The human version (we wrote this, not the council)This site allocation covers Land north of Newport Pagnell Road in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 1,000 dwellings, education provision, a local centre, open space, a leisure and sports contribution, and structural greenspace and wildlife corridors. Active travel and public transport are to be prioritised, with healthcare and transport contributions. Assessments are required, including highways impact on the A45 and M1. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with two years of overwintering bird surveys before submission.
Flooding & water
Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.
139 sections of the plan, in document order.
The human version (we wrote this, not the council)This site allocation covers Land west of the A43 in Northampton, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery. Proposals must provide approximately 2,900 dwellings, education provision, a local centre with retail, community and health uses, open space, and structural greenspace and wildlife corridors. They must leave a gap between development and Moulton village and provide active travel links to it. Heritage effects, including on the Moulton conservation area, must be assessed. Healthcare and transport contributions are required. Impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed, with overwintering bird surveys.
The human version (we wrote this, not the council)This policy prevents development that would cause, or be harmed by, unacceptable pollution, covering land contamination, air, water, noise, vibration, light, odour and land instability. Building on or near former landfill or suspected contaminated land is only allowed where there is no threat to future users or to groundwater. Development must not worsen air quality, particularly in the district's two Air Quality Management Areas near the M25 at Chorleywood. Noise-generating and noise-sensitive uses must be kept apart or mitigated, and external lighting must be the minimum needed, avoiding harm to neighbours, wildlife and the countryside.
The human version (we wrote this, not the council)This site allocation is for 100 dwellings at Meriden Road, Hampton in Arden. The site measures about 3.4 hectares and sits next to land allocated in the SLP 2013, and the two should ideally be linked. It would reuse a former ammunitions depot, which is a brownfield site. Development should keep TPO trees and hedgerows, place open space and play at its heart, and have higher density housing reducing towards the Green Belt edge. There should be no building in higher flood risk zones, and above ground SuDS are needed. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to the rail station.
The human version (we wrote this, not the council)This section sets out the employment site allocations. Evidence in the South West Herts Economic Study (2024) found no need for new office sites, and recommends resisting any loss of office space. Four existing employment areas are safeguarded: Croxley Business Park (E1), Tolpits Lane (E2), Maple Cross/Maple Lodge (E3) and Kings Langley Employment Area (E4). Two small extensions to Croxley Business Park are allocated as E5 and E6, and Leavesden Park (E7) is allocated as an employment site, protected by an Article 4 Direction that stops offices changing to homes without planning permission.
The human version (we wrote this, not the council)This site allocation covers The Green, Great Houghton in Northampton. Residential development of about 650 dwellings will be supported, subject to criteria. Two years of overwintering bird surveys are needed before submission, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. Design must respect the Great Houghton Conservation Area, with a Heritage Impact Assessment. The main access should be from The Green west of Saucebridge Farm, limiting extra traffic towards Great Houghton village and Bedford Road. Proposals need air quality and noise assessments, an archaeological assessment, and a landscape vision protecting views of the Grade II* listed church.
The human version (we wrote this, not the council)This policy supports the extension of the Martin's Yard employment area in Northampton for employment purposes to meet local demand. The extension is restricted to the area shown in Figure 17. A Transport Assessment must test the existing highway and access. Ecological and green infrastructure enhancements and net biodiversity gains are required, given the site lies in the Brampton Valley Arm, immediately south of the Kingsthorpe Local Nature Reserve. A landscape barrier is needed between the employment area and the residual land. Applications need a flood risk assessment, sustainable drainage and improved water quality.
The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.
The human version (we wrote this, not the council)This policy directs development to areas of lowest flood risk and requires that it does not increase flood risk elsewhere, allowing for climate change over the development's lifetime. Proposals must take a sequential approach to choosing and laying out sites, considering flooding from rivers, surface water, groundwater and sewers, informed by the Strategic Flood Risk Assessment. Flood management must be built in from the earliest design stages, and a site-specific Flood Risk Assessment is required, with hydraulic modelling where existing flood information is inadequate.
The human version (we wrote this, not the council)This section gives the full flood risk policy and its reasoning. On sites at risk, buildings must sit in the safest areas, safe access must be shown, and floor levels must be at least 600mm above the 1% annual probability flood level plus climate change allowance. All development needs a drainage strategy, an undeveloped buffer of at least 8 metres along watercourses, and space for water through green and blue infrastructure. South Warwickshire has a history of flooding from multiple sources, and climate change is expected to make floods more frequent and severe.
The human version (we wrote this, not the council)This policy aims to reduce flood risk from new development. South Warwickshire has a history of flooding from many sources, and climate change is expected to make floods more frequent and severe. Recent canal failures elsewhere have also highlighted a residual risk of flooding from canals, which should be considered in Flood Risk Assessments where relevant. Flood risk should be avoided where possible and managed effectively where development is needed, using nature-based solutions and green and blue infrastructure. Assessments should follow the latest strategic evidence and advice from the Lead Local Flood Authority.
