The human version (we wrote this, not the council)This policy sets a windfall allowance. Windfall sites are sites that were not identified in the plan but come forward later. The policy provides for 1360 dwellings over the plan period, equal to 60 dwellings per annum between monitoring years 2028 and 2045. The supporting text also explains affordable housing. It cites a need for 133 affordable homes a year, with 98% in social or affordable rented tenures. Sites are expected to provide 20, 30 or 40% affordable housing, with local priority for people from the ward, then adjacent wards, then the Borough. Sites are treated as a whole, not piecemeal.
Infrastructure & utilities
The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.
393 sections of the plan, in document order.
The human version (we wrote this, not the council)This policy aims to meet the identified accommodation needs of Gypsies, Travellers and Travelling Showpeople. Provision will come from existing authorised supply, intensifying and expanding existing sites and yards, allocations on the Policies Map and suitable windfall sites. New pitches, plots or expansions will be supported where they meet a list of criteria. These include no significant harm to local character, no unacceptable harm to amenity, safe access, adequate utilities and drainage, reasonable access to services, acceptable flood risk and compliance with Green Belt policy. Travelling Showpeople yards need space to store, maintain and test equipment. Intensifying existing sites for extended families and varying caravan conditions will be considered positively.
The human version (we wrote this, not the council)This section sets out Objective 6, on infrastructure. It aims to provide the right infrastructure in the right place at the right time, including transport, schools, healthcare, utilities and green spaces. Evidence shows some services, such as healthcare and special educational needs provision, are already stretched. Of 73 wastewater treatment works serving the county, 41 are likely to be close to or over their permits by 2045. A Settlement Review places settlements into five tiers, with Aylesbury and High Wycombe in the top tier.
The human version (we wrote this, not the council)This policy sets the spatial strategy for development to 2050. It prioritises previously developed urban land, concentrates greenfield growth into larger strategic areas so infrastructure can be delivered, favours locations near existing facilities based on 20-minute neighbourhood principles, requires efficient densities and promotes walking, cycling and public transport. It names two new communities, at Hatton and Long Marston Airfield, plus Strategic Growth Locations including Bidford-on-Avon, Bishop's Tachbrook, Henley-in-Arden, Kenilworth, three sites around Leamington Spa and land south of Coventry.
The human version (we wrote this, not the council)This section introduces the chapter on healthy lifestyles and wellbeing. Southend faces public health challenges and an ageing population. Life expectancy is around 10 years lower in the most disadvantaged areas than in the least disadvantaged. Healthy life expectancy is estimated at 61.3 years for males and 61.4 years for females. Nearly 1 in 4 adults are physically inactive, and around 26% of 4-5 year olds and 36% of 10-11 year olds are overweight or living with obesity. The section explains how planning can help, for example through safe play spaces, active travel networks, flexible homes and avoiding pollution and flood risk.
The human version (we wrote this, not the council)This policy requires new homes to deliver a balanced mix of sizes, types and tenures based on set percentages in the plan, with any variation needing clear evidence. Schemes of 100 or more homes must include a housing diversity strategy. All new dwellings must meet accessible and adaptable standard M4(2), and on sites of 10 or more homes a share must be built to wheelchair standard M4(3): 5% of market and 10% of affordable homes. Sites of 200 or more dwellings should provide 2% as self-build plots, and houses in multiple occupation must not harm local character.
The human version (we wrote this, not the council)This policy encourages developers to provide self and custom build housing on residential sites of 300 units or more. The plots should be offered for sale for 12 months to people on Solihull's Self and Custom Build Housing Register. They should have outline planning permission, be fully serviced to the boundary and have unconstrained access to the highway. A Registered Surveyor will value the plots independently. After 12 months, the plots go back to the developer and are built as market housing. The supporting text explains the 'Right to Build' from the Housing and Planning Act 2016, and how the Register is split into two parts.
