The human version (we wrote this, not the council)This policy sets parking rules for new development. Parking must follow the standards in Appendix 3, including zone-based reductions in areas well served by public transport. In major schemes of 10 or more homes, 20% of spaces should be unallocated, supported by a parking management plan. Parking areas must not harm road safety, a building's setting or the character of an area, and need soft landscaping and surfaces that manage rainwater. Electric vehicle charging points are required, and car clubs are supported in suitable locations.
Health, schools & community
Health and wellbeing, GP and hospital capacity, schools, sport, open space, play areas and community buildings.
301 sections of the plan, in document order.
The human version (we wrote this, not the council)This section sets out the full Park and Ride policy. Alongside the Stratford-upon-Avon sites, including a possible 500-space facility near the Rosebird Centre, it supports a public transport interchange south of Coventry serving the University of Warwick, a potential 500-space facility linked to the Coventry and Warwick Investment Zone, and sites north of Leamington, west of Warwick and south of Leamington. Development near these areas of search must not obstruct future delivery. Locations were identified with Warwickshire County Council and are at different stages of development.
The human version (we wrote this, not the council)This policy manages the impacts of building work, deliveries and servicing. Construction Management Plans are required for sites close to the Strategic Road Network, and may be needed wherever highway safety or amenity could suffer; environmental management plans may also be required. Developments must show how deliveries, waste collection and servicing will work for their whole lifetime, ideally off street, without causing noise, obstruction or nuisance for residents and businesses. Delivery and Servicing Plans are required where vehicle movements could affect roads, the public realm or neighbours.
The human version (we wrote this, not the council)This policy asks development to make reasonable efforts to use local businesses, recruit local workers and provide training, skills, apprenticeships and other opportunities for Hertsmere residents, during construction and end use. Major development must provide for workplace training through a financial contribution calculated using Table 8.4, used for the Council's local labour scheme. Net loss of industrial capacity in designated and non-designated employment sites will be resisted unless part of plan-led consolidation. Where such loss occurs, a contribution is required, using £715 per job lost.
The human version (we wrote this, not the council)This policy says all major residential developments must provide public open space, on site where possible, or else make a financial contribution. Developers should provide for long-term upkeep. Public open space can only be lost if a replacement of equal or better quality and size serves the same area. New green space, play space, food growing and better walking and cycling access are strongly encouraged. Developments should protect habitats, support the Essex Nature Recovery Strategy and use nature-based SuDS where they can. Allotments can only be redeveloped if no longer needed or replaced. The Council will also support countryside recreation, more footpaths and horse-riding routes, and better local play areas.
The human version (we wrote this, not the council)This policy protects the district's canal and rivers. Development near waterways must protect and enhance waterway infrastructure. New permanent moorings and marinas are only allowed next to existing built-up areas, and must not harm nature conservation, heritage, navigation or the towpath, restrict leisure boaters' access to moorings, or increase flood risk. Major schemes beside waterways should consider providing new moorings or water-based leisure facilities, and look at using the canal for freight during construction or as a renewable energy source.
The human version (we wrote this, not the council)This site allocation re-allocates Daventry North East for residential development. Proposals must provide approximately 3400 dwellings. They need a masterplan agreed by the Council. They must also provide education, a local centre with community facilities and local employment, an open space network, and an extension to Daventry Country Park under policy D10. They need sustainable transport links to the town centre, Southbrook and Long Buckby Railway Station, towpath access with a contribution to the surface, and healthcare funding.
The human version (we wrote this, not the council)This section introduces the chapter on social, health and wellbeing. It explains that facilities such as libraries, places of worship, community centres, village halls, sports venues, theatres and pubs perform a vital function in the district's economic and social welfare. The plan strongly supports keeping and improving this community infrastructure, and expects a range of new social and community facilities to be provided as part of significant new development.
The human version (we wrote this, not the council)This policy protects community buildings and services. Development that would remove a community facility will not be allowed unless an equal replacement is provided on site, the need can be met by an accessible facility elsewhere, or evidence shows there is no demand and the building cannot serve another community use. Where a use is claimed to be unviable, marketing and financial evidence is required. New and improved facilities are supported in accessible locations, funded where needed through developer contributions. Facilities not open to the public, such as school sports halls, must agree community access.
The human version (we wrote this, not the council)This policy requires all development to be designed to promote healthy communities and reduce health inequalities. Schemes should provide open space, sport, recreation and cultural facilities, and safe walking and cycling routes. New health facilities should be located where there is a choice of sustainable transport. Allotments and community orchards are protected and food growing in new developments is encouraged. A Health Impact Assessment, a study of how a scheme affects people's health, is required for residential schemes of 100 or more homes and non-residential schemes of 1,000 square metres or more.
