The human version (we wrote this, not the council)This section describes Corley and the site H18, Littlehurst Nursery (CFS004). It is a garden centre on the border with Nuneaton and Bedworth Borough Council. It is previously developed land and is on the Brownfield Land Register as BFR03. The site is in the Green Belt but is not considered Grey Belt in the Green Belt Review of December 2025. The council says redevelopment could help meet local housing need. The site is small, enclosed by established housing and has access to the highway network and local services. Subject to design and mitigation, particularly on access, it can take homes.
Infrastructure & utilities
The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.
393 sections of the plan, in document order.
The human version (we wrote this, not the council)This allocation covers a 293.6-hectare site adjoining Haddenham for a minimum of 6,610 homes, with around 3,545 in the plan period, plus 7 Gypsy and Traveller pitches and 3,500 sqm of town centre uses. It requires three primary schools, a secondary school, improved access to Haddenham and Thame Parkway station and better bus services. Development must integrate Snakemoor Nature Reserve, protect Haddenham Conservation Area, and manage odour and other impacts from the nearby wastewater treatment works. A site-wide masterplan is required.
The human version (we wrote this, not the council)This site allocation is for 65 dwellings at Hallmeadow Road/Riddings Hill in Balsall Common. The site was allocated in the Solihull Local Plan (2013), and the Green Belt boundary was changed then, so no policy changes are needed to bring it forward. Development should include public open space, play areas and above ground SuDS. Developers will be expected to contribute to education, health services, playing pitches and the Balsall Common Multi Modal Package. The Council owns the site and is seeking to sell it to a housing developer. The text then lists four broad locations for growth, BC8 to BC11.
The human version (we wrote this, not the council)This policy manages flood risk and water use. Development in flood risk areas must pass national tests that steer building to the safest available land, and no new development is allowed in Flood Zone 3b, the functional floodplain. Floor levels in Flood Zones 2 and 3 must sit at least 300mm above predicted maximum flood levels, and major schemes need sustainable drainage limiting runoff to greenfield rates. Buildings must stay 10 metres from main rivers and 5 metres from other watercourses. As the district is seriously water stressed, new homes must use no more than 110 litres per person per day.
The human version (we wrote this, not the council)This policy covers houses in multiple occupation (HMOs). Proposals are permitted only where they do not lose housing suitable for families, do not cause harmful overconcentration, are well connected to local services, and are well designed to HMO standards. In Article 4 Direction areas, small HMOs in the C4 Use Class (3 to 6 unrelated people) need the original dwelling to have gross internal floorspace of 130 square metres or more. Loss of an HMO, or self-containment of part of one, is refused unless set conditions are met, such as adequate replacement provision.
The human version (we wrote this, not the council)This allocation sets out a 217.5-hectare site south-west of Buckingham for a minimum of 4,700 homes, with around 2,235 in the plan period, plus 10 Gypsy and Traveller pitches, about 1.7 hectares of employment land and around 2,000 sqm of town centre uses. It requires three primary schools, a secondary school and the Buckingham South Spine Road linking the A413 to the A421. Development must protect the setting of Gawcott Conservation Area with a green buffer, manage flood risk around the River Great Ouse and Padbury Brook, and follow a site-wide masterplan.
The human version (we wrote this, not the council)This section describes Kingsbury, a large semi-rural village in the west of the Borough, south of Tamworth. It is limited by flood plain to the west and the railway to the east, and is surrounded by Green Belt. Kingsbury Hall is on the Historic England Buildings at Risk register. The Hall and its grounds cover 2.8 ha, with about 2.3 hectares of adjoining developable land. The council proposes removing the site from the Green Belt to help preserve the Hall. A planning application (PAP/2025/0320) for up to 283 dwellings west of Tamworth Road has a resolution to grant permission, so the site is allocated.
The human version (we wrote this, not the council)This section describes the parish of Hampton in Arden, which includes the villages of Hampton-in-Arden and Catherine-de-Barnes, divided by the M42. The area lies in the Green Belt known as the Meriden Gap. The villages share a primary school, library, doctor’s surgery and shops, and Hampton-in-Arden has a station on the West Coast Mainline. Because services are limited, growth should be kept to proportionate extensions so the school is not overwhelmed. Needs include better walking and cycling links, green space and health provision. A resolution to grant up to 95 dwellings at Land at Oak Farm was taken in May 2023, and 96 dwellings off Meriden Road are under construction.
The human version (we wrote this, not the council)This policy says the Council will keep a register of people seeking serviced plots for self-build and custom-build housing, and will try to identify plots to meet the identified need. Proposals are supported where they make optimal use of land, support the spatial strategy, include affordable housing where appropriate, and are well located and designed. They must show how the design-led approach was used and identify any design elements that may need adaptation. The supporting text says such small schemes will not normally need to contribute to affordable housing.
