Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Infrastructure & utilities

The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.

393 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy, Strategic Policy SP1, sets out the Spatial Principles that all new development must follow where relevant. Development should be served by the infrastructure it needs, using an 'infrastructure led' approach. It should make the best use of previously developed land and minimise the use of greenfield land. The openness of the Green Belt will be protected. The policy supports tourism, culture and economic growth at the City Centre, London Southend Airport and the employment areas. It also asks for good design, sustainable travel, support for existing centres, resilience to climate change, protection of heritage, net gains in biodiversity, and care over unstable land.

The human version (we wrote this, not the council)This policy says that planning applications that accord with the plan's policies count as sustainable development. They will be approved without delay, unless other material considerations indicate otherwise. Where policies are missing or out of date, the presumption in favour of sustainable development applies. All proposals must be in a sustainable location, be supported by the infrastructure listed in the Infrastructure Delivery Plan, and show high quality design. They must also deter crime, protect the historic environment, provide biodiversity and protect rights of way. Infrastructure will be sought where it is necessary and fair, and proposals that go beyond plan requirements to help provide infrastructure or affordable housing carry weight.

The human version (we wrote this, not the council)This policy sets out how the Plan will meet development needs. It provides for a minimum of 9,946 homes under Policy H1. The Council accepts that a residual housing need remains against the standard method. It will address this through further development, by exploring land south of Redhill Aerodrome in a Local Plan review, and through cross-boundary work including the Surrey Strategic Development Strategy. An early review will start no later than the third anniversary of adoption. The Plan provides for 143 Gypsy and Traveller pitches, 69 Travelling Showpeople plots and about 21.4 hectares of employment land. These are minimums, and extra development meeting set criteria will be supported.

The human version (we wrote this, not the council)This policy, Strategic Policy SP2, sets out where growth will go in Southend. The Local Plan provides for 14,700 new homes and 68,400sqm of employment space to 2045. The main focus is Southend Central Area, with 3,600 additional homes, and Land North of Southend, with a new neighbourhood of 4,900 homes. Other growth areas are Fossetts, with around 1,350 new homes, the Seafront, Shoeburyness, London Southend Airport and environs, and Priority Urban Areas such as Leigh, Westcliff and the A13 corridor. Airport jobs will be split 50-50 with Rochford District Council. New development must enhance local character and the sense of place.

The human version (we wrote this, not the council)This section introduces the housing policies H1 to H7. The Plan provides a minimum of 9,946 net additional dwellings between 1 April 2027 and 31 March 2042, through a stepped trajectory. Supply comes from commitments of around 1,612 dwellings, about 2,350 at Redhill Aerodrome from year 6, about 4,124 on new allocations, about 1,300 from the Settlement and Windfall Study and about 560 from rural windfall. Land next to Redhill Aerodrome is removed from the Green Belt but not allocated. The stepped requirement rises from 350 dwellings in 2027/2028 to 600 a year, averaging 470 over five years, then 760 a year from 2032/2033.

The human version (we wrote this, not the council)This section explains the spatial strategy, which steers most development to the Main Towns and then through a cascade to other settlements, with very little in the countryside. Atherstone with Mancetter and Polesworth with Dordon are the Main Towns. Coleshill is also a historic Market Town, but its growth is smaller because Green Belt surrounds it. There are five Local Service Centres. About 60% of the Borough is in the Green Belt. The section also allows development on the edge of the Borough close to Tamworth and Nuneaton. All proposals must be proportionate to the size of the settlement.

The human version (we wrote this, not the council)This section describes the county's economy. Buckinghamshire generates about £19.2 billion in economic output and supports around 285,000 jobs across more than 31,000 businesses, around 98% of them small and medium-sized. Key clusters include high-performance engineering at Silverstone, the Westcott space cluster, life sciences and the film and media cluster at Pinewood. Productivity growth has weakened, and around 12.6% of residents commute to work in London. The Plan aims to support investment, innovation and better local jobs.

