Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Health, schools & community

Health and wellbeing, GP and hospital capacity, schools, sport, open space, play areas and community buildings.

301 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy seeks a 'step change' in transport, working with partners on a modern integrated system. Developments must contribute to improvements in the Southend Infrastructure Delivery Plan and Local Transport Plan where related and necessary. New development must provide for walking, cycling, public transport and new highways. This includes improving the A127/A1159 corridor, better access to places such as Bournes Green New Neighbourhood, Fossetts Farm and London Southend Airport, and high-quality interchanges at places like Leigh Railway Station. Other aims include better buses, use of the River Thames and electric and hydrogen vehicle charging. Large traffic generating schemes will go to well served areas near the City Centre.

The human version (we wrote this, not the council)This policy says the Council will work with Hertfordshire County Council, health bodies, education providers, emergency services and others to identify needs, protect existing facilities and secure timely infrastructure for planned growth. Development must address the extra demand it creates, through direct provision, improving an existing facility, off-site provision or a financial contribution, guided by the Infrastructure Delivery Plan. Existing social and community infrastructure is safeguarded, and land identified for future infrastructure is also protected. Loss or relocation is supported where equivalent or better replacement provision is secured, and loss without it is permitted only where robust evidence meets the policy tests.

The human version (we wrote this, not the council)This section introduces the plan's approach to employment and road freight. It notes that employment sites can harm the road network if transport is not considered early, and that rising demand for large storage and logistics sites has increased lorry traffic. Policy EC.7 asks new employment development to improve sustainable transport access, cut freight carbon and support electric freight vehicles. Schemes that significantly increase freight movements must provide lorry parking, large developments need Travel Plans and transport assessments, and freight vehicles should avoid residential areas wherever possible.

The human version (we wrote this, not the council)This policy says development should be located and designed to improve health and wellbeing, encouraging walking, cycling and public transport and reducing reliance on private cars. Designs should put pedestrians, cyclists and public transport users first, with walking and cycling routes usable by first occupation. Access and traffic should not cause undue harm to the street scene, neighbours or highway safety. Schemes creating high travel demand should help fund off-site improvements such as bus priority measures. Proposals should show the network can cope, backed by a Transport Statement and Travel Plan Statement, or a Transport Assessment and full Travel Plan. Better railway stations, forecourts and step-free access will be supported.

The human version (we wrote this, not the council)This policy supports new, expanded, altered or reconfigured social and community infrastructure, giving significant weight to public-service infrastructure. Facilities must respond to an identified need, be well located, accessible by walking, wheeling, cycling and public transport, inclusive, well designed, and compatible with neighbouring uses. Proposals should make effective use of land and buildings, including co-location of compatible services, multi-purpose community hubs and shared use of facilities. Where community access is relied on to meet a need, it must be secured through a community use agreement or similar mechanism.

The human version (we wrote this, not the council)This policy aims to keep the highway and sustainable transport network safe and efficient while allowing growth. Major development, meaning 10 or more dwellings or a site of 0.5 hectares or more, must consider its effects on traffic, congestion, noise and air quality, and plan for servicing and emergency vehicles. It must use innovative ways to limit disruption during building and use, and deliver highway safety measures, including temporary ones during construction. In Southend Central neighbourhood, major schemes should reduce and combine freight and servicing trips, use technology for efficient deliveries, and provide on site servicing areas where practicable so goods and refuse vehicles can load and unload.

The human version (we wrote this, not the council)This policy says all development should meet the parking standards, including cycle parking, in Appendix 9. Residential standards may be applied flexibly in sustainable locations with frequent public transport, or where strict use would harm local character. On-street parking is only acceptable where the applicant shows there is capacity. Proposals must put pedestrians, disabled people and cyclists first, with safe, secure and covered cycle parking. Major schemes must provide safe access to public transport and for emergency vehicles. Car Club parking is supported, especially in car free or car lite schemes. Vehicle crossovers should not harm highway safety. A 'Park and Ride/Rail' is supported if it meets set requirements.

