The human version (we wrote this, not the council)This section explains why a new Local Plan is needed. Buckinghamshire became a single unitary council in April 2020, and this is the first plan to cover the whole county under one framework. The old district plans are increasingly out of date, and national policy has changed. National policy identifies a housing need of about 4,344 homes a year up to the end of March 2045. The county must balance this growth with protecting assets such as the Chilterns National Landscape and the Green Belt.
OpenConsult / Buckinghamshire Plan Explorer
Nature & environment
Biodiversity net gain, wildlife, trees, woodland, nature recovery and protected habitats.
86 sections of the plan, in document order.
The human version (we wrote this, not the council)This section covers the environment and landscape. About 32% of Buckinghamshire is Metropolitan Green Belt and around 27% lies within the Chilterns National Landscape. The county has around 180 conservation areas, close to 6,000 listed buildings, and nationally important chalk streams. It faces pressures from flood risk, rising temperatures, water supply and treatment constraints, and biodiversity loss. Balancing new development with protecting these assets is a major challenge for the Plan.
The human version (we wrote this, not the council)This section sets out Objective 1, on the natural and built environment. It aims to conserve and enhance Buckinghamshire's natural, historic and built environments and protect them from inappropriate development. This includes sustaining rural character, protecting the Chilterns National Landscape and Green Belt, improving water quality in rivers and rare chalk streams, and respecting heritage assets. The county has three Special Areas of Conservation, around 180 conservation areas and close to 6,000 listed buildings.
The human version (we wrote this, not the council)This section explains the purpose of the strategy for economic growth. It aims to support a resilient, sustainable and competitive economy by ensuring enough land is available in the right locations to meet employment needs. It seeks to grow high-value, high-productivity sectors by identifying and protecting well-connected strategic employment sites, in line with the Buckinghamshire Economic Growth Plan, and to support the regeneration of town centres as economic hubs.
The human version (we wrote this, not the council)This policy sets out retail and leisure provision. It makes provision for 59,210 sqm of floorspace for retail, food and drink, and leisure and cultural uses by 2035. Needs are met first through sites already built or with permission, then by reducing town centre vacancy rates to 10%, which can provide at least 14,300 sqm, mainly in High Wycombe and Aylesbury. The Plan also allocates around 10,100 sqm of new retail space, and large development sites must provide local centres for day-to-day needs.
The human version (we wrote this, not the council)This section explains the purpose of the infrastructure policy: making sure new development is backed by coordinated, resilient transport, telecoms, utilities and waste facilities. It sets out how the policy will work in practice through the detailed rules in Chapter 7, which cover things like transport requirements, parking, public rights of way, water and telecoms infrastructure, plus wider policies on design, biodiversity, flooding and drainage.
The human version (we wrote this, not the council)This section explains the purpose of the renewable energy policy: supporting the move to a low-carbon, climate-resilient future through energy efficiency, renewable energy generation and careful use of natural resources. It describes how delivery will be supported by the detailed Chapter 7 policies on matters such as water, flooding, biodiversity, landscape, Green Belt, design and heritage, so that renewable energy schemes are well located and protect Buckinghamshire's environment.
The human version (we wrote this, not the council)This section explains the purpose of the community facilities policy: making sure communities can reach the services, facilities and social infrastructure they need. It describes how the policy will be delivered through the detailed Chapter 7 rules on infrastructure delivery, health impact assessment, community, sport and leisure facilities, food growing and fast food outlets, alongside wider policies on design, transport, biodiversity and flooding, so facilities are accessible and support healthy, inclusive communities.
The human version (we wrote this, not the council)This policy sets out how the Council will protect and improve the natural environment and respond to climate change. It commits to conserving the Chilterns National Landscape, delivering at least 10% biodiversity net gain on qualifying developments, and supporting nature recovery through the local strategy. It also covers protecting water quality, aiming for good status in rivers and groundwater by 2027, directing growth to places that reduce car travel, using sustainable drainage, adopting higher water efficiency standards, and supporting renewable energy.
The human version (we wrote this, not the council)This section explains the purpose of the natural environment policy: conserving and enhancing Buckinghamshire's biodiversity, landscapes, water and green spaces while strengthening resilience to climate change. It sets out how delivery will run through the detailed Chapter 7 policies on matters such as water quality, biodiversity gain, green infrastructure, trees, protected sites, Green Belt, landscape character, flood risk and drainage.
The human version (we wrote this, not the council)This section explains the purpose of the placemaking policy: securing high-quality, sustainable development that responds to Buckinghamshire's character, heritage and landscape. It describes how delivery will work through the detailed Chapter 7 policies on design, residential amenity and space standards, together with wider rules on heritage, community facilities, transport, biodiversity, landscape and flooding, so new places are attractive, healthy, well connected and resilient.
