Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Jobs & economy

Employment land, offices, industry, warehousing, rural businesses, tourism and skills.

246 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy allocates sites in Northampton for employment use, which must accord with the Development Plan. A table lists the sites with area in hectares and indicative jobs. Sixfields East is 10.18 hectares with 871 jobs. Crow Lane is 2.92 hectares with 94 jobs. Martin's Yard is 1.4 hectares with 194 jobs. Land at Waterside Way is 0.98 hectares with 445 jobs. South of Junction 15, M1 is listed at 68 hectares under policy N23. The supporting text covers strategic distribution, including Northampton Gateway.

The human version (we wrote this, not the council)This site allocation covers 1.4 hectares of allotments next to Memorial Park, Coleshill (H3). It is allocated for at least 30 dwellings. Replacement allotments are required, and policy C1 allocates about 2.5 hectares off Maxstoke Lane, south of the cemetery, for cemetery and allotment use. The text notes that Coleshill Town Council identified a need for a cemetery extension. It also covers the Coleshill Manor employment site, where a 1991 permission for up to 10,033 sq.m of offices has been affected by HS2. The council does not encourage logistics or major employment uses there.

The human version (we wrote this, not the council)This section sets out how the Borough Council will treat Coleshill Manor, an employment site in the Green Belt. It supports replacing buildings that have been demolished or cannot be built because of HS2. Office, hospitality and research and development uses are supported if they form a high quality campus style development in a landscaped parkland setting. Logistics and warehousing (Use Class B8) will not be supported. Development must keep the Green Belt open and respect the setting of the Grade II listed building. Buildings should not exceed two to three storeys. Lighting and signage must be kept modest. Land contamination from a historic landfill may need investigation.

The human version (we wrote this, not the council)This policy, Policy DM6.3, protects and manages the city's Employment Areas. Major schemes there should offer a range of flexible unit sizes, including space for small and medium sized enterprises and, where suitable, incubator, grow on or affordable workspace. Class B and Class E(g)i-iii uses will be supported. Other uses are only allowed in set cases, such as a similar Sui Generis employment use, or where there is no reasonable prospect of employment use after at least a 1-year active marketing exercise. Employment Growth Areas will be promoted for modern floorspace. Article 4 Directions may be used to stop loss to housing, and the Agent of Change Principle applies.

The human version (we wrote this, not the council)This section introduces the plan's approach to development in the countryside. It recognises that many of South Warwickshire's economic generators sit outside the main urban areas, so the plan supports existing rural businesses and communities to keep growing, in line with the South Warwickshire Economic Strategy. It also supports a number of Major Investment Sites, which are existing large employment sites of regional and national significance that the plan seeks to safeguard and grow.

The human version (we wrote this, not the council)This section sets out the full policy and reasoning for the Core Opportunity Area. Areas outside it remain suitable for more local investment, subject to other plan policies. The area covers a band across central South Warwickshire connected by the A46 and the central section of the M40, where existing employment and research clusters are concentrated. The aim is to attract inward investment and encourage businesses to co-locate, while respecting national policies including the Green Belt and securing transport improvements from new schemes.

The human version (we wrote this, not the council)This policy (DS.10) safeguards Major Investment Sites for future employment, research and investment. At Gaydon, the Jaguar Land Rover and Aston Martin Lagonda sites are safeguarded for automotive research and manufacturing, with a further 124.5 hectares next to the JLR site and 7.5 hectares next to the Aston Martin site, and a possible Local Development Order to give certainty on future investment. The Long Marston Rail Innovation Centre, the UK's only looped standard gauge test track, is safeguarded for rail-related employment along with its connection to the national rail network.