The human version (we wrote this, not the council)This policy aims to give people of all ages and abilities access to sports, recreation and play opportunities that are publicly accessible and inclusive. Existing sports and recreational facilities should be retained, and loss is supported only if they are genuinely surplus to needs or replaced with improved provision. Developments used by children and young people must increase play and informal recreation opportunities. New housing must include high-quality formal play provision meeting Table 9.1 standards, such as 0.55 hectares per 1,000 population for children and young people, and 0.80 for parks and gardens.

The human version (we wrote this, not the council)This allocation proposes an assumed 245 homes on 7.7 hectares of farmland east of Roman Field, on the edge of Stoke Hammond. The village's neighbourhood plan already allocates part of the site for around nineteen homes, which count towards the total. Building must avoid the flood zones in the south of the site, which should stay as green space. The scheme must also respect nearby heritage, including a listed building, the conservation area and probable Neolithic remains, and consider cross-boundary needs with Milton Keynes.

The human version (we wrote this, not the council)This allocation describes Shenley Park at Whaddon, a landscape-led new neighbourhood of about 99 hectares delivering at least 1,265 homes, a 110-bed care home or extra care facility, a primary school and a mixed-use local centre with healthcare. It requires a link road between the A421 and the Milton Keynes grid roads, improved buses and walking and cycling routes. A countryside buffer must protect Whaddon village, and ancient woodland including Thrift Wood must be retained. Development must follow a comprehensive masterplan and the Shenley Park Development Brief.

The human version (we wrote this, not the council)This policy aims to make sure enough burial space is available for current and future needs. The Council will protect existing cemeteries and burial grounds from development that would cause their loss or harm their operation. It supports expanding and making better use of existing cemeteries, and planning for population growth, ageing and the needs of faith groups. New or extended burial sites are supported where they meet an identified need, are large enough for long-term demand, and can be reached by sustainable transport. They must also provide supporting infrastructure and avoid unacceptable harm to residential amenity, highway safety, landscape and biodiversity.

The human version (we wrote this, not the council)This policy requires new development to protect, maintain, create and enhance habitats, and to add to a connected blue and green network, taking account of the Hertfordshire Local Nature Recovery Strategy. Proposals must consider the natural environment from the earliest design stage. They should improve links between green infrastructure assets, safeguard priority habitats, conserve the character of the Borough's landscapes and protect ecological connectivity. Green and blue infrastructure should serve several purposes, such as biodiversity recovery, sustainable drainage, better air quality, recreation and active travel. Proposals must also make arrangements for long-term management and, where appropriate, improve public access.

The human version (we wrote this, not the council)This allocation covers land at RAF Halton, an eighty-two hectare military base near Wendover due to close in 2030. It is allocated for an assumed 1,000 homes, a primary school and a new local centre reusing St George's Church. Half the site must be green infrastructure, with parkland, play space and links to Wendover Woods. Historic features, including the Registered Park and Garden and listed barracks, would be restored or converted. New roads, junction upgrades and mitigation for the Chilterns Beechwoods protected area are also required.

The human version (we wrote this, not the council)This policy sets criteria for new Gypsy and Traveller pitches and Travelling Showpeople plots. Sites must avoid significant harm to heritage, ecology and landscape designations, be a reasonable distance from schools, GP surgeries, shops and community facilities, and not be visually intrusive. Private sites are limited to a maximum of 15 pitches. Sites also need safe road access with turning and parking space, plus adequate water, electricity, drainage and waste services. Any permission will include conditions limiting pitch numbers and restricting occupancy to the travelling community.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Eastwood. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall development is welcomed in the Neighbourhood Centre and Passenger Transport Corridor. Employment floorspace will be protected, including at the Progress Road growth area. Densities may rise along Rayleigh Road where flats suit the local character. The policy seeks public realm improvements, urban greening, better parks such as Oakwood and Eastwood, and tree planting. It also promotes better links to Leigh Railway Station and London Southend Airport, and safer walking and cycling routes.

