The human version (we wrote this, not the council)This policy protects the county's most important nature sites, including the Chilterns Beechwoods, Burnham Beeches and Aston Rowant Special Areas of Conservation. Proposals must show they will not harm these sites, and a Habitats Regulations Assessment is required. The plan sets a 500 metre exclusion zone for new housing around Burnham Beeches and the Ashridge part of the Chilterns Beechwoods. Within wider Zones of Influence, developments must fund alternative green spaces (SANGs) and visitor management measures to reduce recreational pressure. Several strategic SANG sites and a Gateway site are allocated.
Flooding & water
Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.
139 sections of the plan, in document order.
The human version (we wrote this, not the council)This section sets out the scores used for the Urban Greening Factor, which measures how much green cover a new development provides. Table DM8.2 lists 22 surface cover types, each with a factor score from 1.0 down to 0.0. Retained or new semi-natural vegetation and wetlands score highest at 1.0. Trees, hedges, food growing areas and flower rich planting score between 0.9 and 0.6, and amenity grassland scores 0.4. Green roofs score from 0.8 to 0.3 and green walls 0.5, depending on type. Drainage and water features range from 1.0 to 0.2. Paved surfaces score lowest, with permeable paving at 0.1 and sealed surfaces such as concrete at 0.0.
The human version (we wrote this, not the council)This policy covers the 329 hectare Little Marlow Lakes area between Marlow and Bourne End, which sits in the Green Belt beside the River Thames. It allocates Spade Oak Lake as a strategic alternative green space (SANG) to reduce visitor pressure on Burnham Beeches, with parking off Muschallick Road, and supports wider outdoor recreation. Qualifying developments relying on the SANG must contribute financially and provide safe walking and cycling links between Marlow and Bourne End. Development must protect the river setting, lakes, wildlife, conservation areas and manage flood risk.
The human version (we wrote this, not the council)This section describes proposal HEN.1 at Henley-in-Arden, a 125-hectare masterplanned development of at least 2,084 homes, largely on the golf club land, delivered from 2029/30 to 2044/45. It includes 3.3 hectares of employment land, a two-form entry primary school, expansion of the secondary school with a new sixth form, 9 Gypsy and Traveller pitches, and a new country park at Beaudesert Mount. A link road from the A3400 to the A4189, including a new rail bridge, will let through traffic bypass the town centre. The site will be released from the Green Belt.
The human version (we wrote this, not the council)This policy manages noise, air quality and contaminated land. Noise-generating developments must include attenuation measures, and noise-sensitive uses such as homes, schools and hospitals will not be supported where users would suffer from existing noise. Developments that may worsen air quality must submit an air quality impact assessment, particularly within Air Quality Management Areas, and road traffic is identified as the county's main source of air pollution. Development on land that may be contaminated requires an assessment, with remediation normally completed before first occupation.
The human version (we wrote this, not the council)This section covers proposal LEA.1 at Blackdown, north of Leamington Spa. Some 72 hectares will be released from the Green Belt for at least 1,043 homes on about 37 hectares, plus roughly 35 hectares of public open space, delivered between 2031/32 and 2041/42. The scheme includes a two-form entry primary school, a community hub and safeguarded land for expanding North Leamington School. Land may also be needed for a future Park and Ride, and the site must contribute to the Kenilworth to Leamington cycle route.
The human version (we wrote this, not the council)This site allocation covers Imperial Place on Elstree Way, Borehamwood, a privately owned 2.2 ha site of office buildings and a multi-storey car park. It is allocated for comprehensive mixed-use regeneration delivering at least 550 new homes in the first half of the plan period, with employment and workspace retained, re-provided or intensified, plus public realm and green infrastructure. Parts of the site lie in Flood Zones 2 and 3, and a culverted watercourse runs along its eastern boundary. A site-wide masterplan is required. Development must respond to the operational needs of Elstree Studios and neighbouring employment uses.
The human version (we wrote this, not the council)This policy requires developments to show they will have adequate water supply, foul drainage and sewage treatment capacity before homes are occupied, with phasing conditions used to enforce this. New buildings are expected to connect to mains drainage. The evidence shows 34 wastewater treatment works need upgrades to accommodate planned growth. A related policy (IN4) safeguards two strategic water sites: land at Galley Lane near Stoke Hammond for the Grand Union Canal water transfer project, and land west of Iver for a possible new drinking water treatment works.
The human version (we wrote this, not the council)This section describes proposal COV.2 at Coventry Airport, a 117-hectare site released from the Green Belt for advanced manufacturing and engineering, reflecting its place in the West Midlands Investment Zone. It particularly targets battery manufacturing for electric vehicles. At least 60% of floorspace must be industrial or research uses, warehousing cannot exceed 40%, and very large warehouse units over 32,500 sq m are not supported unless tied to manufacturing. Applications must include a marketing strategy showing how investment in these sectors will be attracted.
