Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Infrastructure & utilities

The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.

393 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy requires an integrated approach to water management. Development must show that flood risk, surface water drainage, water supply, wastewater capacity, water quality and the natural water environment have been considered from the start of design. The individual and cumulative effects on the water environment must be assessed. The infrastructure needed for water supply, wastewater, drainage and flood risk must be deliverable at the right stage, and applicants should talk to water companies early. In catchments sensitive to the cumulative effects of development, proposals must not increase flood risk or harm the ecological condition of rivers, and should help improve catchment resilience where appropriate.

The human version (we wrote this, not the council)This policy requires development to include Sustainable Drainage Systems (SuDS) unless they are shown to be inappropriate. Surface water should be managed as close to its source as practical and discharged following the drainage hierarchy. Drainage must not increase flood risk on or off the site, must achieve suitable runoff rates, allow for climate change, handle exceedance flows safely and have long-term maintenance arrangements. Above-ground and nature-based solutions should come first. Major and phased schemes need a coordinated drainage strategy for the whole site. In Groundwater Source Protection Zones, infiltration is only supported where there is no unacceptable risk to groundwater quality.

The human version (we wrote this, not the council)This section introduces the economy chapter. It says Solihull has a strong and productive economy and is home to key assets such as Jaguar Land Rover, Birmingham Airport and the National Exhibition Centre. The HS2 rail link and Interchange Station will make the Borough more attractive to business. The Solihull Economic Strategy (2022 to 2032) aims for Solihull to be the 'UK's best-connected economy'. The UK Central Hub area includes these assets and Arden Cross, the land bounded by the A45, A452 and the M42. In 2016 the Council set up the UK Central Urban Growth Company to lead delivery. The plan aims to make the most of this growth.

The human version (we wrote this, not the council)This policy protects and enhances the natural environment. Development affecting it must provide an assessment, including an Appropriate Assessment where significant effects cannot be ruled out. SSSIs get a high degree of protection. Irreplaceable habitats such as ancient woodland and veteran trees will be refused unless the benefits clearly outweigh the loss. All applicable developments must deliver a minimum 10% Biodiversity Net Gain, on site first, then within the Borough, a neighbouring authority, Warwickshire, other areas, and finally national credits. Ancient woodland and veteran trees need a minimum 15m buffer zone. The supporting text explains tranquillity and the Daw Mill appeal.

Policy SP5

Homes

pp. 57–67

The human version (we wrote this, not the council)This policy, Strategic Policy SP5, plans for 14,700 net dwellings to 2045. These are split between Southend Central Neighbourhood (3,600), Land North of Southend (4,900), Fossetts Farm (1,350), other neighbourhoods (1,850) and windfall (3,000). Delivery is stepped: 365 dwellings a year in 2025-2030, 655 in 2030-2035 and 960 in 2035-2045. Homes will come from existing permissions, site allocations, opportunity sites and windfall. Affordable housing is required on all sites of 10 or more dwellings, and the loss of homes will be resisted. No need for gypsy or traveller pitches is identified, but criteria are set for any future application.

The human version (we wrote this, not the council)This policy requires development to minimise demand for potable water and use water efficiently. New homes must use no more than 110 litres per person per day, or any replacement national standard. Measures such as rainwater harvesting and greywater recycling are encouraged where suitable. Development must protect the quality of rivers and groundwater, including Groundwater Source Protection Zones, and prevent pollution. Developers must show there is enough water supply, sewerage and wastewater treatment capacity, or that it will be delivered before development starts. Schemes must connect to the public foul sewer where reasonably practical and keep foul and surface water separate. Land for water infrastructure must be safeguarded.

The human version (we wrote this, not the council)This policy covers the UK Central Hub Area, which the plan says has the greatest potential for growth in the Borough. The Hub includes Birmingham Airport, the NEC, Birmingham Business Park and Jaguar Land Rover, and the Arden Cross site around the HS2 Interchange Station. Proposals must show how they support inclusive growth and the key assets, and improve connections and travel other than by car. They must not hold back development elsewhere in the Hub. They should provide green and blue infrastructure, good design, local jobs and low carbon energy. The Hub Framework Plan (2018) estimated up to 77,500 jobs and up to 4,000 new homes up to 2047.