Policy N2

Leigh

pp. 253–255

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Leigh. New development must support healthy lifestyles and be matched by needed infrastructure. Existing homes, including family housing, should be safeguarded, and good quality windfall schemes are welcomed along the A13 Key Passenger Transport Corridor and in District and Neighbourhood Centres. It supports economic growth, including at Leigh Port, shops in Leigh District Centre, and visitor facilities around Leigh Old Town. Conservation Areas will be conserved. It seeks urban greening, better play space and tree planting. Transport aims include a Mobility Hub at Leigh Railway Station and better walking and cycling routes, including London Road and the Cinder Path.

The human version (we wrote this, not the council)This policy sets out how development must avoid harm from pollution. Proposals that would significantly increase pollution of air, soil or water, or cause harm through fumes, noise, light, smell or other emissions, will not be permitted. Neighbouring uses must be protected, following the agent of change principle. On air quality, some schemes need an air quality report and mitigation. For contaminated land, a preliminary risk assessment is needed where harm is possible. On water, proposals must support the Thames River Basin Management Plan, and some need a Water Framework Directive Assessment. Development that could harm groundwater, especially in Source Protection Zones, will not be permitted.

The human version (we wrote this, not the council)This allocation covers the Winslow Centre, the former Winslow Secondary School site of around six hectares, for an assumed 480 homes and a community library. Existing sports facilities must be replaced at the new settlement site north of Winslow before they are lost. Part of the land is safeguarded for East West Rail, so development must not conflict with the railway's delivery. Higher density is expected given the town centre location, with improved walking and cycling links to the station and schools.

The human version (we wrote this, not the council)This section describes Prittlewell and sets out its vision. The area has a historic core around St Mary's Church, the Grade I listed Prittlewell Priory in Priory Park, and Prittlewell Conservation Area. Key places include Southend University Hospital, Roots Hall and London Southend Airport just to the north. There are five Local Centres, two employment areas at Priory Works and Thanet Grange, and two Air Quality Management Areas. The vision is for better parks, play areas, tree cover and walking and cycling links, cleaner air, and better access to the airport and Prittlewell station. New homes will focus on passenger transport corridors.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Prittlewell. New development must support health and wellbeing and be matched by the infrastructure it needs. Urban greening along the A127 is encouraged to help air quality. Existing homes are safeguarded and new homes come from sites in Policy N3i. The employment areas at Thanet Grange and Priory Works are protected. The policy supports renewing Roots Hall stadium, linked to Fossetts Farm. It aims to conserve Prittlewell Conservation Area, protect green space, plant trees and avoid flood risk. It also backs better bus, walking and cycling routes, step free access at Prittlewell station and growth at London Southend Airport.

The human version (we wrote this, not the council)This policy protects and expands the Borough's publicly accessible open spaces. Loss of or harm to open space, including parks, playing fields and allotments, is only permitted in exceptional cases. These include where the space is surplus to requirements, where equivalent replacement is provided, or where substantial public benefits clearly outweigh the loss. Development must provide new or better open space where its needs require this. Major proposals should include publicly accessible open space on site wherever practicable, or off-site provision or contributions where that is impracticable. New spaces should be safe, inclusive, multifunctional and well managed. Ancillary uses on open space are supported if they are necessary and proportionate.

The human version (we wrote this, not the council)This policy requires new non-residential buildings of 100 square metres or more, where viable, to achieve net zero operational energy use. Space heating demand must be no more than 15 kWh per square metre a year in schools and light industrial buildings. Total energy use targets are 52 kWh per square metre a year for primary schools and 35 for unrefrigerated light industrial buildings, while other uses must disclose their energy use and keep regulated energy within 30. On-site renewable electricity must match the building's annual total energy use, and targets can be met as a site-wide average.