The human version (we wrote this, not the council)This site allocation covers land north of Allum Lane, Elstree, Borehamwood, a privately owned 22.18 ha site of undeveloped land and golf course. It lies in the Metropolitan Green Belt. It is allocated as an urban extension of at least 486 homes, expected to be medium-density and low-rise, including genuinely affordable homes, in the first half of the plan period. Planning application 26/0318/OUT seeks outline consent for 136 dwellings. Constraints include a public right of way, surface water flood risk, tree preservation orders and the setting of two Grade II listed buildings at Nicoll Farm. A site-wide masterplan and phased infrastructure are required.
The human version (we wrote this, not the council)This section covers proposal SOU.1, land east of Southam delivering at least 3,122 homes across 201 hectares between 2028 and 2045. It includes 2.8 hectares of employment land, 13 Gypsy and Traveller pitches, three primary schools, a new secondary school plus a one-form expansion of Southam College, and two local centres. Densities of at least 40 homes per hectare apply. Bus services must improve, including a half-hourly service to Leamington, and development must keep a strong sense of separation between Southam and Napton on the Hill.
The human version (we wrote this, not the council)This policy directs development to areas at the lowest risk of flooding from all sources, taking account of climate change. Inappropriate development in high or medium flood risk areas will not be supported, and the functional floodplain is safeguarded for storing flood water. Site-specific Flood Risk Assessments are required for development in at-risk areas and all sites over 1 hectare, and sites of 50 or more dwellings need a strategic drainage strategy. Building over existing culverts is not allowed, and all developments in Chesham and High Wycombe need a surface water drainage strategy.
The human version (we wrote this, not the council)This policy requires all new development, except most householder schemes, to include Sustainable Drainage Systems (SuDS), which mimic natural drainage by slowing and storing rainwater on site. Run-off must not materially increase, with greenfield sites limited to existing greenfield rates. Schemes must show no flooding in a 1 in 30 year storm and safe containment of a 1 in 100 year storm plus climate change. A drainage hierarchy applies, preferring rainwater reuse and infiltration over sewer connections, and long-term maintenance plans must be secured.
The human version (we wrote this, not the council)This policy sets water efficiency standards for new development, reflecting that the South East is classed as under serious water stress. All new dwellings must achieve a standard of 85 litres per person per day, or any tighter future national requirement. Non-residential development must achieve full credits in the BREEAM water calculator, with at least three credits under the Wat01 measure. Refurbishments and changes of use must be retrofitted to the same standards. The approach aims to protect the chalk aquifer and the Chilterns' chalk streams from over-abstraction.
The human version (we wrote this, not the council)This section describes proposal WAR.1, 51 hectares west of Warwick Racecourse delivering at least 850 homes between 2031/32 and 2040/41. The scheme includes a new country park with play areas, sport and flood management, plus a new off-road walking and cycling route across the A46 to Warwick Parkway station. A spine road will link Hampton Road and Old Budbrooke Road. Built development must avoid the flood-prone eastern part of the site and protect the character of the Warwick Conservation Area, with the racecourse running flat retained or relocated.
The human version (we wrote this, not the council)This policy requires development in Potters Bar to protect and enhance the town's character, heritage, green and blue infrastructure and landscape setting. Proposals should respond to local scale and townscape, protect heritage assets, and place taller buildings only where they fit. They should protect trees, parks and habitats, improve ecological links, and enhance Potters Bar Brook as a blue-green spine. Sustainable drainage is expected. Development at the edge of the town must be landscape-led and comprehensively planned, and must avoid unacceptable coalescence with nearby settlements.
The human version (we wrote this, not the council)This section provides the plan's glossary, defining the planning terms and acronyms used throughout the document, from accessibility and affordable housing to water neutrality. It explains concepts such as biodiversity net gain, brownfield land, the Community Infrastructure Levy, Green Belt and Grey Belt, flood zones, Section 106 contributions, sustainable drainage systems and the standard method for calculating housing need. It is a reference tool to help readers understand the technical language in the rest of the plan.
The human version (we wrote this, not the council)This site allocation covers Land rear of Park Avenue, east of Southgate Road, Potters Bar, a 17.4 ha publicly owned site of agricultural land. It proposes an urban extension delivering at least 260 homes, with compatible community and open space uses and walkable neighbourhoods linked by walking and cycling routes to the High Street District Centre. The site is confirmed as grey belt. Development must follow a site-wide masterplan under Policy DM3 and keep and enhance the mature field-edge trees on the southeastern boundary, which with the M25 will form a defensible Green Belt boundary.
The human version (we wrote this, not the council)This section is Appendix 1, a table of abbreviations used in the Local Plan, with the meaning of each. It covers planning, environmental and technical terms. Examples include AMR for Authority Monitoring Report, BNG for Biodiversity Net Gain, CIL for Community Infrastructure Levy, HELAA for Housing and Employment Land Availability Assessment, IDP for Infrastructure Delivery Plan, LNRS for Local Nature Recovery Strategy, NPPF for National Planning Policy Framework and SuDS for Sustainable Urban Drainage Systems. It also lists organisation names such as the Environment Agency.