The human version (we wrote this, not the council)This section explains the green and blue infrastructure policy and sets measurable standards. Major developments must provide a green and blue infrastructure strategy. Commercial schemes must achieve an Urban Greening Factor score of at least 0.3 and residential schemes at least 0.4. Tree canopy must cover at least 14% of commercial sites and 20% of residential sites, or improve on existing cover if that is greater. These networks support wildlife, manage flood risk, store carbon and provide accessible space for recreation.
The human version (we wrote this, not the council)This policy requires development to protect existing public open space and provide new space for growing communities. Existing open spaces can only be lost if they are shown to be surplus or replaced with equivalent or better provision. Major developments must provide 5.67 hectares of accessible greenspace per 1,000 people, made up of parks and gardens (1.4ha), recreation grounds (0.5ha), natural and semi-natural greenspace (3.17ha) and amenity greenspace (0.6ha). Smaller schemes contribute pro rata, and all open space must remain publicly accessible permanently.
The human version (we wrote this, not the council)This section sets further open space requirements and explains how they apply. Developments must provide 0.86 hectares of community growing space, including allotments, per 1,000 households, and 0.5 hectares of play provision for children and teenagers per 1,000 people. Major schemes must submit an open space and play assessment. Off-site provision or payments are only accepted where on-site provision is genuinely not achievable. Student housing, care villages and retirement communities must contribute, and major commercial schemes may also need to provide open space.
Accessibility, Quality and Value of Open Space, Play, Recreation and Community
pp. 183–185The human version (we wrote this, not the council)This policy sets accessibility standards for open space and play areas. Every home in a major development must be within reach of a neighbourhood greenspace and a local or doorstep greenspace, with catchments ranging from 200 metres for a doorstep space to 5,000 metres for a district space of 100 hectares. Play areas have their own catchments, from 100 metres for small local play areas to 1,000 metres for larger equipped ones, and community growing spaces should be within 1 kilometre of new homes. Design should follow recognised guidance, including inclusive play and provision suited to teenage girls.
The human version (we wrote this, not the council)This policy sets out how Brackley's role as a Rural Service Centre will be supported and enhanced. New homes will come from within the town confines and from the allocations at Brackley East (B3), West of Brackley (B4), North of Radstone Fields (B5) and East of Radstone Road (B6). It supports economic investment in employment areas and the Brackley Business District, the vitality of the town centre, better connectivity and active travel, sports, leisure and tourism, green links, the historic environment and local biodiversity. It also seeks to protect the town's identity and prevent coalescence with neighbouring villages by resisting development outside the confines, unless Policy R5 allows it.
The human version (we wrote this, not the council)This policy sets out who will own and look after public open space created by development. Open space will be offered to the town or parish council or the local planning authority, along with a 30-year maintenance payment from the developer. A management and maintenance plan is required, including yearly joint inspections with the council. Handing open space to a private management company is only allowed in exceptional circumstances, after both the council and a residents' association have declined it. Open space must stay publicly accessible permanently.
The human version (we wrote this, not the council)This section explains how the open space stewardship policy will be enforced. Where a private company manages open space, the council keeps the right to inspect it and require remedial work, backed by planning enforcement if needed. If a residents' association route is used, the space should transfer to it within 5 years of the last home being occupied. The council may decline to adopt open space where costs or practical difficulties are too great. Detailed standards and methods for calculating maintenance sums are set out in Annex C of the plan.
The human version (we wrote this, not the council)This section introduces the community and leisure infrastructure policies. It explains that sustainable communities need access to facilities that support daily life and residents' health and wellbeing. The policies that follow protect existing sport, recreation and leisure facilities and secure new ones, protect community facilities such as local shops, halls and pubs, and support the area's arts and culture offer across South Warwickshire.
The human version (we wrote this, not the council)This policy protects sport, recreation and leisure facilities and requires new housing to support them. Facilities can only be lost if an equivalent replacement is provided, they are shown to be surplus, the benefits of the proposal clearly outweigh the loss, or the facility adds no real value to the area. New facilities must meet recognised sporting standards and be reachable by public transport, walking and cycling. Major developments must provide facilities on site or pay towards off-site improvements, calculated using Sport England's tools.
The human version (we wrote this, not the council)This section explains the evidence behind the sport and leisure policy. The Playing Pitch Strategy and Built Facilities Strategy inform decisions on protecting and providing facilities. Sport England's calculators estimate how many pitches and buildings a new development's population would need and the associated costs. Where a scheme is too small to justify a whole new pitch or facility, a contribution towards improving an existing site is recommended instead. The approach follows national planning policy on access to sport for health and wellbeing.
The human version (we wrote this, not the council)This policy protects community facilities that serve local needs. A facility can only be lost if a viability assessment confirms it has no realistic prospect of continuing, it has been actively marketed for at least 12 months at a realistic price for its lawful use, and similar facilities are easily accessible nearby or a comparable replacement is provided. Proposals for new or improved community facilities will be supported where they promote healthy, inclusive and safe communities.