The human version (we wrote this, not the council)This policy covers housing for older and disabled people. New housing should offer a mix of sizes and types to meet their needs. All new homes on major sites must meet Category M4(2) accessible and adaptable standards, unless built to M4(3). At least 5% of homes on major developments must be wheelchair user dwellings to M4(3). Developments of 300 dwellings or more must provide specialist housing or care bedspaces, though this will be applied flexibly. Specialist housing and care homes (Use Class C2) will be supported where they are close to shops, amenities, public transport and health care. Care homes must also meet Care Quality Commission standards.
The human version (we wrote this, not the council)This policy sets out how Gypsy and Traveller sites will be provided. New sites should be inside, next to or within safe walking distance of a development boundary outside the Green Belt. They are assessed on access to services, flood risk, utilities and landscape impact. No site may exceed 10 pitches, and each pitch is limited to 25m by 25m. Sites need a management plan. The council will work with neighbouring Warwickshire authorities on a stopping protocol for unauthorised encampments. Existing authorised sites listed in Appendix E are safeguarded and will be refused for other uses unless replaced or no longer needed.
The human version (we wrote this, not the council)This section sets out the proposed policy on town, district and local centres. The council proposes to keep a hierarchy: Fleet as the principal town centre, Blackwater, Hook and Yateley as district centres, and Hartley Wintney and Odiham as local centres. It would set centre boundaries and primary shopping areas and strengthen Fleet's role. The retail study found limited need for more retail floorspace and recommends a local impact threshold of 350 sqm gross floorspace for retail and leisure outside centres. Boundary maps are in Appendix 3. Question 12 asks for additional important issues.
The human version (we wrote this, not the council)This section sets out Objective 8, on transport and digital connectivity. It aims to improve connections across and beyond the county through new sustainable transport infrastructure, safe walking and cycling routes, better public transport and improved digital coverage. Modelling shows planned growth will significantly increase traffic, especially around Aylesbury and High Wycombe. East West Rail will improve links in the north, while HS2 passes through without stopping. Many rural residents rely on cars, so the location of development is critical.
The human version (we wrote this, not the council)This policy supports new residential moorings and the conversion of leisure moorings to residential use. Moorings need access to toilet and waste disposal, electric and water hook-ups, and individual access and parking. They must not block the towpath or navigation, harm leisure provision, air quality, nature, historic environment or biodiversity, or harm the character of the waterway or neighbours' amenity. Any berths or marina must be in scale with the nearest settlement in the hierarchy. The supporting text also explains the Borough-wide Article 4 Direction on houses in multiple occupation, which now requires planning permission for them.
The human version (we wrote this, not the council)This policy sets the preferred mix of market homes on allocated sites, broad locations and major windfall sites. The Council will seek 45% with 1 or 2 bedrooms, 40% with 3 bedrooms and 15% with 4 or more bedrooms. It will take into account site size, local need and demand, access to services and public transport, viability and the need for mixed communities. The mix is based on the 2026 HEDNA. Town centre sites may deliver a different mix. The HEDNA also shows a need for bungalows, mainly with 2 bedrooms. Any bedroom should meet national space standards.
The human version (we wrote this, not the council)This section sets out the proposed infrastructure and community facilities policy. It would set out the type, extent and broad location of infrastructure needed, from transport, utilities and healthcare to education and community facilities such as pubs and local shops. The council proposes an infrastructure-led approach, with on-site and off-site provision through developer contributions, and allocation or safeguarding of sites where needed. It notes that people aged 75 and over are projected to increase by 27.1% by 2039. Many evidence studies are still in development. Question 13 asks for additional important issues.
The human version (we wrote this, not the council)This section explains the presumption in favour of sustainable development. National law and the National Planning Policy Framework require plans to apply this presumption, meaning the Council will look to approve proposals that accord with the development plan and contribute to economic, social and environmental objectives. Adverse impacts should be avoided, mitigated or outweighed by benefits. Whether development is sustainable is judged against the Plan as a whole, including the detailed development management policies in Chapter 7.
