Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Jobs & economy

Employment land, offices, industry, warehousing, rural businesses, tourism and skills.

246 sections of the plan, in document order.

The human version (we wrote this, not the council)This section introduces Part II of the Local Plan, which sets out where development will take place, how much, and when. Sites are allocated for housing, gypsy and traveller and travelling showpeople accommodation, employment including Warner Bros. Studios, town centres and retail, open space, education and infrastructure. It explains how sites were assessed, including through the Strategic Housing and Employment Land Availability Assessment and an access to services study. It also sets out why the council considers exceptional circumstances exist to release some Green Belt land for development.

The human version (we wrote this, not the council)This section describes the Borough and the issues it faces. North Warwickshire is rural, with over 50 settlements and an area of 28,526 hectares. Atherstone with Mancetter, Coleshill and Polesworth with Dordon are the three market towns. The Borough sits between growing areas such as Birmingham, Coventry and Tamworth. Its economy has shifted towards logistics since the coal mines closed, and over 90% of firms employ fewer than 10 people. The M6, M42, A5 and A446 cross the Borough, as does the HS2 line. The section also covers rivers, canals, airports, minerals, MIRA Technology Park and pressure for growth from surrounding areas.

The human version (we wrote this, not the council)This section summarises the need for employment land. To 2039 the council needs an additional 8,300 sqm of office floorspace, equal to 1.3 hectares of land, and 3,000 sqm of industrial floorspace, equal to 0.7 hectares. If planning permissions that involve a loss of employment floorspace are assumed to be implemented, the land needed rises. In that case it is 2.4 hectares for office space and 1.7 hectares for industry.

The human version (we wrote this, not the council)This section describes Tandridge District, a mainly rural area in the east of Surrey covering about 248 square kilometres. About 94% of it is Green Belt, and 16% lies in the Surrey Hills and High Weald National Landscapes. M25 Junction 6 runs beyond its designed capacity. The district has 22 parishes. The 2021 Census population was 87,874, rising to 90,586 by mid-2024, with an older age profile. In 2025 the median house price was £490,000. Delivery has averaged about 247 homes a year, against a need of 819, or 12,285 homes over 15 years. The HEDNA finds an employment land need of 21.4 hectares.

The human version (we wrote this, not the council)This section introduces the Southend Local Plan. Southend is a city by the sea at the mouth of the Thames Estuary, some forty miles east of London. Land is limited and the urban area is densely built. The Plan sets out how the city should grow sustainably to 2045, giving new homes and jobs while protecting parks, heritage and the coast. Once adopted it will replace the Core Strategy (2007), the Development Management Document (DPD 2015), the Southend Central Area Action Plan (SCAAP 2018) and some JAAP 2014 policies. A new South East Essex unitary authority is planned, but this does not affect the legal status of local plans.

The human version (we wrote this, not the council)This section describes the district and the issues the plan must tackle. Three Rivers covers about 88 square kilometres on the edge of London, with around 93,800 residents in 2021, projected to reach 98,919 by 2041 alongside a fast-growing over-65 population. It is among the least deprived areas in England, though pockets of deprivation exist, notably in South Oxhey. House prices averaged £594,000 in October 2025, making affordable housing a pressing need. Around 76% of the district is Green Belt, car dependency is high, and the council declared a climate emergency in 2019.

The human version (we wrote this, not the council)This section sets out Southend's context and main issues. The city boundary tightly abuts the urban area and the countryside around it is Green Belt, so land is very limited. Southend has 83,500 dwellings housing 182,000 people, and the Government Standard Method says 1,405 new homes are needed each year. There are around 80,000 jobs, and 86% of companies employ 10 staff or fewer. The resort draws around 7 million day visitors and over 200,000 staying visitors a year. The section also covers seven miles of foreshore, over 500 hectares of green space, flood risk, congestion on the A127 and A13, and the Airport's recovery after Covid-19.

