The human version (we wrote this, not the council)This site allocation covers land east of the M1 for strategic B8 warehousing and logistics, as an extension of the Daventry International Rail Freight Terminal (DIRFT). A masterplan is needed before any application. Proposals must use low-carbon design, offer training, and provide for public transport and active travel. Landscape buffers must protect Crick, Clay Coton, Lilbourne and Yelvertoft. Heritage, landscape, noise, lighting, transport, flood risk and crime assessments are required. All vehicle access must go through the existing DIRFT site west of the M1, and drainage should maximise Sustainable Drainage Systems.
The human version (we wrote this, not the council)This policy supports Silverstone as an international venue for motorsport and high-performance innovation. Growth in advanced engineering and automotive technology is encouraged, along with education, business and skills work linked to motorsport. Proposals should show economic benefits, inward investment and collaboration between business, academia and the public sector. Development should complement existing uses and support the visitor economy, and must follow the Plan's placemaking, design and sustainability policies. Proposals must show functional links to Towcester and Brackley, and address cross-boundary infrastructure needs, working with Buckinghamshire Council.
The human version (we wrote this, not the council)This policy supports high quality sustainable strategic B8 and logistics development at Northampton Gateway. Ancillary uses are supported if evidence shows they are needed to support the site and its employees. Proposals must integrate low-carbon and renewable energy in design and construction, offer good quality training, and ensure transport connectivity, including public transport and cycling. Particular attention goes to better links with Northampton town and Roade village. Proposals must also set out how the natural environment, such as parkland and trees, will be maintained and managed.
The human version (we wrote this, not the council)This policy supports proposals that protect and enhance existing green and blue infrastructure and create more. New developments must protect, manage, maintain and connect existing assets. Major housing and commercial developments must deliver or contribute to green and blue infrastructure projects in proportion to the development, with a site-specific strategy or plan showing connections beyond the site. Proposals should show a positive contribution to projects in existing Green Infrastructure Plans and the National Green Infrastructure Framework. Green and blue infrastructure for major developments should be managed, maintained and monitored for at least 25 years.
The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.
The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.
The human version (we wrote this, not the council)This policy sets priorities for strategic connections, to be achieved by working with transport providers. For rail, it seeks faster and more frequent services between London, Birmingham and airports via Northampton, extra services, a multi-transport interchange in the Milton Keynes and Northampton areas, better links to Aylesbury and Bletchley, and more rail freight. For road, it seeks A45 traffic management, A43 improvements, a step-change in bus services including to Silverstone, better bus links to Northampton station, and more electric buses. It also supports using the canal network for freight.
The human version (we wrote this, not the council)This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.
The human version (we wrote this, not the council)This policy supports new or expanded overnight lorry parks where they meet an identified need. They should be next to the strategic road network, in particular the M1, A5, A14, A43 and A45, and include driver facilities. Access should avoid queuing on the highway, and sites must not be next to or reached through residential areas or unsuitable rural roads. They should promote safety through Secured by Design and aim for Park Mark Freight standards, avoid harm from noise, lighting and air quality, be screened and landscaped, and have a transport impact assessment and travel plan.
The human version (we wrote this, not the council)This section introduces the infrastructure chapter. It says infrastructure must be delivered alongside homes and jobs, guided by the Infrastructure Delivery Plan and its Phase 1 and Phase 2 reviews. It covers national policy, school places and green infrastructure. It lists infrastructure types in the plan, such as transport, healthcare, education, utilities and digital. Funding comes from Section 106, Section 278, the Community Infrastructure Levy and SAMM fees. The SAMM zone of influence around the Upper Nene Valley Gravel Pits SPA extends from 3km to 5.9km. The section also summarises transport and social infrastructure.
The human version (we wrote this, not the council)This section is the glossary of terms in the Plan, set out as a table of terms and descriptions in alphabetical order. It defines planning terms such as accessible homes, active travel, affordable housing, Air Quality Management Area, Article 4 Direction, amenity green space, ancient woodland, biodiversity, Brownfield Land Register and build to rent. For example, active travel is making journeys in physically active ways like walking, wheeling, cycling or scootering. Ancient woodland is an area wooded continuously since at least 1600 AD.
The human version (we wrote this, not the council)This section lists the Local Green Spaces designated by village, as defined in paragraph 106 of the NPPF. Each village name is followed by the document that designated the spaces: a Neighbourhood Development Plan, the Daventry Settlements and Countryside Local Plan Part 2, or the South Northamptonshire Local Plan Part 2. The list includes village greens, churchyards, allotments, playing fields, recreation grounds and pocket parks. Villages and towns shown include Arthingworth, Barby, Boughton, Brixworth, Crick and Daventry.
The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.
← Back to the plan search