The human version (we wrote this, not the council)This policy identifies a Central Tranquility Area to protect rural character and tranquillity from inappropriate urbanising development. Until the area is defined, the CPRE Tranquil Areas Map is the basis for assessing the effects of development on tranquillity, especially noise and light pollution. Development will not be permitted where it harms tranquillity. Decisions consider visual and aural impacts and effects on users of public rights of way. The supporting text also introduces green infrastructure, covering the canals, the sub-regional strategy, biodiversity offsetting pilot, quarry sites at Purley, Jubilee and Oldbury, and HS2 opportunities.

The human version (we wrote this, not the council)This section sets out the proposed flood risk and sustainable drainage policy. The council proposes to identify the areas in Hart most at risk from, or contributing most to, flooding, particularly surface water flooding and risks from reservoirs and canal embankments. The aim is to support water management in upper sub-catchments. The policy would set local requirements proportionate to the scale of development, make sure development does not compromise flood management infrastructure, and allocate or safeguard land for local flood alleviation schemes where required. National policy already covers detailed assessment of applications. Question 17 asks for additional important issues.

The human version (we wrote this, not the council)This policy addresses accommodation for Gypsies, Travellers and Travelling Showpeople. The council's 2025 assessment identifies a need for 37 pitches for Gypsies and Travellers and 6 plots for Travelling Showpeople who meet the national planning definition, plus further need from households whose status is undetermined. Applications will be judged against criteria covering flood risk, impact on wildlife, heritage, landscape and Green Belt openness, access to services and the road network, site design and servicing, and the scale of the site relative to the settled community. Existing sites are safeguarded while a need remains.

The human version (we wrote this, not the council)This section contains the full Policy DS.4 and its justification. Every New Settlement and Strategic Growth Location must agree a masterplan with the council before any planning application, deliver roads, schools, healthcare and utilities early with clear trigger points, and secure developer contributions through legal agreements. Sites must create walkable 20-minute neighbourhoods, provide affordable housing and deliver Gypsy and Traveller pitches before a set share of market homes are occupied. New settlements will deliver at least 4,000 homes, and delivery will be overseen by boards, site delivery officers and community champions, with long-term stewardship of community assets.

The human version (we wrote this, not the council)This policy requires development to contribute, where appropriate, to a strategically planned Green Infrastructure network. Proposals should identify, maintain and enhance existing assets, create links to surrounding networks and help deliver new assets, having regard to Natural England's standards. Where an asset is lost and cannot be replaced on site, contributions will be sought towards wider projects. The text that follows introduces the Tame Valley Wetlands Nature Improvement Area, designated in 2016, which includes 5 SSSIs, 12 Local Nature Reserves and 48 Local Wildlife Sites.

The human version (we wrote this, not the council)This policy supports the Tame Valley Wetlands Nature Improvement Area, including Kingsbury Water Park. The council will encourage bigger, better and more joined up habitats, safe public access, natural flood management and the restoration of watercourses. Where habitat loss cannot be made up locally, the area may receive habitat mitigation and offsetting projects. Replacement buildings needed because of HS2 will be allowed elsewhere within Kingsbury Water Park. The text that follows introduces the River Anker Access and Nature project in Atherstone, which aims to improve public access to the river and its meadows.

The human version (we wrote this, not the council)This section explains the purpose of the strategy for economic growth. It aims to support a resilient, sustainable and competitive economy by ensuring enough land is available in the right locations to meet employment needs. It seeks to grow high-value, high-productivity sectors by identifying and protecting well-connected strategic employment sites, in line with the Buckinghamshire Economic Growth Plan, and to support the regeneration of town centres as economic hubs.