The human version (we wrote this, not the council)This section sets out the Plan's vision and ten strategic objectives. By 2042, the district should keep its rural, historic and landscape character while delivering homes, jobs and infrastructure. Growth will go to accessible places, with infrastructure phased alongside it, brownfield land put first and Green Belt released only in exceptional circumstances. Delivery has averaged 247 homes since 2006/2007. The Plan aims for an average of 663 dwellings per year through strategic development at Redhill Aerodrome and justified Green Belt release elsewhere. Land south of Redhill Aerodrome is safeguarded for possible future need. The objectives cover growth, housing, health, the economy, infrastructure, climate change, nature, heritage, design and monitoring.

The human version (we wrote this, not the council)This section sets out the Spatial Vision for the Borough: Rural North Warwickshire, a community of communities. The rural character will be kept and reinforced so the Borough stays distinct from the urban areas around it. Development will be balanced and sustainable, with most of it focused on the Market Towns and Local Service Centres. The vision also covers local jobs and skills, housing choice and tenure, good design, green infrastructure, open space and sports facilities. It says important natural and historic areas and buildings will be protected and enhanced.

The human version (we wrote this, not the council)This section describes how the Plan is organised. Chapters cover the introduction, the national and strategic context, a spatial portrait of the county, the vision and objectives, the spatial strategy and strategic policies, site allocations, and detailed development management policies. Appendices include the monitoring framework, housing and employment trajectories, the Buckinghamshire Design Code, parking standards and the Policies Map. Together these parts form one framework for shaping growth to 2045.

The human version (we wrote this, not the council)This section describes the Borough. Solihull sits on the southern edge of the West Midlands conurbation, between Birmingham and the Black Country to the west and Coventry to the east. Its motto is "Urbs in Rure", or town in country. It has strong transport links, including the M42 and Birmingham Airport. The section outlines how towns and villages grew over time. In 2023 the population was 218,793. The economy supports around 145,000 jobs and produces goods and services worth £10.72 (bn). Around two thirds of the Borough's 17,800 hectares is countryside and Green Belt. However, 41% of North Solihull residents live in the 10% most deprived areas of England.

The human version (we wrote this, not the council)This section lists the plan's strategic objectives, which flow from the Spatial Vision. They include a sustainable pattern of development that reflects the rural character, meeting the Borough's housing needs and growing the local economy. Further objectives are maintaining the vitality of the Market Towns, promoting rural diversification, delivering high quality and inclusive design, and protecting the natural and historic environment. For each objective the plan lists how it will be achieved, such as reusing previously developed land and providing affordable housing. The section also includes a table showing which policies are strategic and which are non-strategic.

The human version (we wrote this, not the council)This section explains the district's constraints and development needs. About 94% of the district is Green Belt. The standard method gives 819 dwellings each year, a minimum of 12,285 dwellings over the 15 years from adoption in 2027. The HEDNA identifies about 21.4 hectares of employment land need: 10.3 ha of E(g)(i-ii), 4.5 ha of E(g)(iii) / B2 and 6.6 ha of B8. Existing commitments add only 0.6 ha. The GTAA finds a need for 143 Gypsy and Traveller pitches and 69 Travelling Showpeople plots from 2025/2026 to 2044/2045. The Infrastructure Delivery Plan identifies the main infrastructure needed.

The human version (we wrote this, not the council)This section describes the stage the Plan has reached. It is at the Regulation 19 stage of the formal plan-making process. Early engagement ran from 2021 to 2022, followed by consultation on the vision and objectives in 2023 and several Call for Sites exercises. Regulation 18 consultation on the draft plan took place in September and October 2025, with Regulation 19 consultation between July and September 2026. The Plan was submitted for independent examination in December 2026.

The human version (we wrote this, not the council)This section sets out a portrait of West Northamptonshire, a vision for 2043 and 17 spatial objectives. The area has four towns, Northampton, Daventry, Towcester and Brackley, and over 190 villages. The 2021 census population was 425,725, up 13.5% since 2011. Northampton had 238,653 people. The vision describes vibrant communities, quality housing, a thriving economy, an enhanced environment and a regenerated Northampton. The 17 objectives have no order of priority. They cover topics such as the environment, heritage, housing, design, town centres and the visitor economy. Targets will be set in Chapter 16.

