DM4.1, supports a network of community facilities to help create healthy and complete neighbourhoods. New or improved facilities should be well designed, safe, inclusive and accessible to all. Existing facilities such as community centres, libraries, pubs, places of worship, health facilities, schools and theatres are protected. Their loss is only accepted if the community no longer needs them and alternatives exist, or if the use is no longer financially viable. This must include at least a 1-year active marketing exercise. New homes near such facilities must follow the agent of change principle. The policy also supports more space for burials and cremations, including green burials.
The human version (we wrote this, not the council)This policy, Policy DM4.2, supports new and improved sport and recreation facilities in line with local assessments of need. Planning obligations will be sought where new development creates or adds to local shortages. New or replacement facilities should be safe and inclusive, including changing rooms, and reachable by walking, cycling and public transport. Community Use Agreements will be needed to secure wider community use. Loss of outdoor sports facilities, children's play space or other sports land is only allowed if there is a surplus. The other option is equal or better replacement facilities in accessible places. New investment should follow the Built Facilities Strategy and Playing Pitch Strategy.
The human version (we wrote this, not the council)This section introduces the chapter on homes. Housing in Southend has become less affordable and land for new homes is limited. The national standard method gives a need of 1,405 homes per year, more than 4 times past delivery rates. Between 2001-2025 about 7,900 new homes were built, around 330 per year. Of these, 96% were on previously developed land and around 75% were flats. Only 14% had 3 beds and 8% had 4 or more beds. The section highlights the need for family homes, homes for older people and affordable housing. It notes that HMOs are common and that no need for gypsy or traveller pitches has been found.
The human version (we wrote this, not the council)This policy, Strategic Policy SP5, plans for 14,700 net dwellings to 2045. These are split between Southend Central Neighbourhood (3,600), Land North of Southend (4,900), Fossetts Farm (1,350), other neighbourhoods (1,850) and windfall (3,000). Delivery is stepped: 365 dwellings a year in 2025-2030, 655 in 2030-2035 and 960 in 2035-2045. Homes will come from existing permissions, site allocations, opportunity sites and windfall. Affordable housing is required on all sites of 10 or more dwellings, and the loss of homes will be resisted. No need for gypsy or traveller pitches is identified, but criteria are set for any future application.
The human version (we wrote this, not the council)This policy, Policy DM5.1, sets how much affordable housing new schemes must provide. Schemes of 10 dwellings or more must provide at least 30% affordable or key worker homes. The rate is 10% for brownfield flatted development in Value Area 1, which covers Westcliff, Prittlewell, Southend Central, Southchurch, Fossetts and part of Shoeburyness. Build to Rent schemes must provide at least 20%. Provision should normally be on-site. The Council will seek 80% as affordable housing for rent, with the rest as affordable home ownership. As a guide, this means 40% social rent, 40% affordable rent and 20% other ownership products.
The human version (we wrote this, not the council)This policy, Policy DM5.3, resists any net loss of existing homes (Use Class C3) in Southend. Applications that lose homes will be refused unless an exception applies. Exceptions include a change to a needed local community facility, or homes that cannot reach the standards in Policy DM5.5. Others are a net gain in affordable housing, enlarging sub-standard units to meet space standards, or the only practical way to preserve a listed building or other heritage asset. The previous use of a building can also be taken into account. Turning small flats back into family sized homes is supported in principle, even with a net loss of units.
The human version (we wrote this, not the council)This policy, Policy DM5.4, controls the conversion of houses into smaller self-contained flats. Conversions are only allowed if the floor area is at least 124sqm or the home has four or more bedrooms. At least one new unit must be suitable for a family, with a minimum of three bedrooms. Schemes must meet Policy DM5.5 and must not harm living conditions, the look of the building or area, or a street's function. Parking standards in Policy DM10.3 must be met. The family unit is not needed where a different mix is essential for a listed building, for existing occupants who will remain, or for people with special housing needs.
The human version (we wrote this, not the council)This policy, Policy DM5.5, sets minimum standards for new homes, including extensions. All units should meet or exceed the nationally described space standards in Policy Table DM5.5. For proposals of 10 or more dwellings, at least 20% must meet Building Regulation M4(2) for accessible and adaptable homes. A further 10% must be suitable for wheelchair users under M4(3). Every home should have usable private outdoor space, such as a garden or balcony, plus vehicle and cycle parking. The technical rules include a single bedroom of at least 7.5sqm, a double bedroom of at least 11.5sqm, and a ceiling height of at least 2.3m over 75% of the floor area.
The human version (we wrote this, not the council)This policy, Policy DM5.6, manages Houses in Multiple Occupation (HMOs) and other shared housing. Turning large sui generis HMOs back into family homes is allowed. New HMOs are only permitted if they would not make up over 10% of homes within a 50 metre radius. They must not sandwich a normal home between two HMOs or create a run of three or more HMOs. They must not cause harm through noise, on street parking, building alterations or poor bin and cycle storage. They must meet the Essex HMO Amenity Standards. The Council will investigate Article 4 Directions to control conversions of homes into small HMOs for three to six people.
The human version (we wrote this, not the council)This policy, Policy DM5.7, aims to provide enough housing for older people to live independently for as long as possible. New schemes must meet an identified need, be targeted at local residents and show there is no existing capacity in Southend. They must not create an over concentration of similar uses. They need good access to transport and services, suitable care, space for carers and visitors, and communal areas, including space to grow food. A 6-month marketing exercise should target people with a local connection. Loss of older people's housing is only allowed if it is surplus, outdated, residents can move elsewhere in the city, or better provision replaces it.