The human version (we wrote this, not the council)This section opens the Development Strategy chapter with the plan's vision for 2050. It pictures South Warwickshire as a flourishing, healthy and vibrant place where new settlements thrive alongside existing communities, with homes and jobs in accessible, well-connected locations and a bigger, greener economy driving towards net zero carbon. The vision is backed by strategic objectives, beginning with delivering infrastructure in the right place at the right time and providing homes that meet the needs of all communities, including affordable and specialist housing.

The human version (we wrote this, not the council)This policy sets the housing requirement and sources of supply. The Plan will deliver a minimum of 9,946 net additional dwellings by 31 March 2042. Supply comes from commitments of 1,612 dwellings, a strategic allocation of at least 2,350, housing allocations of at least 4,124, settlement capacity of around 1,300 and rural windfall of around 560. Delivery is stepped: 2,350 homes from 1 April 2027 to 31 March 2032, averaging 470 a year, then an average of 760 a year from 1 April 2032. At least 10% of homes will come from small sites of no more than one hectare. The requirement is a minimum, not a ceiling.

The human version (we wrote this, not the council)This section introduces the strategic policies chapter through the spatial strategy, which directs growth to the edges of the district's larger settlements where services and transport are strongest. It explains that brownfield sites can deliver fewer than 700 new homes, so the plan provides for around 4,200 dwellings on land currently in the Green Belt. The council argues that exceptional circumstances justify changing Green Belt boundaries, citing the scale of housing need, limited brownfield land, acute affordable housing need and the extent of Green Belt cover.

The human version (we wrote this, not the council)This section sets out the spatial strategy in full. Growth is focused on edge-of-settlement sites next to the larger settlements, which the council judges the most sustainable and least harmful option after assessing all reasonable alternatives. A settlement hierarchy directs most growth to the principal town, small towns and large villages, while washed-over Green Belt villages take only 1 to 2% of housing growth. The plan requires significantly higher housing densities, especially near town centres and public transport, to reduce land take, and limits Green Belt release to what is needed with compensatory environmental improvements.

The human version (we wrote this, not the council)This policy sets the overall growth level for the plan. It provides for 468 dwellings a year, at least 7,017 homes over the 15-year plan period, delivered in line with the spatial strategy. This is below the Government's standard method figure of 832 homes a year (12,480 in total), which the council says cannot be met without unacceptable harm to the Green Belt, infrastructure and the rural road network. Employment uses on allocated sites are safeguarded unless their loss is robustly justified, and the council will consider an early review of the plan if more growth could be accommodated sustainably.

The human version (we wrote this, not the council)This section explains sustainable development and the plan's approach of Environmental Net Gain (ENG). Sustainable development means meeting today's needs without compromising future generations. ENG aims to leave the local environment better off than legal biodiversity rules alone require, covering carbon, soils, water, air quality, flood management and green spaces. ENG is an ambition rather than a mandatory requirement, but it is embedded across many policies, marked with a special symbol, and counts as a material consideration when shaping development proposals.

The human version (we wrote this, not the council)This policy embeds the national presumption in favour of sustainable development, meaning the council takes a positive approach and works with applicants to approve proposals wherever possible. All development must address a list of sustainability aims. These include cutting carbon emissions to help reach the council's net zero ambition by 2030 for its own emissions and district-wide net zero by 2045, avoiding flood risk, prioritising brownfield land, providing mixed housing including affordable homes, supporting town and village centres, locating development to reduce travel, delivering infrastructure, good design and managing pollution.

The human version (we wrote this, not the council)This section sets out the full wording and reasoning behind Policy DS.1 on environmental mitigation and compensation. Compensation is only supported where avoidance and mitigation are not achievable and where measures are deliverable, secured and managed long term. Off-site measures should align with local priorities such as the Warwickshire Local Nature Recovery Strategy. The policy extends the national mitigation hierarchy beyond biodiversity to other natural assets and ecosystem services, and it does not override statutory tests on heritage, flood risk or biodiversity.