The human version (we wrote this, not the council)This section sets out water efficiency rules for new development. South Warwickshire is classed as an area of serious water stress, so new homes must be designed to use no more than 100 litres of water per person per day. Homes with gardens must have a water butt of at least 200 litres. Non-residential buildings over 1,000 square metres must meet the BREEAM Excellent water standard and assess options for reusing rainwater or greywater. Extensions, changes of use and farm irrigation reservoirs are also covered.
The human version (we wrote this, not the council)This policy requires developers to show that enough water supply and sewerage capacity exists, or will be provided, before new development is occupied. Applicants must consult the water company, keep surface water and foul drainage separate, and avoid harming water quality in rivers or groundwater. Major schemes need an Outline Foul Drainage Strategy showing connections, upgrades and phasing. Development near sewage works must assess odour, noise and similar impacts. New or upgraded water infrastructure will be supported where its impacts are acceptable.
The human version (we wrote this, not the council)This section explains how the water and wastewater policy will work in practice. Severn Trent Water is the water and sewerage company for South Warwickshire, and developers are urged to engage with it early because a right to connect does not guarantee that capacity exists. Any needed upgrades will be secured through planning conditions or legal agreements. Connecting surface water to foul sewers is unacceptable unless approved and no other viable option exists. A possible law change would remove the automatic right to connect surface water to public sewers.
The human version (we wrote this, not the council)This policy says major developments must use an Urban Greening Factor (UGF) to show a measurable increase in greening within the red line boundary, using the surface cover types and scores in Appendix 8. The target score is 0.4 for residential and 0.3 for commercial developments. If a scheme falls short, the developer must explain why and should secure offsite greening nearby through planning conditions or obligations. The score is found by multiplying the area of each surface type by its factor score, adding these together and dividing by the total site area. Calculations should be shown on a colour coded drawing with a table.
The human version (we wrote this, not the council)This policy requires high-quality sustainable drainage systems, known as SuDS, across whole development sites to manage rainwater and cut flood risk. A drainage strategy must show that runoff is handled close to where it falls, that properties would not flood in a storm with a 1% chance of occurring in any year, allowing for climate change, and that flood risk is not increased on site or elsewhere. Blue-green corridors should be kept and improved, and brownfield sites should disconnect from combined sewers wherever feasible.
The human version (we wrote this, not the council)This section adds detail on how sustainable drainage systems should be designed. SuDS must be planned as an integral part of the site layout, favouring above-ground and dispersed features rather than reliance on one large storage feature. They should deliver several benefits at once: reducing flood risk, cleaning water through a four-stage treatment train, boosting wildlife, providing attractive amenity space and helping to cool urban areas. Drainage features should also become part of the wider ecological network.
The human version (we wrote this, not the council)This policy protects Southend Foreshore. Development should maintain and improve designated habitats of international, European and national importance, and harmful schemes will be refused unless Habitats Regulations tests are met. Proposals should be resilient to flood risk and coastal change, must not harm the openness of the Thames Estuary or views across it, and should not restrict work on flood defences. Coastal resort schemes are supported if they keep beach space and public access, and beach huts can only be replaced like for like. Valued seafront buildings are protected under the Seafront Character Zones. Qualifying developments will contribute to RAMS, and schemes of 500 dwellings or more may need SANG.
The human version (we wrote this, not the council)This allocation covers around 92.8 hectares at South Aylesbury for approximately 1,350 homes and 5 Gypsy and Traveller pitches, made up of five land parcels planned together. It requires a 2FE primary school, a local centre, a community building with a possible police touchdown facility, and 50% green infrastructure. Land is safeguarded for the Aylesbury Southeast Link Road, now under construction, with financial contributions towards it. Detailed flood modelling is required, including measures to help protect Stoke Mandeville Hospital from surface water flooding.
The human version (we wrote this, not the council)This section explains the green and blue infrastructure policy and sets measurable standards. Major developments must provide a green and blue infrastructure strategy. Commercial schemes must achieve an Urban Greening Factor score of at least 0.3 and residential schemes at least 0.4. Tree canopy must cover at least 14% of commercial sites and 20% of residential sites, or improve on existing cover if that is greater. These networks support wildlife, manage flood risk, store carbon and provide accessible space for recreation.
The human version (we wrote this, not the council)This allocation covers a 113-hectare site at south-west Aylesbury for 1,400 homes and 5 Gypsy and Traveller pitches, with a 2FE primary school, on-site health and community facilities, a linear park and sports pitches. It requires a Southwest Link Road connecting the Stoke Mandeville relief road to the A418 Oxford Road, plus strategic flood defences and drainage. Outline permission was granted in May 2026, with construction expected from 2028, delivering fifty homes initially then 140 per year. A buffer is needed against noise from HS2.