The human version (we wrote this, not the council)This policy, Policy DM5.8, supports a suitable range of housing for people with specialist and vulnerable needs. It covers supported housing not dealt with by Policy DM5.7. Permission will be granted where the scheme meets a demonstrable need in the city and is targeted at local residents, through a 6-month marketing exercise. It must be well designed, safe, accessible and suitable for the people who will live there, with facilities for carers and visitors. It must meet the standards in Policy DM5.5 or Care Quality Commission standards. Loss of such housing is only allowed if it is surplus, cannot meet modern standards, or will be replaced by better provision.
The human version (we wrote this, not the council)This policy, Policy DM5.9, sets criteria for co-living schemes, which are large purpose-built shared living blocks. They must be in well connected places with frequent public transport, with Southend Central Area as the main focus. Schemes must be under single management, with all units for rent on tenancies of at least three months. They must provide a communal kitchen, indoor and outdoor communal space, storage, a concierge, laundry and room cleaning. Each unit must have 18-27sqm of living space per person and a window. A management plan is required, plus an affordable housing contribution equivalent to at least 30% of the total number of units.
The human version (we wrote this, not the council)This section introduces the chapter on the local economy and visitors. Valuable employment land needs protecting after significant losses, mainly from dated high rise offices and from land turning into housing. The Covid pandemic led to more remote and hybrid working and online shopping. Priority growth sectors include aviation, construction, health and medical industries, business services, tourism, food and drink, culture and commercial fishing. Small businesses play a larger role than in the rest of Essex. Growth in Gross Value Added has been slower than the rest of England. Many people commute in from Rochford, Castle Point, Basildon and Chelmsford.
The human version (we wrote this, not the council)This policy, Strategic Policy SP6, supports at least 68,400sqm of employment space by 2045 to accommodate job growth. Offices, retail and other uses that attract many people will be focused on the City Centre. Development should support key sectors, jobs and training, small businesses, London Southend Airport, fishing at Leigh Port and better broadband. The loss of employment land will not normally be allowed. Designated Employment Areas will be safeguarded for employment uses. Home businesses and live/work units are supported in principle. Hotels, visitor accommodation and leisure are supported to make Southend a year-round destination. The text links this to a projected 9,500 additional jobs by 2045.
The human version (we wrote this, not the council)This policy, Policy DM6.1, supports new employment development that promotes sustainable economic growth. Schemes should add to the amount and quality of employment land, floorspace and jobs in the city. Southend City Centre and Southend Central Neighbourhood will be the main location for major economic growth. To attract investment, employment schemes in the key Economic Sectors listed in Policy Table DM6.1 will mainly be directed to the matching Priority Locations. They can also go to the rest of Southend's Employment Areas listed in Policy DM6.3a. Schemes must be of the right type, scale and character, and any exceptions will be considered on an individual site basis.
The human version (we wrote this, not the council)This policy, Policy DM6.2, requires major developments to help local people into work and training. It applies to schemes of 50 or more dwellings, or more than 5,000sqm of non-residential floorspace. Developers must submit an Employment and Skills Plan, secured through a Section 106 agreement. The plan should show how the scheme will support jobs and skills during construction and, for commercial schemes, once the building is in use. Examples include apprenticeships and paid job placements. A monitoring fee is paid when development starts. It ranges from £2,000 for build costs up to £25 million to £8,000 for £75 to 100 million.
The human version (we wrote this, not the council)This policy, Policy DM6.3, protects and manages the city's Employment Areas. Major schemes there should offer a range of flexible unit sizes, including space for small and medium sized enterprises and, where suitable, incubator, grow on or affordable workspace. Class B and Class E(g)i-iii uses will be supported. Other uses are only allowed in set cases, such as a similar Sui Generis employment use, or where there is no reasonable prospect of employment use after at least a 1-year active marketing exercise. Employment Growth Areas will be promoted for modern floorspace. Article 4 Directions may be used to stop loss to housing, and the Agent of Change Principle applies.
The human version (we wrote this, not the council)This policy, Policy DM6.4, supports new ways of working. Flexible workspace, such as co-working spaces, serviced offices and incubator space for remote workers and small firms, is supported in principle. This applies where there is no significant harm to neighbours or local character. Running a business from home is supported where the property stays mainly residential, still meets the space standards in Policy DM5.5, is well designed and has enough parking. Live/work units are supported where the home part is ancillary to the business and is lived in only by the people working there full time and their dependents. The commercial space must be finished first.
The human version (we wrote this, not the council)This policy, Policy DM6.5, sets the hierarchy of shopping and commercial centres. Southend City Centre comes first for retail and other uses that attract many people, as a sub-regional centre and the key driver of regeneration. Leigh and Westcliff are District Centres, and other places are Neighbourhood and Local Centres. Article 4 Direction(s) will be used to control ground floor changes from shops to homes in the City Centre and District Centres. Frontages must stay active, and betting shops, pay day loan shops and adult gaming centres must be separated by at least two units in other uses. Retail parks are promoted for larger format units.
The human version (we wrote this, not the council)This policy, Policy DM6.6, covers tourism and visitor accommodation. The Central Seafront is the main focus for new tourist attractions, with the City Centre and wider Seafront, including Leigh-on-Sea and Shoeburyness, also supported. Major tourism schemes must improve sustainable travel for visitors. The foreshore, parks and gardens will be protected. New visitor accommodation should be in the Key Areas: Southend Central Neighbourhood, the District Centres of Leigh and Westcliff, and places closely linked to the Seafront and London Southend Airport. Visitor accommodation there is kept unless no longer viable. Changing homes to holiday lets used over 90 days a year is assessed for housing and amenity impacts.