The human version (we wrote this, not the council)This allocation covers the Council Offices site on Queen Victoria Road, High Wycombe, for a mixed development of 500 square metres of offices, retail and healthcare plus an assumed 150 homes for NHS key workers. The 1.04 hectare site is in NHS ownership beside the River Wye. Because of high flood risk, housing is not allowed in the most flood-prone areas, and developers must produce detailed flood modelling approved by the Environment Agency before applying.
Flooding & water
Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.
139 sections of the plan, in document order.
The human version (we wrote this, not the council)This allocation proposes an assumed 270 homes and around 1,125 square metres of town centre retail on the former Office Outlet site in High Wycombe. The 0.45 hectare brownfield site is close to the railway station, so a high-density, landmark scheme with fewer car parking spaces is expected. Housing must avoid the highest flood risk zones, and developers must carry out detailed surface water modelling and follow the Council's flood risk guidance for the site.
The human version (we wrote this, not the council)This allocation sets out a mixed redevelopment of the Chilterns Shopping Centre at Frogmoor, High Wycombe, with an assumed 300 homes above flexible shops and commercial space at ground level. Flooding is the main constraint: 91% of the 1.06 hectare site is in the highest risk flood zone, so off-site flood storage would be needed and no building is allowed in those areas. The site is in a conservation area, and Grade II listed buildings must be kept and enhanced.
The human version (we wrote this, not the council)This allocation supports an assumed 305 homes on 7.57 hectares of land north of Newton Longville, on the southern edge of Milton Keynes. The development must fund a new bus route into Milton Keynes and a 3 metre wide shared path for walking and cycling between the two settlements. Housing must be steered away from the higher flood risk zones, and the scheme must not prejudice the delivery of East West Rail, as part of the land is safeguarded for the railway.
Land south of Drayton Road, Newton Leys & land west of Stoke Road, Newton Leys
pp. 226–229The human version (we wrote this, not the council)This allocation sets out a large residential development of an assumed 3,780 homes on around 94.5 hectares south of Newton Leys, near Bletchley. It includes a new primary school, a local centre with community facilities and healthcare provision. Density would be highest near Milton Keynes and reduce towards the countryside. A watercourse crosses the site, so flood risk must be managed and housing is not allowed in the highest risk zone. The western part already has outline permission for up to 290 homes, granted on appeal in February 2026.
The human version (we wrote this, not the council)This allocation proposes an assumed 245 homes on 7.7 hectares of farmland east of Roman Field, on the edge of Stoke Hammond. The village's neighbourhood plan already allocates part of the site for around nineteen homes, which count towards the total. Building must avoid the flood zones in the south of the site, which should stay as green space. The scheme must also respect nearby heritage, including a listed building, the conservation area and probable Neolithic remains, and consider cross-boundary needs with Milton Keynes.
The human version (we wrote this, not the council)This allocation supports an assumed 1,240 homes on around thirty-one hectares west of Shenley Park, Whaddon, continuing the planned expansion to the east. It includes a primary school for 210 pupils with a 30 place nursery. Two ancient woodlands, Thickbare Wood and Coddimoorhill Wood, need protective buffers of 50 metres, and an archaeological dig of a Roman settlement must inform the layout. Detailed traffic modelling, likely including improvements to the A421, and extensive flood risk work are also required.
The human version (we wrote this, not the council)This allocation covers the former Inov8 site on Tingewick Road, Buckingham, a brownfield site vacant for over a decade and owned by the University of Buckingham. It is allocated for up to 2.7 hectares of academic uses including an assumed 300 student accommodation units. If the university's needs are met elsewhere, the site would instead take an assumed 125 homes. No living accommodation is allowed in Flood Zone 3, and development must respect protected trees, the River Great Ouse and Buckingham's historic character.
The human version (we wrote this, not the council)This allocation supports an assumed 30 homes at Albany Place Car Park in central Chesham. The 0.35 hectare site includes the 330-seat Elgiva Theatre, which must be re-provided in a suitable town centre location, and seventy-one parking spaces that must be replaced unless shown to be unnecessary. Flood risk is significant, with off-site flood storage required and no housing allowed in the highest risk zone. Permission also depends on mitigation being in place for the nearby Chilterns Beechwoods protected area.
The human version (we wrote this, not the council)This allocation proposes an assumed 55 homes at Water Meadow Car Park, one of Chesham's main long-stay town centre car parks. Public parking must be kept on site or replaced centrally unless evidence shows fewer spaces are needed, and existing walking routes retained. The site is in the Chesham Conservation Area, so designs must protect its character. Contributions towards Lowndes Park open space and play areas are required, along with flood risk measures and mitigation for the Chilterns Beechwoods protected area.
The human version (we wrote this, not the council)This allocation sets out a mixed development at Princes Risborough Station with an assumed 80 homes, small-scale convenience shops, a new public square with bus interchange, and possibly a hotel. The site must safeguard a route for part of the Princes Risborough Relief Road, linking Summerleys Road and Picts Lane to relieve traffic on Poppy Road. Opening up the culverted Horsenden Stream is encouraged to improve wildlife and manage flooding, and housing must be steered away from the flood risk zones.