The human version (we wrote this, not the council)This section explains the purpose of the heritage policy: conserving and enhancing Buckinghamshire's historic environment as an irreplaceable resource that supports local character and identity. It sets out how delivery will run through the detailed Chapter 7 policies on conservation areas, heritage assets and design, alongside wider rules on amenity, transport, biodiversity, landscape and flooding, so historic buildings and places are protected as part of sustainable growth.
The human version (we wrote this, not the council)This section explains the purpose of the healthy communities policy: promoting healthy, inclusive and safe places and helping to reduce health inequalities across Buckinghamshire. It describes how delivery will work through the detailed Chapter 7 policies on health impact assessment, community and sports facilities, food growing and fast food outlets, plus wider rules on design, transport, green infrastructure and environmental quality.
The human version (we wrote this, not the council)This allocation creates a new settlement on a 381.6-hectare site in north Buckinghamshire, next to the Milton Keynes boundary. It will deliver a minimum of 8,230 homes, with around 3,200 in the plan period to 2045 and the rest beyond, plus 15 Gypsy and Traveller pitches and around 2,500 sqm of town centre uses. Requirements include four primary schools, two secondary schools, the Whaddon Bypass and a spine road network. Green gaps must keep Beachampton, Nash and Whaddon separate, and Ancient Woodland must be protected with buffers.
The human version (we wrote this, not the council)This allocation covers a 113-hectare site at south-west Aylesbury for 1,400 homes and 5 Gypsy and Traveller pitches, with a 2FE primary school, on-site health and community facilities, a linear park and sports pitches. It requires a Southwest Link Road connecting the Stoke Mandeville relief road to the A418 Oxford Road, plus strategic flood defences and drainage. Outline permission was granted in May 2026, with construction expected from 2028, delivering fifty homes initially then 140 per year. A buffer is needed against noise from HS2.
The human version (we wrote this, not the council)This allocation covers Gomm Valley and Ashwells in High Wycombe for an assumed 646 homes, 1.2 hectares of employment land and a one-form entry primary school. Development must be landscape-led and keep an undeveloped gap of at least 200 metres between High Wycombe and Tylers Green. The valley contains sensitive wildlife sites, including Gomm Valley SSSI, ancient woodland and chalk grassland, so buffers and a significant biodiversity net gain are required. A traffic-calmed spine road linking Cock Lane and Gomm Road is needed, and parts of the site already have planning permission.
The human version (we wrote this, not the council)This allocation supports an assumed 100 homes at Abbey Barn North, High Wycombe, designed to fit the site's bowl-shaped, sloping landscape. Conventional houses with gardens are not considered appropriate; innovative homes set within the landscape are required instead. The plans require a buffer of at least 15 metres to Deangarden Wood, retention of chalk grassland, new footpaths, cycle and bridleway links, and contributions to road, bus and path improvements. A development brief has already been prepared for the site.
The human version (we wrote this, not the council)This allocation covers land off Amersham Road, including Tralee Farm, at Hazlemere for an assumed 350 homes. The layout must keep a sense of separation between Hazlemere and Holmer Green, and the existing orchard, woodland at Badger Way and field boundaries should be retained and linked by green space. Access would come from the A404 and Wycombe Road, with walking and cycling routes through the site. The development must also fund the extra primary school places it creates.
The human version (we wrote this, not the council)This allocation describes Salden Chase, a roughly 145 hectare new community at Newton Longville delivering up to 1,855 homes plus 60 extra care housing units. It includes about 2.07 hectares of employment land, a primary school with pre-school, a secondary school on 5.2 hectares, a neighbourhood centre, a GP surgery and 53.67 hectares of green open space. Road access comes from three points, with walking, cycling and bus links to Bletchley and Milton Keynes. Outline planning permission has already been granted, and part of the land is safeguarded for East West Rail.
The human version (we wrote this, not the council)This allocation supports an assumed 1,240 homes on around thirty-one hectares west of Shenley Park, Whaddon, continuing the planned expansion to the east. It includes a primary school for 210 pupils with a 30 place nursery. Two ancient woodlands, Thickbare Wood and Coddimoorhill Wood, need protective buffers of 50 metres, and an archaeological dig of a Roman settlement must inform the layout. Detailed traffic modelling, likely including improvements to the A421, and extensive flood risk work are also required.