The human version (we wrote this, not the council)This section details all eight Major Investment Sites under Policy DS.10. They are the Gaydon automotive hub, the Long Marston Rail Innovation Centre, land south of Coventry including the former Coventry Airport, where a gigafactory or wider advanced manufacturing is planned alongside a 90 hectare country park at Gateway South, Stoneleigh Park with around 5.4 hectares of extra employment land, 62 hectares at the University of Warwick Main Campus, the university's Wellesbourne Campus, Wellesbourne Airfield, where up to 65 hectares of employment land depends on relocating the runway, and Fen End for automotive and motorsport uses.

The human version (we wrote this, not the council)This site allocation covers about 5.14 hectares of land west of Birch Coppice, south of the A5 at Dordon (E2). It is allocated for employment. Landscaping is required along the A5 and next to nearby homes. The existing allotments must be replaced, with services and infrastructure, at a location within 3/4 mile walking distance of the existing site or closer, and existing tenants must be consulted. Access should be provided through the adjoining Indurent Park site from Trinity Road. The text also notes a high pressure gas pipeline and the need to secure access to E2 through the E5 allocation.

The human version (we wrote this, not the council)This site allocation covers 41.49 gross hectares east and south of Indurent Park, Trinity Road, Dordon (E5). It is allocated for employment in Use Classes B2, B8 and Eg(iii), providing about 70,000 sq.m of floorspace, with at least one unit of at least 9,290 sq.m. A buffer of at least 200 metres must protect homes in Freasley. Access will be from Trinity Road, with contributions to M42 Junction 10 and a Transport Assessment. A link road must give lawful access to site E2 before any building is occupied. Active travel improvements and an Employment and Skills Plan are required.

The human version (we wrote this, not the council)This section describes the proposed strategic employment site near No Mans Heath, south west of Junction 11 of the M42. The site is about 108 hectares. It would meet the 50 to 100 hectares of strategic employment land that the West Midlands study indicated for the M42 corridor in North Warwickshire. It lies outside the Green Belt. National Gas Transmission infrastructure crosses part of it. The site will only be brought forward if two appeals for employment use at Junction 9 of the M42 are unsuccessful. It will include a service centre and a public transport hub, and care is needed with landscaping and building height.

The human version (we wrote this, not the council)This site allocation covers some 108 hectares west of No Man's Heath, north of the B5493, for strategic employment (E6). It includes a landscaped tree screen, retention of the Sandy Lane Spinney ancient woodland with a 15m buffer, and buildings set into the site to limit height. It must also provide a local service centre of no more than 1,000m2, lorry parking, and a transport and mobility hub. Other requirements include road improvements, drainage that protects the Mease SAC, BREEAM Excellent buildings and an Employment and Skills plan. To avoid duplicating strategic employment provision, it will only be supported if three named planning appeals on other sites are dismissed.

The human version (we wrote this, not the council)This policy, Policy DM6.5, sets the hierarchy of shopping and commercial centres. Southend City Centre comes first for retail and other uses that attract many people, as a sub-regional centre and the key driver of regeneration. Leigh and Westcliff are District Centres, and other places are Neighbourhood and Local Centres. Article 4 Direction(s) will be used to control ground floor changes from shops to homes in the City Centre and District Centres. Frontages must stay active, and betting shops, pay day loan shops and adult gaming centres must be separated by at least two units in other uses. Retail parks are promoted for larger format units.

The human version (we wrote this, not the council)This section describes Alvecote and the site H17, the Coal Yard on Robeys Lane (CFS153). It is a former coal sidings and wharf on the boundary with Tamworth, and still has a coal and solid fuel depot. It is previously developed land close to Alvecote Priory, Pooley Park, the canals and Alvecote Marina. The council sees a chance for live work units and flexible commercial uses linked to the canal's heritage and leisure uses. Redevelopment should use wharf or warehouse style buildings of two to three storeys, with any third storey in the roof space and frontages facing the canal.

The human version (we wrote this, not the council)This site allocation covers 0.92 hectares at the Coal Yard, Robeys Lane, Alvecote (H17, CFS153). It is allocated for mixed use development with homes and employment generating uses in live work units. Industrial, commercial, retail, leisure and service uses may be included if they suit the adjoining canal, marina and boat repair facilities. Employment must follow Policy LP41. The housing element should provide at least 12 residential units that reflect the canal's industrial heritage. Homes should be no more than three storeys and have active frontages, with habitable windows and entrances facing the canal.