The human version (we wrote this, not the council)This policy deals with the Borough's watercourses and blue infrastructure. Development should respond to the ecological, recreational and character value of waterways, and protect and enhance the quality of the borough's chalk streams. Proposals on sites containing or next to a main river, ordinary watercourse or other water space must keep an undeveloped buffer of at least 10m, managed for ecology and biodiversity. They must look to restore river channels and floodplains, remove barriers to wildlife including by de-culverting where feasible, and avoid new culverts or permanent overshading. They should also improve public access, with areas for people and for wildlife, and provide life-saving equipment and signage.
The human version (we wrote this, not the council)This allocation describes Aston Clinton North, a mixed development of an assumed 1,660 homes and 33,000 square metres of industrial and warehouse space on around 52 hectares of farmland. It includes a primary school and a local centre with a community hall, healthcare provision and about 1,000 square metres of shops. Access would connect to the A41 and local roads. Detailed flood modelling of the Wendover Brook is required, and permission depends on mitigation for the Chilterns Beechwoods protected area being in place.
The human version (we wrote this, not the council)This policy sets out how development must avoid harm from pollution. Proposals that would significantly increase pollution of air, soil or water, or cause harm through fumes, noise, light, smell or other emissions, will not be permitted. Neighbouring uses must be protected, following the agent of change principle. On air quality, some schemes need an air quality report and mitigation. For contaminated land, a preliminary risk assessment is needed where harm is possible. On water, proposals must support the Thames River Basin Management Plan, and some need a Water Framework Directive Assessment. Development that could harm groundwater, especially in Source Protection Zones, will not be permitted.
The human version (we wrote this, not the council)This policy sets standards for new homes. 5% of new homes must meet Building Regulations Part M4(2). Where the Council allocates or nominates occupants, 10% of homes must meet M4(3)(2)(b), and 5% of all new market dwellings must meet M4(3)(2)(a). These are applied across the housing mix, and may be waived where robust evidence shows a site is unsuitable, for example because of flooding or topography. The internal floor area and storage of all new build homes must meet National Space Standards. All new homes must comply with a water efficiency limit of 110 litres per person per day.
The human version (we wrote this, not the council)This allocation describes Hollands Farm, a 23.7 hectare greenfield site in Bourne End, for an assumed 470 homes and a new one form entry primary school. A new spine road would link Millboard Road and Hedsor Road, with a bus service redirected through the site. The scheme must respect the nearby Hedsor Road and Riverdale Conservation Area, keep Harvest Hill separate, and protect the former orchard. Permission will not be granted until mitigation for the Burnham Beeches protected area is in place.
The human version (we wrote this, not the council)This policy covers Houses in Multiple Occupation. In Northampton, proposals are supported if fewer than 10% of dwellings within a 50m radius are HMOs, and they would not create a continuous frontage of two or more HMOs or sandwich a single self-contained home between two HMOs. Across West Northamptonshire, proposals must show they protect amenity and living standards, meet the Council's space standards, and provide car parking, secure cycle storage, refuse storage and external amenity space. They must not increase flood risk, and ground floor bedrooms are not allowed where flooding would put occupants at risk.
The human version (we wrote this, not the council)This allocation sets out a 29 hectare mixed employment-led development off Drakes Drive, Long Crendon, next to the existing industrial park. Around 7.7 hectares would be business, industrial and storage space, alongside leisure uses that complement rather than compete with local facilities. Buildings must be directed to the lowest flood risk areas, with none allowed in the highest risk zone. The scheme must improve buses and provide safe walking and cycling links to Long Crendon, Thame, Haddenham and Aylesbury, guided by a site-wide masterplan.
The human version (we wrote this, not the council)This policy sets out requirements for the City Centre. It will be a main focus for growth and the first choice for shops and town centre uses. In the main shopping area, ground floor homes will be resisted, an Article 4 Direction may be used, and homes on upper floors are supported. New homes, higher densities and taller buildings are supported, with heritage assets and key views, such as the Pier and the Kursaal, protected. The policy lists street improvements for each zone, including making Chichester Road a green street. Policy N5ai allocates sites, including Better Queensway for about 1,760 homes and Victoria Avenue West for about 847.
The human version (we wrote this, not the council)This section sets out the full requirements for trees, hedges and woodlands. Development must keep buffer zones around ancient woodland and veteran trees, design retained trees into streets, open spaces and drainage from the start, and deliver a measurable increase in tree canopy cover. All planting must use native, climate-resilient species and have maintenance plans, including replacing failed planting. The justification notes tree cover is uneven across the area and points to recognised standards such as BS 5837 for tree protection and the UK Forestry Standard.
The human version (we wrote this, not the council)This policy makes the Central Seafront the focus of the city's leisure and tourism offer. It supports new attractions, hotels and the reuse of poor or empty sites, while protecting heritage and the foreshore wildlife sites. All development must manage flood risk and needs a Habitats Regulations Assessment. Building south of the sea wall that could harm protected sites or foreshore views will not normally be allowed. New homes and taller buildings are supported. Improvements include better links to the High Street, an upgraded Cliffs Pavilion space and a boost to the Golden Mile. Policy N5bi allocates sites, including the Pier, the Kursaal, the former Gas Works and Marine Plaza.