The human version (we wrote this, not the council)This section introduces the employment chapter. The council wants to work with the private sector to create lasting local jobs while protecting rural character. Hams Hall and Birch Coppice are the two largest logistics sites, both with rail freight terminals. The economy is described as fragile because it depends on a narrow range of sectors and large employers. Horiba MIRA Technology Park and UK Central are expected to bring higher skilled jobs. The section also covers skills, out-commuting, high-speed broadband, and protecting employment land. A change of use needs evidence of at least 12 months of marketing.
The human version (we wrote this, not the council)This policy sets the hierarchy of centres. Caterham and Oxted are Town Centres. Caterham-on-the-Hill, Lingfield, Warlingham and Whyteleafe are Local Centres. Development in centres is supported where it fits their role and keeps them lively and viable, for example by adding shops, leisure and food and drink uses or reusing vacant space. Homes in centres are supported, but in primary shopping areas they should be on upper floors or avoid losing active ground-floor frontages. Main town centre uses outside centres must pass the sequential approach. Retail and leisure schemes above 500 sqm gross floorspace outside town centres need an impact assessment. Loss of local shops and services needs justification.
The human version (we wrote this, not the council)This policy requires all development, including change of use, to show how it has considered creating zero carbon development using an energy hierarchy. First, reduce energy demand with a fabric-first approach. Second, use energy efficient technology. Third, maximise renewable energy generation, including solar PV and heat pumps. Applications need a Sustainability Statement that includes an Energy Use Intensity figure. It should show how the proposal achieves space heating demand under 30kWh/m2/annum and total operational energy use under 40 kWh/m2/annum. Any requirement not met must be clearly justified.
The human version (we wrote this, not the council)This section introduces the infrastructure and transport policies INF1 and INF2. It says development must be coordinated with timely infrastructure, as capacity varies across the district. Infrastructure covers transport, education, healthcare, water, wastewater, flood and drainage, energy, digital links and community facilities. The Infrastructure Delivery Plan (IDP) is the main evidence and will be kept up to date. Funding can come from developer contributions, the Community Infrastructure Levy (CIL), public investment and other sources, but funding strategic infrastructure remains challenging. Contributions should only address a development's own impacts. Cumulative impacts matter, and some development may need phasing. Land for future infrastructure should be safeguarded.
The human version (we wrote this, not the council)This policy supports development only where the infrastructure needed to serve it and mitigate its impacts, alone and together with other schemes, can be delivered on time. Developers must show there is enough capacity or that extra infrastructure will come at the right time. They must fund or contribute to new infrastructure and provide land where needed. Provision will take account of the Infrastructure Delivery Plan, the needs of service providers, site allocation policies and cumulative impacts, and may be phased. Development must safeguard land and routes needed for planned infrastructure. Schemes that would prejudice such infrastructure will not be supported unless suitable alternative provision is secured.
The human version (we wrote this, not the council)This policy, Policy DM4.1, supports a network of community facilities to help create healthy and complete neighbourhoods. New or improved facilities should be well designed, safe, inclusive and accessible to all. Existing facilities such as community centres, libraries, pubs, places of worship, health facilities, schools and theatres are protected. Their loss is only accepted if the community no longer needs them and alternatives exist, or if the use is no longer financially viable. This must include at least a 1-year active marketing exercise. New homes near such facilities must follow the agent of change principle. The policy also supports more space for burials and cremations, including green burials.
The human version (we wrote this, not the council)This policy sets the housing strategy. It provides for 91,287 new homes between 2024 and 2045, with a stepped requirement of 2,150 homes a year to 2029/30 and 5,222 a year from 2030/31. Growth is prioritised on brownfield land, where 107 allocations will provide 7,599 homes, and at 10 new and expanded settlements (NESS sites) including Aylesbury North, Winslow and Cheddington, each planned for up to 3,650 homes. Further greenfield sites are allocated according to a settlement hierarchy, with no allocations in the Green Belt.