The human version (we wrote this, not the council)This policy sets affordable housing requirements for developments of six or more dwellings or 1,000m2 of floorspace, unless a site allocation policy says otherwise. Schemes of 6 to 9 dwellings provide 40% offsite through commuted sums. Schemes of 10 or more provide 30% on previously developed land and 50% on greenfield land. The split should be 80% for rent and 20% for ownership, with at least 40% of the rented part as social rent. Major schemes provide them onsite. Lower amounts need a viability assessment, tested by the Council's independent consultant. Small rural exception sites may be allowed, and splitting sites to avoid the rules is not permitted.

The human version (we wrote this, not the council)This section describes transport and infrastructure. Buckinghamshire has strong road and rail links, and major projects such as HS2 and East West Rail, including a new station at Winslow, will shape future connectivity. However, parts of the network are at or near capacity, east-west links are limited and rural public transport is patchy. Transport accounts for about 51% of the county's carbon emissions. Healthcare, education, utilities and digital infrastructure also face pressures, so development needs to be matched by timely infrastructure delivery.

The human version (we wrote this, not the council)This site allocation, Policy DM2b, allocates land north of Southend at Bournes Green, shown as BG001 on the Policies Map. It is for a minimum of 4,900 new homes, including 45% affordable housing and at least 150 self-build or custom-build plots, plus at least 12,500 sqm of employment floorspace. It must provide transport mitigation, new primary and secondary schooling, a purpose built primary care facility, a country park, sports pitches and a Golf Impact Assessment. Development must protect the Essex Coast Habitats Sites, with at least two seasons of wintering bird surveys. The text says exceptional circumstances justify removing this land and Fossetts Farm (HEA264) from the Green Belt.

The human version (we wrote this, not the council)This policy sets the housing mix for developments of five or more dwellings. Its indicative mix for market housing is 10% one bedroom, 25% two bedroom, 35% three bedroom and 30% four or more bedrooms. For social or affordable rent it is 50% one bedroom, 35% two bedroom, 10% three bedroom and 5% four or more. Affordable ownership leans to two bedroom homes, at 45%. Proposals must show how their mix responds to local need, the site, existing housing stock, tenure and viability. Departures without adequate justification will not be supported. All new dwellings must meet the Nationally Described Space Standard unless exceptional site circumstances justify a lower standard.

The human version (we wrote this, not the council)This section covers housing and affordability. Buckinghamshire has about 220,727 households, with around 71% owning their home. Average house prices were around £479,000 in April 2026, and in 2024 the affordability ratio was 11.6, meaning prices are over eleven times average earnings, among the least affordable in England and Wales. The standard method identifies a need of about 4,344 homes a year, around 91,230 homes to 2045. Meeting this while protecting the county's character is a major challenge.

The human version (we wrote this, not the council)This section covers health and wellbeing. Buckinghamshire performs well on many health measures, but inequalities remain, with life expectancy in the most deprived areas about 5.4 years lower than in the least deprived. The design and accessibility of places, and access to green space, services and sustainable transport, all influence health. The Plan aims to support healthy, inclusive communities through well-designed places, supported by the Buckinghamshire Design Code.

The human version (we wrote this, not the council)This policy treats infrastructure as a prerequisite for development, not an afterthought. All proposals must secure the infrastructure needed to support their impacts, whether through on-site works, off-site delivery or financial contributions, and must align with the Infrastructure Delivery Plan. Essential facilities should be operational before the homes or commercial space they serve are finished. If a developer claims these obligations make a scheme unviable, an independently verified viability assessment is required, with critical infrastructure prioritised over desirable projects. Applications without the necessary legal guarantees, through planning obligations or the Community Infrastructure Levy, will be refused.