The human version (we wrote this, not the council)This allocation covers three parcels totalling around 242.6 hectares north of the A41 at Aylesbury, including Aylesbury Woodlands. It provides approximately 1,700 homes plus sixty extra care units, around 102,800 sqm of employment floorspace including the Aylesbury Woodlands Enterprise Zone, a 4,000 sqm local centre, a two-form entry primary school, a 6,000 sqm hotel and conference facility and a 16-hectare sports village. Primary access must come from the Eastern Link Road, at least 50% of the site must be green infrastructure, and employment land is safeguarded from other uses.
The human version (we wrote this, not the council)This allocation covers around 225.5 hectares south of the A41 at Aylesbury, mainly Hampden Fields, for approximately 3,000 homes plus a sixty-bed care home or extra care facility. It includes about 6.90 hectares of employment land, two primary schools with pre-schools, a local centre, a health facility and 108.34 hectares of green infrastructure. A dualled Southern Link Road between the A413 and A41 is required, along with town-wide flood defences. Outline permission has been granted and work has started, with careful phasing needed across the merged sites.
The human version (we wrote this, not the council)This section introduces the chapter on climate change, sustainable design and environmental protection. It says climate change has caused widespread harm, with numerous risks beyond 2045. Key issues include flooding from heavy rain and rising sea levels, the upkeep of coastal defences, and poorer water quality after extreme rain. A growing population adds demand for water in an area of high water stress. Rising temperatures will increase heat stress, especially for older people and low-income households. Homes, other buildings and private transport are the main sources of carbon emissions. Space for large scale wind or solar power is limited, and vehicles affect air quality in two air quality management areas.
The human version (we wrote this, not the council)This policy says new buildings and spaces must make Southend more resilient to climate change. To cut carbon, development must follow a hierarchy: be lean by using less energy, be clean by supplying energy efficiently, be green by producing and storing renewable energy on site, and be seen by reporting on energy performance. It should support walkable neighbourhoods and reuse materials. To adapt, the Council will manage flood risk across the whole catchment, keep sea defences adequate and safeguard land to raise them. It will also save water and tackle heat stress. Minerals such as brickearth and agricultural land will be safeguarded, and pollution harmful to health avoided.
The human version (we wrote this, not the council)This allocation describes Kingsbrook, a 306.6-hectare urban extension east of Aylesbury delivering 2,460 homes, 10 hectares of employment land, two primary schools, land for a secondary school, a neighbourhood centre and a major wetland park. Outline permission was granted in 2013 and the site is built as three villages. As of March 2025, 1,922 homes were complete with 538 remaining, and the Eastern Link Road and Stocklake Link have been finished. The whole development is expected to be complete by 2028.
The human version (we wrote this, not the council)This allocation covers around seventy-nine hectares north of Martin Dalby Way on the edge of Aylesbury for an assumed 3,150 homes. It requires a local centre, a 3FE primary school, a community hall, healthcare provision and at least 50% multi-functional green infrastructure, plus a new linear park active travel route. Development must protect the Quarrendon Scheduled Monument immediately to the south, including its grazing regime, and be landscape-led given the site's open, elevated position. Flood modelling of Hardwick Brook and Weedon Ditch is required.
The human version (we wrote this, not the council)This policy sets out how people and the environment will be protected from pollution. Building on or near contaminated land needs a Contaminated Land Assessment and suitable clean up secured by planning condition. Near the cliff frontages, schemes must show they can be built and used safely without making the land less stable. New development should not break legal air quality limits, and major schemes need an Air Quality Assessment. Schemes that harm water quality will be refused unless mitigated. New homes near existing noise must follow the 'agent-of-change' principle and must not threaten valued uses such as pubs and music venues. Major schemes need a Noise Impact Assessment.
The human version (we wrote this, not the council)This policy says all development should avoid areas at risk of flooding and give evidence for the Sequential Test. Schemes must use Sustainable Drainage Systems (SuDS) so peak flows after development are no higher than before, using nature-based solutions where possible. Surface water must never go into a separate foul sewer, and infiltration SuDS are only allowed where they pose no risk to water. Sites at risk of flooding need a Flood Risk Assessment covering all sources, with more vulnerable uses placed where risk is lowest, safe escape routes, and habitable floors above the design flood level. Coastal schemes must allow flood defences to be maintained and raised.
The human version (we wrote this, not the council)This allocation supports redeveloping the Easton Street multi-storey car park in High Wycombe for an assumed 160 homes with around 660 square metres of shops or other commercial uses at ground level. The 0.33 hectare site is next to the railway station, so a high-density scheme with fewer parking spaces is expected. The existing parking has been shown to be surplus and does not need replacing. Flood risk is a major constraint, so bedrooms and living spaces should be on the first floor or above.