The human version (we wrote this, not the council)This policy sets out how development must manage flood risk. Proposals must apply a sequential approach, not increase flood risk, leave an undeveloped setback from watercourses, and stay safe and operational in a flood. A site-specific Flood Risk Assessment is required in Flood Zones 2, 3a and 3b, for all major development in Flood Zone 1, and elsewhere where other flood sources may affect a site. Schemes passing the Sequential and Exception Tests must put vulnerable uses in the lowest risk areas, avoid net loss of flood storage and include safe access and egress. A Flood Emergency Response Plan is required where appropriate.
The human version (we wrote this, not the council)This policy covers water supply and wastewater. New or expanded water supply and wastewater facilities are supported where they meet needs shown in an asset management or similar plan, avoid unacceptable harm and are built in a timely and sustainable way. Development must show that water supply and sewer networks have enough capacity, or that provision will be made before occupation. Surface and foul water systems should be separated, and mains foul drainage is preferred over non-mains drainage. Proposals should be water efficient and use SuDS. Development in a Source Protection Zone is supported only where there is no risk to groundwater, or adequate mitigation.
The human version (we wrote this, not the council)This section sets out the full waterways policy. Development affecting waterways must not harm water quality, heritage, landscape, biodiversity or the usability of towpaths, and should improve access and active travel routes. On navigable waterways, moorings and marinas are supported where they do not damage the waterway or its surroundings, with canal regeneration encouraged, notably around the Grand Union Canal Conservation Area. Culverts are permitted for access only. Major schemes should consider new moorings for boat dwellers and strategic opportunities such as the Tach Brook re-naturalisation and a River Avon Linear Park.
The human version (we wrote this, not the council)This policy supports proposals that deliver the aims of the West Northamptonshire Tree and Woods Strategy, the UK Tree Strategy and the England Tree Action Plan, to increase tree cover, protect woodland and connect people to trees. It supports expanding and linking woodland habitats, conserving ancient woodland and veteran trees, protecting high quality and amenity trees, and more street trees in urban areas. Tree planting should be targeted where green infrastructure benefits are greatest, including low-grade farmland and land needing remediation. It also supports sustainable public access to woodlands and positive woodland management.
The human version (we wrote this, not the council)This policy protects water quality in rivers, canals, lakes, reservoirs and groundwater. Development will only be supported where it does not harm surface or underground water bodies, and proposals should look for chances to improve water quality. Schemes affecting designated wildlife sites or water catchments must show how quality will be maintained and pressure on the wastewater network reduced. Extra safeguards apply in Drinking Water Safeguard Zones and Source Protection Zones, including restrictions on soakaways and infiltration drainage, and a Water Framework Directive assessment is required where development could harm a waterbody.
The human version (we wrote this, not the council)This policy requires development to conserve and enhance watercourses and their corridors, including their biodiversity, landscape, flood management and recreation value. Culverting or hard engineering of watercourses is not supported, and opportunities to restore rivers to a more natural state should be actively pursued. Development next to a watercourse must keep a natural buffer of at least 10 metres from the top of the bank, with no lighting, rising to at least 15 metres for chalk streams such as the River Chess and River Misbourne. Chalk streams are a globally rare habitat with stronger protection.
The human version (we wrote this, not the council)This policy covers development in the Nene Valley Nature Improvement Area. Development there will be permitted where it enables the functioning of the Nature Improvement Area and, where appropriate, contributes to opportunities for habitat creation or habitat management within it. The policy sets two tests. The first is that the development enables the area to function. The second is that, where appropriate, it adds to habitat creation or habitat management in the area. The policy links to Plan objectives 1 to 7.
The human version (we wrote this, not the council)This policy protects and enhances the natural and cultural environment of river corridors and their tributaries. Proposals must show they understand the river's importance for biodiversity and natural capital. Development likely to harm a watercourse's functions and setting will not be permitted. In previously undeveloped areas, an undeveloped buffer of at least 10m from the top of the bank must be kept on both sides, planted with native species, with no new domestic gardens. A working methods statement and a long-term Landscape Ecological Management Plan are required. Culverting and hard bank revetment are not supported, de-culverting is supported, and groundwater must not be harmed.
The human version (we wrote this, not the council)This section covers proposal BIT.2 at Red House Farm, south-west of Bishop's Tachbrook. The 160-hectare site provides around 121 hectares of strategic employment land, totalling 3,750,000 sq ft of floorspace mainly for logistics and industry. The developer will fund a new M40 junction to replace junctions 13 and 14, plus a dual carriageway link road to Warwick and Leamington. The scheme also includes a Park and Ride, a central mixed-use hub, 39 hectares of green and blue infrastructure, and a travelling showpersons yard of at least 6 plots. Delivery runs from 2027 to 2034/35.