The human version (we wrote this, not the council)This section sets out the Plan's vision for Buckinghamshire in 2045. It describes a county that has kept its rural character, protected the Chilterns National Landscape and made the most of brownfield land (previously developed land). New communities are healthy, well designed and served by the right infrastructure, with housing for different groups including key workers. The economy has grown in creative industries, space and high-performance technology, town centres have been revitalised, and green spaces, biodiversity and sustainable travel have been strengthened.

The human version (we wrote this, not the council)This section sets out the Hertsmere Vision, called Delivering Better Futures, which is applied across four themes: Growing Opportunity, Strong Homes Secure Futures, Community Equals Place, and Delivering Excellence. It turns these themes into Strategic Objectives, listed A to K and not in order of priority. They include a thriving local economy, regeneration of Borehamwood and Potters Bar, meeting housing needs, affordable homes, a greener Borough and responding to the climate emergency, including a zero-carbon target by 2050. Each policy and allocation states which objectives it meets.

The human version (we wrote this, not the council)This section sets out the proposed housing policy. The council proposes allocating sites, with individual policies for the largest sites and a grouped policy for the rest. It would cover housing mix, affordable housing and review mechanisms, and specialist housing. The evidence shows local housing need of 804 homes a year, with 304 a year of rented affordable homes and potential demand for 412 a year of affordable home ownership. It also shows a need for 786 to 815 specialist older persons' units to 2039, and recommends M4(2) for all new homes and at least 3% at M4(3). Question 9 asks for additional important issues.

The human version (we wrote this, not the council)This policy supports more housing for older people and others with care or support needs, where there is an identified need and the location and design are suitable. This includes retirement, sheltered, extra care and supported living housing, and residential and nursing care. Where care is part of the case, applicants must show a qualified care provider can run it for the lifetime of the development. Schemes should be close to services. Loss of existing care accommodation needs justification. Major residential schemes must provide at least 40% of homes to M4(2), at least 5% of market homes to M4(3)(2)(a) and up to 10% of affordable homes to M4(3)(2)(b).

The human version (we wrote this, not the council)This policy, Strategic Policy SP3, makes sure new development is backed by the infrastructure it needs. Infrastructure must be phased with new homes through an 'Infrastructure Led Approach' and must not overload what already exists. Required infrastructure includes highway upgrades, sustainable transport, more school places, healthcare, emergency services, Protected Green Space, broadband, sewer network improvements and flood prevention. The Council will use planning obligations to secure provision or money from developers. It will review the Southend Community Infrastructure Levy and may use compulsory purchase powers. The text notes problems such as Victorian sewers and parts of the Leigh electricity network operating close to capacity.

The human version (we wrote this, not the council)This section sets out Objective 2, on climate change. It supports the move to a net zero carbon Buckinghamshire by 2050, directing growth to the most sustainable locations and designing development to cope with flooding and climate extremes. Transport causes 51% of the county's emissions. Areas at higher flood risk include parts of South Bucks, the Thames near Wycombe, east of Aylesbury and around Buckingham. Development is steered first to sites with the lowest flood risk.

The human version (we wrote this, not the council)This policy requires affordable housing on major residential sites of 10 or more homes, or 0.5 hectares or more. Sites in or released from the Green Belt must provide 50% affordable housing, and other sites 40%. The tenure split should be 65% social rent and 35% shared ownership, with set mixes of home sizes for each. Where on-site provision is not feasible or viable, a financial contribution will be sought, and the applicant pays for the Council's valuer. Vacant building credit may apply. Neighbourhood plan policies on mix can take precedence. The supporting text says the HEDNA identified a need for 714 affordable homes per annum.

The human version (we wrote this, not the council)This policy sets requirements for new housing development. Schemes must provide a mix of types and tenures, including homes for people with mobility issues, older people and young people. Independent living units for the over 55s are encouraged, with bungalows on sites over 25 units. Serviced self-build plots must be offered where the register shows demand, and unsold plots can be built as general housing after 12 months. Major developments should provide about 10% special needs housing. Net density must be at least 30 dwellings per hectare, 35 on allocations, and 50 or more in and around town centres.

← Back to the plan search