The human version (we wrote this, not the council)This allocation covers a 177.2-hectare urban extension to Princes Risborough delivering up to 2,895 homes within the plan period, plus 11 Gypsy and Traveller pitches and a local centre with 300 to 400 sqm of shops and around 500 sqm of business space. A central requirement is the Princes Risborough Relief Road, a complete new alternative route to the A4010. The site must also provide two primary schools, contributions to secondary education, a green corridor along the Crowbrook, and keep a gap between the town and Longwick.
The human version (we wrote this, not the council)This policy requires new development to provide waste and recycling facilities in line with the council's 2024 storage and collection guidance, sited so they are easy to access and do not harm the street scene or block sight lines. Development should reduce waste by reusing materials, enabling on-site sorting, using modern construction methods such as prefabricated and modular building, and providing proper storage for kerbside collection and composting. Major schemes must submit a Site Waste Management Plan including a Circular Economy Statement, and developers should consider extracting usable minerals from a site before building.
The human version (we wrote this, not the council)This allocation sets out a 103.2-hectare site south of Stoke Mandeville for a minimum of 1,650 homes within the plan period, plus around 1,500 sqm of town centre uses. Higher densities are focused near the railway station, which will be enhanced as a transport hub with a new pedestrian and cycle crossing of the railway. Requirements include a primary school, the South Spine Road, buffers along the HS2 corridor, protection of the setting of Stoke House, and a site-wide masterplan and phasing strategy.
The human version (we wrote this, not the council)This policy sets the Council's approach to building a thriving and inclusive local economy with access to education, training and good jobs. It supports sectors of local importance: keeping Hertsmere's key role in the international film and television industry, meeting the need for B8 logistics uses, improving understanding of data centres, meeting the needs of the four main towns, and expanding green industries. It also covers timely infrastructure, safeguarding industrial land, high-quality design of employment development, and retaining and securing affordable workspace.
The human version (we wrote this, not the council)This policy controls lorry traffic in the Vale of Evesham Control Zone. Business proposals that would increase heavy goods vehicle traffic by 5% or more must show that the economic benefits outweigh the traffic impact, that the development cannot go on a site with better access to the county's lorry route network, and that the proposed delivery routes are the least harmful to local communities. An HGV is defined as a lorry over 7.5 tonnes, and permissions will cap the number of lorry movements through conditions or legal agreements that bind future occupiers.
The human version (we wrote this, not the council)This section explains the background to the Vale of Evesham Control Zone. The policy is carried over from the Stratford-on-Avon Core Strategy with the county council's support, and similar designations exist in neighbouring South Worcestershire and Cotswold district plans, though Wychavon proposes to drop it. The 5% threshold has proved appropriate because small schemes have little effect on lorry movements. Larger increases are only acceptable where benefits, such as gains for the local economy, outweigh the traffic impact.
The human version (we wrote this, not the council)This section opens the chapter on delivering infrastructure. During consultation, residents consistently raised concerns that existing infrastructure lacks capacity and that new development would make things worse. The plan therefore requires housing and employment growth to be supported by the infrastructure needed to serve it, including roads, schools, health services and community facilities, with development contributing to that provision.
The human version (we wrote this, not the council)This allocation covers a 411.4-hectare site around Winslow for a minimum of 9,370 homes, with 3,650 in the plan period, plus 15 Gypsy and Traveller pitches, around 16 hectares of employment land and 3,500 sqm of town centre uses. It requires four primary schools, two secondary schools, new link roads and integration with East West Rail, whose safeguarded land must not be built on. Green gaps must prevent merging with Great Horwood. The employment land targets high-value sectors, helped by the new station and the Oxford to Cambridge growth corridor.
The human version (we wrote this, not the council)This site allocation safeguards land shown on the Policies Map for education uses linked to the expansion or redevelopment of Arden Academy. The wider site known as KN2, Land South of Knowle, now largely has planning permission for housing. After the 2020 plan was withdrawn in October 2024, an indicative masterplan was produced and endorsed at Cabinet in December 2024. This identified 1.8 ha of land for transfer to the Council, mainly linked to 200 dwellings on land west of Warwick Road. The land is expected to be transferred in phases later this year. The text then names land around Dorridge Railway Station, KN3, as a broad location.
The human version (we wrote this, not the council)This section introduces the Infrastructure Delivery Plan policies, which support objectives on providing infrastructure in the right place at the right time, net zero carbon, quality of life and connectivity. It repeats a consistent message from public consultation: people are worried that existing roads, schools and health facilities lack capacity and that growth will add pressure. The plan responds by requiring new development to be matched with the infrastructure identified to support it.
The human version (we wrote this, not the council)This policy requires developments to provide, or pay towards, the infrastructure needed to cope with the extra demand they create. Permission will only be granted where adequate infrastructure capacity exists or will be provided, taking account of the Infrastructure Delivery Plan and the combined impact of other committed schemes, while supporting twenty-minute neighbourhoods served by public and active transport. On-site provision is preferred; where that is not feasible, financial contributions will be sought, limited to what is necessary, directly related and fairly proportionate to the development.
