The human version (we wrote this, not the council)This policy supports the extension of the Martin's Yard employment area in Northampton for employment purposes to meet local demand. The extension is restricted to the area shown in Figure 17. A Transport Assessment must test the existing highway and access. Ecological and green infrastructure enhancements and net biodiversity gains are required, given the site lies in the Brampton Valley Arm, immediately south of the Kingsthorpe Local Nature Reserve. A landscape barrier is needed between the employment area and the residual land. Applications need a flood risk assessment, sustainable drainage and improved water quality.

The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.

The human version (we wrote this, not the council)This site allocation covers land south of Junction 15 of the M1, allocated for 68 hectares of strategic warehousing. A masterplan covering the whole site must be prepared before any planning application. Two years of overwintering bird surveys are needed, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. The design must reduce the effect of building scale and massing on local character. A strategic landscape assessment is required, respecting the setting of the Courteenhall registered park and garden. A detailed heritage impact assessment, agreed with Historic England, and a detailed ecological assessment are also required.

The human version (we wrote this, not the council)This section introduces the Daventry chapter. Daventry grew from about 4,000 people in 1950 to around 28,000 in 2021 after being used for overspill development from Birmingham. The chapter describes regeneration schemes such as the Abbey Retail Park, the iCon building and the Arc cinema, and green features such as the Country Park and Borough Hill. It covers housing, including 450 homes under construction at Micklewell Park and 4,000 homes allocated at Daventry North East. A 2022 study found town centre vacancy of 13.1%, below the national average of 14.1%. The strategy supports continued growth.

The human version (we wrote this, not the council)This section introduces Brackley, a historic market town of about 16,200 people close to the A43, M1 and M40. It notes that 1,717 homes were built in the town up to 31 March 2026, an average of 114 a year. Brackley North, which provided for up to 1,380 dwellings, was completed in 2023. The 9.5ha of employment land at Brackley East has been built and is occupied. The Brackley Business District is the focus for new employment. The town centre had a vacancy level of 10.9% in 2022, against a national average of 14.1%. The strategy supports continued growth in line with the town's role in the settlement hierarchy.

The human version (we wrote this, not the council)This section introduces Towcester, a market town with a population of around 11,500 (census 2021), nearly 30% growth over 20 years. It sits at the crossroads of the A5 and A43, close to the M1 and M40. The town has built 2,311 homes up to 31 March 2026, an average of approximately 154 a year. Wood Burcote Court was completed in 2024. At Towcester Vale, reserved matters consent covers 2,116 dwellings, with 1,389 completed. The town centre vacancy level of 9% in 2022 is below the national average of 14.1%. The strategy supports continued growth in line with the town's role in the settlement hierarchy.

The human version (we wrote this, not the council)This site allocation covers Land at Woolgrowers Field, Towcester. It is allocated for mixed employment development, with a variety of types sought. A masterplan is required before any planning application. Uses are a mix of E(g), B2 and B8 with supporting uses. Access will be from the A5 and/or the Greens Norton Road. The policy requires good public transport access, a transport assessment and travel plan, and new footpaths and cycleways with safe crossing points on the A43. It also requires heritage, archaeological and strategic landscape assessments, and an assessment of compliance with the South Northamptonshire Employment Site Allocations Development Brief (October 2022).

The human version (we wrote this, not the council)This site allocation covers Land at Tiffield Lane, Towcester. It is allocated for mixed employment development, with a variety of types sought. A masterplan is required before any planning application. Uses are a mix of E(g), B2 and B8 with supporting uses. Access will be by a new roundabout at the A43 and Northampton Road (Hulcote Turn), and the layout must allow the closure of the central reservation turn at the Tiffield Lane junction. The policy also requires public transport access, a transport assessment, new footpaths and cycleways, heritage, archaeological and landscape assessments, protection of the Green Infrastructure Corridor crossing the site, and compliance with the Development Brief (October 2022).

The human version (we wrote this, not the council)This section explains the case for growth at Long Buckby Station, on the Northampton Loop line of the West Coast Main Line. A new settlement of 1,280 to 5,000 homes was considered in 2021 but not taken forward in 2024. Higher housing need has since led to this location being identified. The Local Transport Plan, adopted March 2025, lists station improvements and platform lengthening by 2030. Growth will provide approximately 1,000 homes and about four hectares of employment land by Three Bridges Road. Part of the site is in a Mineral Safeguarding Area, and a more detailed archaeological desk based assessment is recommended.

The human version (we wrote this, not the council)This section sets out the approach to rural areas, which are home to around a third of the area's population. It keeps the three tier rural settlement hierarchy from the WNJCS: Primary Service Villages, Secondary Service Villages and Other Villages, plus Small Settlements and Hamlets. Villages were scored on services, facilities and public transport, then reviewed. Development is directed to settlement confines, and a single confines method now applies across West Northamptonshire. Development outside the confines is allowed only in prescribed cases, such as a lack of a five year housing land supply, a Housing Delivery Test result below 75%, or a single self-build plot with a local connection.