Policy DS.11

Rural Economy

p. 122

The human version (we wrote this, not the council)This policy supports economic development in the countryside, outside allocated sites and settlement boundaries. All proposals must be of an appropriate scale, reuse existing buildings where possible, avoid unacceptable impacts on local roads and respect the character of the area. It supports agricultural and forestry businesses, including converting buildings that have existed for at least ten years, farm diversification and equestrian uses, plus tourism and leisure uses such as visitor accommodation, expanded holiday caravan sites and golf facilities.

The human version (we wrote this, not the council)This section presents the full Rural Economy policy and its justification. Beyond farming and tourism, it supports other rural businesses through building conversions and small-scale expansion where sites can be reached without a car. Larger proposals of regional or national significance should go to the Core Opportunity Area, and locations elsewhere must be justified. The evidence shows 91 agri-tech businesses in South Warwickshire supporting 1,610 jobs, and national policy backs the sustainable growth of all types of rural business.

The human version (we wrote this, not the council)This section gives the full Rural Housing policy with its detailed conditions and justification. Before a historic building can become a home, evidence of robust marketing for business use is needed, and homes tied to rural businesses require a business plan, occupancy conditions and functional and financial tests. The justification notes that rural services have declined, public transport is poor or absent in many villages, and house prices are out of reach for many rural workers, so the plan aims to balance protecting the countryside with meeting local needs, including affordable housing.

The human version (we wrote this, not the council)This policy, Policy DM6.6, covers tourism and visitor accommodation. The Central Seafront is the main focus for new tourist attractions, with the City Centre and wider Seafront, including Leigh-on-Sea and Shoeburyness, also supported. Major tourism schemes must improve sustainable travel for visitors. The foreshore, parks and gardens will be protected. New visitor accommodation should be in the Key Areas: Southend Central Neighbourhood, the District Centres of Leigh and Westcliff, and places closely linked to the Seafront and London Southend Airport. Visitor accommodation there is kept unless no longer viable. Changing homes to holiday lets used over 90 days a year is assessed for housing and amenity impacts.

Policy DS.13

Green Belt

p. 127

The human version (we wrote this, not the council)This policy sets out where the Green Belt boundary will change to make room for the plan's proposals. Six villages, including Bubbenhall, Claverdon and Snitterfield, are taken out of the Green Belt. Land is also removed for new settlements and major growth sites at places such as Hatton, Kenilworth South, Leamington Spa North, South of Coventry and Coventry Airport, plus smaller sites at Alcester, Hampton Magna, Kenilworth, Studley and Stoneleigh. A boundary error at Leek Wootton is also corrected.

The human version (we wrote this, not the council)This section explains the Green Belt changes in full. It allows neighbourhood plans to release small Green Belt sites for local needs where strict conditions are met. National policy applies to proposals both in and out of the Green Belt, and the Golden Rules on affordable housing do not apply to land released under the older 2016 and 2017 local plans. A Green Belt Review found exceptional circumstances justify the changes, because many of the most sustainable growth locations sit within the Green Belt.

The human version (we wrote this, not the council)This section sets out the employment site allocations. Evidence in the South West Herts Economic Study (2024) found no need for new office sites, and recommends resisting any loss of office space. Four existing employment areas are safeguarded: Croxley Business Park (E1), Tolpits Lane (E2), Maple Cross/Maple Lodge (E3) and Kings Langley Employment Area (E4). Two small extensions to Croxley Business Park are allocated as E5 and E6, and Leavesden Park (E7) is allocated as an employment site, protected by an Article 4 Direction that stops offices changing to homes without planning permission.