The human version (we wrote this, not the council)This section accompanies the policy on securing infrastructure provision. It restates the core tests: development must show that adequate infrastructure capacity exists or will be delivered to offset its impacts, guided by the Infrastructure Delivery Plan and cumulative effects from other committed schemes, while helping create twenty-minute neighbourhoods. It confirms the preference for infrastructure built on site, with financial contributions towards local and strategic infrastructure sought only where on-site delivery is shown to be unfeasible.
The human version (we wrote this, not the council)This policy deals with when and how infrastructure is delivered. Projects supporting the plan's growth are listed in the Infrastructure Delivery Plan, and developments must deliver critical and essential infrastructure in a timely, proportionate way, with early provision seen as vital. Temporary facilities may be accepted as an interim measure where they are fit for purpose and there is a clear timescale and mechanism for permanent replacements. Contributions are typically secured through Section 106 legal agreements and Section 278 highway agreements.
The human version (we wrote this, not the council)This section sets out timing expectations for different types of infrastructure on new developments. Community facilities must come with the first phase, and open space should be ready for the earliest occupiers rather than left to the end. New schools should be provided early because off-site schooling harms community building. Drainage and flood works are installed early and must be defect free, utilities including broadband must be in place before occupation, and public transport, walking and cycling infrastructure is prioritised to establish sustainable travel habits from the outset.
The human version (we wrote this, not the council)This section introduces the transport infrastructure policies. The plan is built on the idea of 20-minute neighbourhoods, where daily needs can be met close to home, and new infrastructure is planned to achieve this for new and existing residents. Where journeys are needed, walking, cycling and public transport are encouraged through new facilities and the safeguarding of existing routes. Some highway improvements and mitigation are also needed and land is protected for them.
The human version (we wrote this, not the council)This section is Appendix C, which lists the evidence base for the Local Plan. It is a table giving a reference number, subject, report title and who prepared it with the date. Subjects include housing and employment, flood risk, gaps, Green Belt, green infrastructure, green space, Gypsy and Travellers, habitats, heritage, infrastructure and landscape. Examples are the Housing and Economic Development Needs Assessment by Iceni (November 2022), the Strategic Flood Risk Assessments by JBA Consulting, the Green Belt Study by LUC (December 2025) and the Gypsy and Traveller Accommodation Assessment by arc4 (May 2026).
The human version (we wrote this, not the council)This policy protects land needed for future transport schemes from development that could block their delivery. Protected projects include reopening the Stratford to Honeybourne railway, a new station at Long Marston Airfield, and double-tracking the Coventry to Leamington line with a second platform at Kenilworth. It also safeguards land for a multi-modal transport interchange near the University of Warwick, park and ride sites serving Leamington and Stratford-upon-Avon, disused railway lines earmarked as future walking and cycling routes, and improvements to key A46, M40 and M42 junctions.
The human version (we wrote this, not the council)This section lists the full set of protected transport schemes and explains the approach. Alongside rail, park and ride and strategic road junction schemes, it safeguards major link roads tied to specific development sites, including routes at Stratford-upon-Avon, Wellesbourne, Henley-in-Arden, Kenilworth, Warwick, Stoneleigh and Bidford, and a new consolidated M40 junction to replace Junctions 13 and 14. Development in these areas is only permitted where it would not hinder a scheme's design, delivery or operation, or is temporary or reversible. The aim is to prevent prejudicial development without needlessly sterilising land.
The human version (we wrote this, not the council)This policy requires workspace proposals to provide suitable unit types, sizes and rents, particularly for social, cultural or economic development uses. Existing affordable workspace should be kept or re-provided unless this harms industrial intensification. Major commercial development should, when viable, provide at least 10% of rentable floorspace (Net Internal Area) as affordable workspace at 50% of market rents, on site. Off-site provision is acceptable only if on-site provision is not feasible or gives greater economic benefits, with payments in lieu calculated using Table 8.3. Affordable workspace must be secured for a period agreed by the Council.
The human version (we wrote this, not the council)This allocation sets out a 143-hectare site east of Brackley, next to the county boundary, for around 2,890 homes, plus 5 Gypsy and Traveller pitches, about 2 hectares of employment land and 2,500 sqm of town centre uses. It requires two primary schools, contributions to secondary education, improvements to the A422 corridor and buffers to HS2, Ancient Woodland and the sewage treatment works. Development must conserve the setting of Turweston Conservation Area and manage flood risk from the River Great Ouse.
The human version (we wrote this, not the council)This section sets out the education allocations. A new secondary school site is allocated at Carpenders Park Farm, Oxhey Lane (ED1), able to accommodate a school of up to 10 forms of entry serving Carpenders Park, South Oxhey, Eastbury and parts of neighbouring boroughs. Land including and adjoining The Reach Free School (ED2) is allocated for a new secondary school or a four form entry expansion, and a primary school site at Woodside Road, Abbots Langley (ED3) is carried over from 2014. Identified school sites will be safeguarded for educational use.