The human version (we wrote this, not the council)This policy sets the strategy for economic growth. The Plan must allocate at least 219 hectares of employment land to 2045, and after committed sites are counted, about 147 hectares of additional land is allocated. Major locations include expansion at Westcott Venture Park and new employment land at the Winslow, Buckingham and Turweston new settlements, plus town centre sites in Aylesbury and High Wycombe. Research and development floorspace is strongly supported, and no new employment development is allowed in the highest flood risk zone (Flood Zone 3b).

The human version (we wrote this, not the council)This policy supports a broad range of development at the NEC to improve the visitor offer and its international competitiveness. This includes new or refurbished exhibition halls and transport facilities, and ancillary uses such as hotels, offices, warehouses, catering and leisure, if justified in scale and well located. Employment led development, including industrial and logistics uses, is supported, as is new housing on the campus in principle. Any loss of car parking needs a parking review. The supporting text says the NEC opened in 1976, attracts more than 7million visitors a year and generates £2billion a year in wider economic impact. Plans include an Industrial and Logistics Hub.

The human version (we wrote this, not the council)This section sets out the proposed policy on the Thames Basin Heaths Special Protection Area, which covers more than 8,000 hectares across Surrey, Berkshire and Hampshire. The policy would set out the established approach to protecting it. That means an exclusion zone within 400m, a zone of influence from 400m to 5km needing mitigation, and case-by-case treatment of developments of 50 or more homes between 5km and 7km. Mitigation takes the form of SANG and a payment to the SAMM project. Developments of 10 or more homes needing mitigation must be within a SANG catchment. Question 19 asks for additional important issues.

The human version (we wrote this, not the council)This policy supports the continued sustainable growth of Birmingham Airport as part of national aviation infrastructure and the main international gateway to the region. It supports operational development such as terminals, passenger and freight facilities, airfield works and surface access, to make the most of the extended runway. Ancillary uses such as hotels, offices and car parks are also supported if justified in scale and well located. Airport related uses beyond the boundary will be permitted where justified and where they meet other policies, including Green Belt policy, for example on site UK2. The 2018 Airport Master Plan forecast growth from 13m passengers a year in 2018 to 18m in 2033.

The human version (we wrote this, not the council)This policy supports Jaguar Land Rover (JLR) to compete and succeed in the global vehicles industry. The Council will support a broad range of development within the JLR boundary set in this plan, so it can keep or improve its role as a major vehicle maker. Site UK2 is being released from the Green Belt to meet the Borough's employment needs. This includes the needs of JLR and its component suppliers, which need a location close to the plant. The supporting text says JLR is limited in its ability to expand because it sits within the main urban area. The land at Damson Parkway will also provide local jobs.

The human version (we wrote this, not the council)This policy supports development at Birmingham Business Park within its boundary, as a prime, high quality managed employment location. Offices, light industrial, general industrial and warehousing uses are supported. Development should be well planned, keep the park attractive to investors and protect the environment. Ancillary uses such as hotels and business services are supported if their scale does not compete with facilities outside the park. The supporting text notes a 9ha allocation added in the SLP (2013). A green buffer next to homes on Coleshill Road and Blackfirs Lane will be managed and enhanced, helping a new bus link from Blackfirs Lane.

The human version (we wrote this, not the council)This policy says development must protect and, where suitable, improve the district's green and blue infrastructure, such as trees, hedgerows, watercourses, ponds and green spaces. It should avoid needless loss or breaks in the network, and unavoidable loss must be replaced or mitigated. Development on land not previously developed must provide green or blue infrastructure on site. Development on previously developed land must make the most of chances for urban greening. Features should serve several purposes where possible. Existing trees, hedgerows and water features must be kept, or applicants must explain why not. Management and maintenance must be shown for at least 25 years.

The human version (we wrote this, not the council)This section sets out the proposed sustainable water use policy. Hart is in a water-stressed area, and the council describes known water supply and wastewater issues. In the west, over-abstraction at Greywell and Itchel affects habitats including Greywell Fen SSSI. South East Water proposes the Western Relief Scheme, not expected until at least 2030. Water quality problems in the River Blackwater and Fleet Brook are linked to the Fleet and Camberley sewage treatment works. The council proposes to identify water infrastructure needs and limits on development, consider phasing, set water efficiency standards, and allocate or safeguard land if needed. Question 20 asks for additional important issues.