The human version (we wrote this, not the council)This section covers jobs and town centres. The evidence identifies a minimum need to 2039 for 8,300 square metres of office floorspace, about 1.3 hectares, and 3,000 square metres of industrial floorspace, about 0.7 hectares. If permissions involving a loss of employment floorspace are implemented, this rises to about 2.4 hectares for offices and 1.7 hectares for industry. The council suggests making better use of existing employment areas, adding employment land within accessible larger developments, and allowing flexible logistics space near main roads. It also suggests supporting retail that improves existing centres and updating centre boundaries and primary shopping areas.

The human version (we wrote this, not the council)This section explains the national and strategic context for the Plan. It has been prepared under the December 2024 National Planning Policy Framework (NPPF), which requires plans to cover at least 15 years and to balance economic, social and environmental aims. Using the Government's standard method, Buckinghamshire's housing need is 4,344 homes a year, or about 91,230 homes over the plan period to 2045. The Council has worked with neighbouring authorities on cross-boundary issues and aligned the Plan with the Local Transport Plan.

The human version (we wrote this, not the council)This section explains how the strategy leads to individual sites. The council will first decide the overall pattern of growth, then assess sites against it, so sites put forward will not determine the strategy. The Land Availability Assessment identifies options from the call for sites, which remains open. Five maps show opportunities and constraints, and site options for housing, economic uses, Gypsy and Traveller accommodation, and other uses. These sites are understood to be available and not ruled out by a major constraint, but need further assessment. No sites were submitted solely for Gypsy and Traveller use. Comments can be made on interactive maps online, or by email or post.

The human version (we wrote this, not the council)This policy, Strategic Policy SP1, sets out the Spatial Principles that all new development must follow where relevant. Development should be served by the infrastructure it needs, using an 'infrastructure led' approach. It should make the best use of previously developed land and minimise the use of greenfield land. The openness of the Green Belt will be protected. The policy supports tourism, culture and economic growth at the City Centre, London Southend Airport and the employment areas. It also asks for good design, sustainable travel, support for existing centres, resilience to climate change, protection of heritage, net gains in biodiversity, and care over unstable land.

The human version (we wrote this, not the council)This section covers population and communities. Buckinghamshire has around 553,000 people, up 9.5% since 2011, which is faster than the 6.6% growth for England. Aylesbury and High Wycombe are the main urban centres, supported by market towns such as Amersham, Buckingham, Chesham and Marlow. The population is ageing, with residents aged 65 and over up 23.2% between 2011 and 2021. Life expectancy in the most deprived areas is about 5.4 years lower than in wealthier areas.

The human version (we wrote this, not the council)This policy, Strategic Policy SP2, sets out where growth will go in Southend. The Local Plan provides for 14,700 new homes and 68,400sqm of employment space to 2045. The main focus is Southend Central Area, with 3,600 additional homes, and Land North of Southend, with a new neighbourhood of 4,900 homes. Other growth areas are Fossetts, with around 1,350 new homes, the Seafront, Shoeburyness, London Southend Airport and environs, and Priority Urban Areas such as Leigh, Westcliff and the A13 corridor. Airport jobs will be split 50-50 with Rochford District Council. New development must enhance local character and the sense of place.

The human version (we wrote this, not the council)This section gives a snapshot of Hertsmere today. It is a south Hertfordshire borough whose population grew from 94,762 in 2001 to an estimated 110,212 in 2024. It describes areas of wealth alongside pockets of deprivation, such as Cowley Hill in Borehamwood. It names the four main settlements, Borehamwood, Potters Bar, Radlett and Bushey, and notes 15 conservation areas and 325 statutory listed assets. It covers the film and television industry at Elstree Studios, and high house prices, with an average of £555,000 and a house-price-to-income ratio of 11.9.