The human version (we wrote this, not the council)This section explains which buildings count as community facilities and how any loss must be justified. The list includes local convenience stores, community halls, pubs, libraries, places of worship, local health facilities and nurseries, though it is not exhaustive. Applicants seeking to close a facility must supply at least two years of audited accounts, show they explored ways to improve viability, and normally provide five years of maintenance evidence. A marketing statement must set out the asking price, any price changes and all offers received.
The human version (we wrote this, not the council)This allocation describes Kingsbrook, a 306.6-hectare urban extension east of Aylesbury delivering 2,460 homes, 10 hectares of employment land, two primary schools, land for a secondary school, a neighbourhood centre and a major wetland park. Outline permission was granted in 2013 and the site is built as three villages. As of March 2025, 1,922 homes were complete with 538 remaining, and the Eastern Link Road and Stocklake Link have been finished. The whole development is expected to be complete by 2028.
The human version (we wrote this, not the council)This section sets the district's parking standards for cars, disabled parking, cycles, electric vehicles and powered two-wheelers. Standards vary by use, for example one space for a one-bedroom home and 2.5 spaces for homes with four or more bedrooms, and can be adjusted with robust evidence. In zones near stations, provision drops to 60% in Zone 1 around Rickmansworth station and 80% in Zone 2. For most uses, 20% of car spaces must have working electric vehicle charging, with a further 30% wired ready for future points.
The human version (we wrote this, not the council)This policy supports public electric vehicle charging points and community battery storage in principle, subject to good design and protecting residents and groundwater. Every new dwelling with an on-plot parking space should have a charge point. Where a residential building has more than 10 communal or allocated spaces, there should be at least one charge point per dwelling and ducting for the rest. In commercial schemes, 40% of spaces should have a charge point and the other 60% should have ducting. All disabled and car club spaces should have one, rated at least 7kW. Developments of 50 or more dwellings should submit an Energy Masterplan covering layout, heat loads and energy networks.
The human version (we wrote this, not the council)This policy prevents a harmful overconcentration of uses such as hot food takeaways, betting offices, casinos and bingo halls, payday loan shops, vape shops, pawnbrokers, nightclubs, drinking establishments and uses that add to local air quality issues. Concentration is assessed within a 400-metre radius, using the thresholds in Table 8.6. In Main and Local Town Centres, hot food takeaways must not exceed 10% of units. Shopping parades of 20 units or more can have a maximum of 2 takeaways. New takeaways visible from school access points must not undermine school healthy eating policies.
The human version (we wrote this, not the council)This allocation covers Terriers Farm, a 24-hectare site on the northern edge of High Wycombe, for an assumed 410 homes, which already have planning permission subject to legal agreements. The site must include a sport and recreation hub extending Hazlemere Recreation Ground, helping keep the development physically separate from Hazlemere. Development should retain the main north-south hedgerow, field boundaries, the pond and a wildlife corridor towards King's Wood, and contribute financially to the new primary school planned at Gomm Valley. Road, junction, bus stop and footpath improvements are also required.
The human version (we wrote this, not the council)This site allocation covers Long Buckby Station, allocated for housing and employment. A masterplan agreed by the Council is required. Proposals must provide approximately 1,000 dwellings east of Three Bridges Road and approximately 4 hectares of employment land west of Three Bridges Road. They must meet education needs, provide infrastructure including leisure, sport and community facilities, and contribute to Long Buckby Station improvements and active travel between the station and Daventry. They must also provide greenspace and wildlife corridors, healthcare funding and a transport contribution. Assessments cover heritage, landscape, ecology, highways, flood risk, noise, crime and minerals and waste.
The human version (we wrote this, not the council)This section introduces the transport chapter. It says Southend sits on a peninsula at the mouth of the Thames Estuary, with a mainly east to west transport corridor. The main roads are the A127 and A13/A1159, linking to the M25, the Dartford River Crossing and the A130. Two railway lines, the c2c line and the Great Eastern main line, link the city to London, and there are nine railway stations in the area. North to south links are limited, especially by public transport. Road congestion affects the economy and tourism, car ownership is just over one car per household, and electric charging points are limited.
The human version (we wrote this, not the council)This section sets out the approach to rural areas, which are home to around a third of the area's population. It keeps the three tier rural settlement hierarchy from the WNJCS: Primary Service Villages, Secondary Service Villages and Other Villages, plus Small Settlements and Hamlets. Villages were scored on services, facilities and public transport, then reviewed. Development is directed to settlement confines, and a single confines method now applies across West Northamptonshire. Development outside the confines is allowed only in prescribed cases, such as a lack of a five year housing land supply, a Housing Delivery Test result below 75%, or a single self-build plot with a local connection.