The human version (we wrote this, not the council)This section explains the non-residential net zero policy in detail. Buildings must not use fossil fuels except for safety-critical backup, and schemes of 1,000 square metres or more should follow an assured performance method through design and construction. Where on-site renewables fall short, developers must pay an offset contribution, starting at £2.03 per kWh, ring-fenced for local renewable energy projects. Building-mounted solar panels are preferred, standalone commercial power stations do not count towards the target, and accurate energy prediction methods such as Passivhaus Planning Package or CIBSE TM54 are required rather than standard building regulations calculations.

The human version (we wrote this, not the council)This section describes Westcliff and sets out its vision. Westcliff lies between Leigh and Southend Central and has the highest population density in the city, at around 46 homes per hectare. Many older houses have been split into flats. Shops focus on the District Centre at Hamlet Court Road and along the A13 London Road. It has little Protected Green Space, and tree cover is the lowest in the city at 8.5%. The vision keeps Hamlet Court Road as the focus for daily life and makes the A13 a focus for new homes. It also aims to conserve heritage, improve streets and add green space and play facilities.

The human version (we wrote this, not the council)This allocation supports an assumed 210 homes on 10.75 hectares southwest of Buckingham Road, Padbury. The site is split into two parcels separated by playing fields designated as Local Green Space. A comprehensive masterplan must be approved before any planning application is decided. Developers must show that vehicle access can reach all parts of the site, which is straightforward for the south-east parcel from the A413 but harder for the north-west parcel next to the Padbury Conservation Area and its listed buildings.

The human version (we wrote this, not the council)This policy sets out specific requirements for development in Westcliff. New development must support health and wellbeing and be matched by the infrastructure it needs. Existing homes, including family housing, are safeguarded, and new homes come from sites in Policy N4i. Good quality windfall schemes along the A13 Key Passenger Transport Corridor and in the centres will be positively considered. The policy seeks a balance on homes in multiple occupation. It protects shops, visitor accommodation, Conservation Areas and the foreshore. It also seeks new green space, play space, tree planting and flood protection, and supports better walking routes along London Road and improvements to Westcliff railway station.

The human version (we wrote this, not the council)This policy protects and supports allotments, community gardens and food growing. Existing allotments and community gardens will be protected where they help local food production, biodiversity, recreation and wellbeing. The loss of an allotment or community garden is not permitted unless there is a clear surplus, or equivalent or better replacement is secured in a suitable location. New food-growing opportunities in urban areas are supported, including on vacant or underused land. New food-growing spaces should be built into the layout of development, be safe and accessible, have sunlight and water, and have long-term management. Major residential and community schemes are encouraged to include food growing.

The human version (we wrote this, not the council)This section introduces the chapter on enhancing South Warwickshire's built and natural environment, starting with the natural environment. It notes that key habitats and species are in worrying decline locally, and that development under the plan must not come at nature's expense. Instead the plan will protect and enhance existing ecological assets and include proposals for country parks and biodiversity enhancement areas. It previews policies on protected sites, nature recovery, Biodiversity Net Gain, trees and hedgerows, landscape management and farmland.

The human version (we wrote this, not the council)This policy deals with heat risk. Development must reduce its effect on the urban heat island through building and space design, materials and urban greening. New development must be designed to cut the chance of internal overheating and reliance on air conditioning, and proposals are supported only if priority is given to feasible measures high in the cooling hierarchy. Major development must submit an Energy Statement showing how this is met. Major schemes with public realm should create comfortable spaces with shade and passive cooling, giving priority to urban greening. The explanation refers to CIBSE guidance TM59, TM52 and TM49, and resists loss of soft landscaping.

The human version (we wrote this, not the council)This policy sets carbon rules to help the Borough become net zero-carbon. Major development must be net zero-carbon, with an on-site cut in carbon emissions of at least 35% beyond the Part L baseline of the Building Regulations 2021 Future Home Standard, and must minimise unregulated emissions. Where net zero cannot be reached on site, developers must pay into Hertsmere's carbon offset fund or provide off-site measures. Payments use a formula with a charge of £100 per year for every tonne of CO2 offset, over an assumed 30 years. Major schemes are encouraged to assess embodied carbon, and must set out their approach in an Energy Strategy.

← Back to the plan search