The human version (we wrote this, not the council)This policy, Policy DM5.1, sets how much affordable housing new schemes must provide. Schemes of 10 dwellings or more must provide at least 30% affordable or key worker homes. The rate is 10% for brownfield flatted development in Value Area 1, which covers Westcliff, Prittlewell, Southend Central, Southchurch, Fossetts and part of Shoeburyness. Build to Rent schemes must provide at least 20%. Provision should normally be on-site. The Council will seek 80% as affordable housing for rent, with the rest as affordable home ownership. As a guide, this means 40% social rent, 40% affordable rent and 20% other ownership products.

The human version (we wrote this, not the council)This section introduces the services and facilities chapter. The plan will protect and support local services and facilities across the Borough, including social, health and cultural infrastructure. Retail uses will be focused on the Market Towns and protected in line with the settlement hierarchy. The section notes concerns about poor health, obesity and gambling, and says local policies may restrict the number of takeaways or betting shops where there is a local problem. New and improved community facilities outside town and neighbourhood centres will be supported if they are accessible to all.

The human version (we wrote this, not the council)This policy protects open spaces and recreational areas. Loss of open space, sports and recreation land, including playing fields, is not permitted unless it is replaced by equal or better provision, shown to be surplus, unsuitable to meet another deficiency, or replaced by alternative sports provision that meets an identified need. New development should provide on-site open space and recreation that is accessible to all. Proper maintenance must be agreed through a management agreement. Where on-site provision is not feasible, off-site contributions may be required.

The human version (we wrote this, not the council)This policy requires development to make effective use of land by optimising site capacity through the design-led approach. The optimum capacity is the amount of development that can be provided while keeping high design quality, responding to context and limiting harm. Proposals must show that density, scale, form, layout and mix of uses suit factors such as character, heritage, access to transport and services, infrastructure capacity, amenity and climate resilience. Higher density is supported in sustainable, well-connected places. Larger sites must support comprehensive development, and supporting information is needed to show how capacity was set.

The human version (we wrote this, not the council)This policy, Policy DM5.2, promotes a wide choice of homes to create mixed, balanced and inclusive communities, including family housing. Proposals for 10 or more dwellings must provide a mix of home sizes and types. This should have regard to the latest Housing Needs Assessment, as set out in Policy Table DM5.2. Where a proposal moves well away from this mix, the reasons must be justified. High density flatted schemes in highly accessible places may include more smaller units, but should still include some family sized homes. More suburban areas should provide a larger share of family housing than the preferred mix.

The human version (we wrote this, not the council)This policy allows renewable and low carbon energy schemes, including micro-renewables such as small wind turbines, micro-hydro and solar panels, and decentralised energy like combined heat and power. Support depends on an assessment of impacts on residential and workplace amenity, visual and landscape character, air and water quality, the natural, built and historic environment, biodiversity, public access to the countryside, and the openness of the Green Belt. The council will consider both individual and cumulative impacts of such applications.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport gives access to services, jobs and training, and the plan seeks to improve public transport between the Market Towns, Local Service Centres and villages. It notes the traffic effects of HS2 and the new NEC station, and the benefits and disturbance from Birmingham Airport. A Strategic Transport Assessment is being updated for the plan. Major developments must support public transport improvements, such as services to Birch Coppice and Hams Hall. Level crossings need early talks with Network Rail. The North Warwickshire Area Strategy 2026 sets out long-term transport improvements.

The human version (we wrote this, not the council)This policy requires all new homes to be net zero in operation. Dwellings must achieve at least a 63% improvement on the 2021 Building Regulations target emissions rate through energy efficiency, with fabric improvements from 12% for end terraces to 24% for flats. Meeting absolute targets of 35 kWh per square metre a year total energy, and 15 for space heating, earns positive weight. Fossil fuels and gas connections are ruled out except in exceptional cases, and on-site renewables must match predicted energy use, with offset payments a last resort. Larger schemes report energy data for five years.

← Back to the plan search