The human version (we wrote this, not the council)This section sets out how the Local Plan will be monitored. It says monitoring is central to making sure the plan delivers, and that neighbouring plans must also be monitored. Table 9 lists each policy with indicators and targets. Examples include a minimum of 9,598 dwellings delivered to 2033, a minimum of 100 hectares of employment land to 2033, 60 windfall dwellings a year from 2020 to 2033, and housing density of no less than 30 dwellings per hectare. The table also covers Green Belt and Strategic Gap loss, affordable housing, traveller sites and reserve housing sites. A list of appendices A to Q follows.

The human version (we wrote this, not the council)This section introduces Chapter 8 on the economy and culture. It lists the twenty policies in the chapter, from EC1 Meeting Hertsmere's Economic Needs to EC20 Visitor accommodation. They cover employment land and workspace (EC2 to EC10), including affordable workspace and rural employment, and town centres (EC11 to EC16). They also cover harmful uses (EC17), public houses (EC18), markets (EC19) and visitor accommodation (EC20).

The human version (we wrote this, not the council)This policy sets the Council's approach to building a thriving and inclusive local economy with access to education, training and good jobs. It supports sectors of local importance: keeping Hertsmere's key role in the international film and television industry, meeting the need for B8 logistics uses, improving understanding of data centres, meeting the needs of the four main towns, and expanding green industries. It also covers timely infrastructure, safeguarding industrial land, high-quality design of employment development, and retaining and securing affordable workspace.

The human version (we wrote this, not the council)This section covers Warner Bros. Studios at Leavesden, a key asset for the creative industries and one of the few UK locations able to host large-scale film production. The studio tour attracts over 6,000 visitors a day at peak times, and Warner Bros. plans to grow the site by around a quarter. The existing 63 hectare studios site (WB1) is safeguarded, and two expansion sites are allocated: land at Gypsy Lane, Hunton Bridge (WB2) and land west of Leavesden Aerodrome (WB3), which already has planning permission and includes public open space.

The human version (we wrote this, not the council)This section explains the background to the Vale of Evesham Control Zone. The policy is carried over from the Stratford-on-Avon Core Strategy with the county council's support, and similar designations exist in neighbouring South Worcestershire and Cotswold district plans, though Wychavon proposes to drop it. The 5% threshold has proved appropriate because small schemes have little effect on lorry movements. Larger increases are only acceptable where benefits, such as gains for the local economy, outweigh the traffic impact.

The human version (we wrote this, not the council)This policy safeguards employment land in the Employment Land Hierarchy for Class E(g) office and light industrial, Class B2 industrial, Class B8 storage and distribution and related Sui Generis uses. It states a forecast need for 27,093 square metres of net additional employment floorspace up to 2041. This includes a minimum of 14,428 square metres of net industrial floorspace in Key Employment Sites and Employment Areas, and a minimum of 12,665 square metres of net office floorspace in other designated employment areas. New mainly B8 warehousing outside employment areas is limited.

Policy NESS012

Winslow

pp. 149–157

The human version (we wrote this, not the council)This allocation covers a 411.4-hectare site around Winslow for a minimum of 9,370 homes, with 3,650 in the plan period, plus 15 Gypsy and Traveller pitches, around 16 hectares of employment land and 3,500 sqm of town centre uses. It requires four primary schools, two secondary schools, new link roads and integration with East West Rail, whose safeguarded land must not be built on. Green gaps must prevent merging with Great Horwood. The employment land targets high-value sectors, helped by the new station and the Oxford to Cambridge growth corridor.

The human version (we wrote this, not the council)This policy requires employment development in Class E(g), B2 and B8 and related Sui Generis uses to be high quality, well integrated and purpose built. Proposals must show how the design-led approach was used, optimise land and increase job densities, and, where practicable, provide internal fit out beyond shell and core, such as high-speed broadband, toilets, a kitchenette and basic fire detection. They should provide flexible workspace, adequate operational space, good staff amenity and healthy work environments, quality public realm, biodiversity net gain, urban greening and SuDS.

← Back to the plan search