The human version (we wrote this, not the council)This allocation sets out an assumed 1,500 homes on around thirty hectares off Little Horwood Road, Winslow. It includes a primary school, a local shop, a community hall and healthcare provision, plus financial contributions to secondary and special needs education. Access comes from Little Horwood Road and the B4032, with good walking and cycling links to the town centre and the new Winslow Station. The setting of the Grade II listed Redhall Farmhouse must be protected, and half the site needs archaeological investigation first.
The human version (we wrote this, not the council)This allocation supports an assumed 630 homes on around twelve hectares west of Furze Lane and north of Verney Road, Winslow. Higher density is expected because of the nearby train station, with direct walking and cycling links to the town centre, station and schools. A buffer is required between homes and the railway line, and veteran ash trees on the site must be safeguarded. Financial contributions are needed towards Verney Road improvements and other strategic infrastructure for Winslow.
The human version (we wrote this, not the council)This allocation proposes an assumed 355 homes on 8.93 hectares north of Reynolds Mead, Cheddington. The site is close to the Mentmore Conservation Area and Registered Park and Garden, so a heritage assessment and careful design are required. A substantial buffer must protect the wood pasture priority habitat next to the northern boundary, and landscaping must soften views from the surrounding countryside. Contributions are required to shared infrastructure including the Horton Bypass and a new railway bridge, and protected area mitigation must be in place first.
The human version (we wrote this, not the council)This allocation covers land at Parsonage Farm and west of Wood Lane, Tingewick, for an assumed 175 homes across two parcels, only one of which has potential road access. The scheme must link the western field through to the eastern part, improve walking and cycling routes into the village, and protect the setting of the Tingewick Conservation Area and nearby listed buildings. Ecological buffers must retain boundary trees and hedgerows, and landscaping is needed to reduce noise from the A421 bypass.
The human version (we wrote this, not the council)This allocation designates approximately twelve hectares of land north of Lower Icknield Way, Princes Risborough, as a new Key Employment Area, of which 9.6 hectares is expected to be developed for business, industrial and storage uses. The site is visible from the Chilterns National Landscape and the Ridgeway National Trail, so high-quality design and structural landscaping are required, including new hedgerow planting. Access would come from Lower Icknield Way, with contributions towards the Princes Risborough to Chinnor walking and cycling route.
The human version (we wrote this, not the council)This allocation provides 4.5 hectares of employment land behind Weston Road, Aston Clinton, of which 3.6 hectares is expected to be developed. It supports the expansion of Halton Brook Business Park, an established base for medical instrument manufacturing, reinforcing the area as a hub for medical technology. Development must be coordinated with the neighbouring allocated site, keep and improve the hedgerow and trees on the western boundary, and be designed to sit comfortably alongside the homes on Weston Road.
The human version (we wrote this, not the council)This allocation sets aside land at the former Finmere Aerodrome near Tingewick as a new Key Employment Area, delivering approximately 27 hectares of employment land for industrial, storage and distribution uses. Development should be masterplanned, led by landscape design, and focus on the previously developed (brownfield) parts of the former RAF airfield. Requirements include safe access from the A421, a bus turning circle, protection of the Tingewick Conservation Area and nearby Ancient Woodland, and archaeological investigation. Around 16 hectares of new employment development are expected after supporting infrastructure.
The human version (we wrote this, not the council)This policy sets criteria for Gypsy, Traveller and Travelling Showpeople accommodation, in line with the Gypsy and Traveller Accommodation Assessment. Sites must be well designed with enough space for caravans, day rooms and landscaping, have safe access to services such as shops, schools and healthcare, and respect the size of the nearest settled community without dominating it. They must avoid flood risk and harm to the environment, and be serviceable with water, utilities and sewerage. For Travelling Showpeople, the need for mixed-use yards and storage space will also be considered.
The human version (we wrote this, not the council)This policy protects water quality in rivers, canals, lakes, reservoirs and groundwater. Development will only be supported where it does not harm surface or underground water bodies, and proposals should look for chances to improve water quality. Schemes affecting designated wildlife sites or water catchments must show how quality will be maintained and pressure on the wastewater network reduced. Extra safeguards apply in Drinking Water Safeguard Zones and Source Protection Zones, including restrictions on soakaways and infiltration drainage, and a Water Framework Directive assessment is required where development could harm a waterbody.
The human version (we wrote this, not the council)This policy requires development to conserve and enhance watercourses and their corridors, including their biodiversity, landscape, flood management and recreation value. Culverting or hard engineering of watercourses is not supported, and opportunities to restore rivers to a more natural state should be actively pursued. Development next to a watercourse must keep a natural buffer of at least 10 metres from the top of the bank, with no lighting, rising to at least 15 metres for chalk streams such as the River Chess and River Misbourne. Chalk streams are a globally rare habitat with stronger protection.