The human version (we wrote this, not the council)This section describes the county's economy. Buckinghamshire generates about £19.2 billion in economic output and supports around 285,000 jobs across more than 31,000 businesses, around 98% of them small and medium-sized. Key clusters include high-performance engineering at Silverstone, the Westcott space cluster, life sciences and the film and media cluster at Pinewood. Productivity growth has weakened, and around 12.6% of residents commute to work in London. The Plan aims to support investment, innovation and better local jobs.

The human version (we wrote this, not the council)This section presents the plan's vision for 2050 and its ten strategic objectives. The objectives act as a golden thread running through the plan. They cover timely infrastructure, homes for all communities, jobs and a greener economy, effective use of land, net zero carbon, well-designed places, heritage and culture, health and wellbeing, better connections through walking, cycling and public transport, and protecting environmental assets while working towards environmental net gain.

The human version (we wrote this, not the council)This section calculates how much development South Warwickshire needs. For employment, 321.1 hectares of non-strategic land and 225 hectares of strategic land are needed; after existing commitments, 233.7 and 125 hectares remain to be found. The Government's standard method sets housing need at 2,197 homes a year, or 54,925 over the 25-year plan period from 2025 to 2050, with 44,980 still to find after commitments. The plan must also provide 129 Gypsy and Traveller pitches and 20 Travelling Showpeople plots.

The human version (we wrote this, not the council)This section explains the spatial strategy for West Northamptonshire. The main focus is regeneration of existing towns and use of previously developed land, with relatively limited growth on the edge of Northampton. The Council appraised eight broad spatial options. The two regeneration-focused options scored most favourably, though not all housing needs can be met within urban areas. The settlement hierarchy keeps Northampton as the Principal Urban Area, Daventry as the Sub Regional Centre, and Brackley and Towcester as Rural Service Centres. It also covers growth at Long Buckby Station and a hierarchy of rural villages.

The human version (we wrote this, not the council)This policy sets out strategic gaps, which keep settlements apart and stop them merging. A traveller passing through a gap should feel they have left one settlement, crossed open land and entered another. The gaps are between Tamworth and Polesworth and Dordon, between Dordon and Baddesley and Grendon, between Grendon and Atherstone, and between Atherstone or Mancetter and Caldecote or Nuneaton. Development that significantly harms the distinct character of those settlements will not be permitted. The supporting text also covers housing and employment need, including the 364 homes a year Standard Method figure and a Strategic Gap Study that is still under way.

The human version (we wrote this, not the council)This section sets out the Hertsmere Vision, called Delivering Better Futures, which is applied across four themes: Growing Opportunity, Strong Homes Secure Futures, Community Equals Place, and Delivering Excellence. It turns these themes into Strategic Objectives, listed A to K and not in order of priority. They include a thriving local economy, regeneration of Borehamwood and Potters Bar, meeting housing needs, affordable homes, a greener Borough and responding to the climate emergency, including a zero-carbon target by 2050. Each policy and allocation states which objectives it meets.

The human version (we wrote this, not the council)This section sets out the Plan's vision for Buckinghamshire in 2045. It describes a county that has kept its rural character, protected the Chilterns National Landscape and made the most of brownfield land (previously developed land). New communities are healthy, well designed and served by the right infrastructure, with housing for different groups including key workers. The economy has grown in creative industries, space and high-performance technology, town centres have been revitalised, and green spaces, biodiversity and sustainable travel have been strengthened.

The human version (we wrote this, not the council)This section considers development needs arising outside South Warwickshire. National policy requires councils to cooperate with neighbours on needs that cannot be met locally. There is no housing shortfall from the Coventry and Warwickshire Housing Market Area, and a shortfall from the Birmingham, Black Country and Solihull area has not been confirmed. The plan overprovides employment land against local need, which could help meet unmet needs from Coventry. Future cross-boundary needs will be explored through the West Midlands Spatial Development Strategy.

← Back to the plan search