The human version (we wrote this, not the council)This section sets out the proposed transport and accessibility policy. The council proposes to promote sustainable travel, with an active travel first approach, and to identify transport schemes, priorities and improvements. It would set local parking standards for residential and non-residential development, which could vary by location. It would also set local thresholds for what counts as a significant amount of movement from new development and identify cross-boundary strategic transport needs, with allocation or safeguarding if required. Stations at Fleet, Winchfield, Hook and Blackwater are noted, and smaller villages rely largely on cars. Question 14 asks for additional important issues.
The human version (we wrote this, not the council)This policy sets out the Council's approach to renewable and low carbon energy. The Council will take a positive approach and encourages renewable energy on existing and proposed buildings as well as ground-mounted schemes. Large-scale renewable energy proposals will be supported where, with mitigation, they do not harm listed matters. These include the character of settlements, heritage assets, biodiversity, sports pitches, landscape, residential amenity, public rights of way and safeguarded Ministry of Defence sites. Applicants should give the expected lifetime of the scheme and say how it will be decommissioned.
The human version (we wrote this, not the council)This policy requires development to provide or connect to safe, inclusive and sustainable movement networks. Design should follow a hierarchy: walking and wheeling first, then cycling, then public and shared transport, and private motor vehicles last. Public Rights of Way and bridleways should not be the main access if they are not up to standard. The Council will judge access by the most direct and realistic routes. Being near a railway station is not enough on its own. Schemes must assess transport impacts through a Transport Assessment or Transport Statement and provide mitigation. They must provide parking, servicing and electric vehicle infrastructure, and must not rely on uncommitted infrastructure.
The human version (we wrote this, not the council)This policy seeks at least 40% affordable housing on all development creating one or more extra homes, split 70% for rent and 30% for affordable home ownership. Major schemes in the Green Belt (10 or more homes, or 0.5 hectares or more) must provide at least 50%. Small sites of one to nine homes may pay a financial contribution instead. Affordable homes must look the same as market homes and be spread across a site. Most types are allocated to people with a local connection, and First Homes carry a permanent discount of at least 30%.
The human version (we wrote this, not the council)This policy requires development to follow a design-led approach, drawing on the National Design Guide, to create high-quality, inclusive, safe, healthy and sustainable neighbourhoods. Proposals must show an understanding of the site and respond to local distinctiveness, covering matters such as natural features, the form and height of nearby development, views, townscape and heritage assets. They must put people at the centre, support health and wellbeing, and provide welcoming, safe and accessible buildings and spaces. Places must also be well integrated with their surroundings, and compatible with nearby land uses.
The human version (we wrote this, not the council)This section introduces the water management policies WAT1 to WAT4. It says growth should be resilient to flood risk and climate change and should not overload water resources, drainage or wastewater networks. Development should follow the sequential approach to flood risk, use sustainable drainage and cut demand for potable water. The Plan draws on Level 1 and Level 2 Strategic Flood Risk Assessments and a Water Cycle Study, with any mitigation set out in the Infrastructure Delivery Plan. Applicants should talk to water companies early. The Council will work with the Environment Agency, SES Water, Southern Water, Thames Water and others.
The human version (we wrote this, not the council)This policy, Policy DM4.2, supports new and improved sport and recreation facilities in line with local assessments of need. Planning obligations will be sought where new development creates or adds to local shortages. New or replacement facilities should be safe and inclusive, including changing rooms, and reachable by walking, cycling and public transport. Community Use Agreements will be needed to secure wider community use. Loss of outdoor sports facilities, children's play space or other sports land is only allowed if there is a surplus. The other option is equal or better replacement facilities in accessible places. New investment should follow the Built Facilities Strategy and Playing Pitch Strategy.
The human version (we wrote this, not the council)This policy requires an integrated approach to water management. Development must show that flood risk, surface water drainage, water supply, wastewater capacity, water quality and the natural water environment have been considered from the start of design. The individual and cumulative effects on the water environment must be assessed. The infrastructure needed for water supply, wastewater, drainage and flood risk must be deliverable at the right stage, and applicants should talk to water companies early. In catchments sensitive to the cumulative effects of development, proposals must not increase flood risk or harm the ecological condition of rivers, and should help improve catchment resilience where appropriate.