The human version (we wrote this, not the council)This policy lists the Small Settlements and Hamlets, such as Adstone, Alderton, Althorp and Woodend. These places have extremely limited services and facilities. Proposals for development in them will be judged against Policy R5 (Open Countryside), which sets out the types of acceptable development in the open countryside. This is intended to keep a pattern of sustainable development that reflects the nature and character of these settlements.

The human version (we wrote this, not the council)This policy sets the housing requirement for West Northamptonshire for the plan period 2026 to 2043 at 42,704 homes. The plan will also provide an additional 5% to ensure choice and competition in the market for land. These homes will be delivered through allocations made in this Plan, other policies in this Plan that provide for new homes, existing commitments, and allocations in Neighbourhood Development Plans.

The human version (we wrote this, not the council)This policy sets affordable housing requirements for sites of 10 or more dwellings. The rate is 10% in the Northampton and Daventry urban areas and 35% in the Towcester and Brackley urban areas and rural areas. Lower levels are acceptable only where evidence of viability or other constraints is agreed, and developments over 500 units should include an upward only review clause. Homes should be provided on site, designed to be indistinguishable from market homes, and owned and managed by a registered provider. They must stay affordable in perpetuity. The policy also supports community led schemes backed by a local housing needs survey.

The human version (we wrote this, not the council)This policy supports Build to Rent schemes in Northampton, and in other places where an identified need is shown. Applicants must show that all units are self-contained and let separately, and that at least 20% of dwellings are affordable private rent. Those homes must be offered at a minimum 20% discount to local market rents in perpetuity, and be broadly representative of the overall mix. Units must be in single ownership with a professional on-site management scheme. The homes must stay as build to rent for at least 15 years. A planning condition will require tenancies of 3 or more years to be offered.

The human version (we wrote this, not the council)This policy covers self-build and custom build homes. On sites of more than 100 dwellings, 5% of plots should be provided as serviced plots. Plots left vacant 12 months after roads and utilities are installed can revert to other housing if marketing shows no interest. Serviced plots are also supported on other allocated or windfall sites, unless supply would exceed demand. Single self-build plots immediately adjoining the confines of Primary, Secondary and Other Villages are supported where a local connection is shown and the first occupant is the applicant. Outline applications for more than one dwelling need a design code covering listed matters.

The human version (we wrote this, not the council)This policy covers Houses in Multiple Occupation. In Northampton, proposals are supported if fewer than 10% of dwellings within a 50m radius are HMOs, and they would not create a continuous frontage of two or more HMOs or sandwich a single self-contained home between two HMOs. Across West Northamptonshire, proposals must show they protect amenity and living standards, meet the Council's space standards, and provide car parking, secure cycle storage, refuse storage and external amenity space. They must not increase flood risk, and ground floor bedrooms are not allowed where flooding would put occupants at risk.

The human version (we wrote this, not the council)This section introduces the economic growth chapter. It describes West Northamptonshire's central location on the M1, A14 and M6, and its place in the Oxford-Cambridge Growth Corridor. It notes an estimated 224,000 jobs in 2023, up 23,000 since 2015. It lists key employment areas, including the Northampton Waterside Enterprise Zone, DIRFT and Silverstone. It says the HENA projects between 30,800 and 32,200 extra jobs from 2025 to 2043. It sets land needs of about 15.8 ha for offices and research, 104 ha for local industrial and warehousing, and at least 484 ha for strategic industrial and warehousing.

The human version (we wrote this, not the council)This policy keeps existing and allocated employment sites and industrial estates in employment use (Classes E(g), B2 and B8). Proposals should show regard to the Economic Growth Strategy 2025. New employment uses and expansions are supported if they do not harm neighbours' amenity. A net loss of employment will only be supported with evidence that the use is no longer needed, no longer viable, or in clear conflict with adjoining uses. Other uses must meet tests, including at least 12 months of active marketing. New employment development outside defined areas is supported only where it is well related to an existing area and no capacity exists there.

The human version (we wrote this, not the council)This policy supports development that sustains and enhances the rural economy by creating or safeguarding jobs and businesses. Proposals must be of an appropriate scale, avoid unacceptable harm to residential amenity, respect the rural area's character and protect the best and most versatile agricultural land. Acceptable types include the re-use of farm buildings under Policy R5, farm diversification, small-scale tourism and visitor accommodation, expansion of small businesses in their existing locations, agriculture, forestry, fisheries and equestrian use, and small-scale employment to meet local needs. Proposals that value the natural and historic environment as an asset are also acceptable.

The human version (we wrote this, not the council)This policy covers development alongside canals. At Primary and Secondary villages in the settlement hierarchy, new canalside development is supported where it provides active canal frontages with recreational or economic uses and has regard to the canal's use, accessibility and safety. Away from these villages, canal-related development may be acceptable where it needs to be near the canal, protects the openness and rural character of the countryside, does not harm the area or neighbours, keeps public access to the canal, and does not affect road safety. Adequate parking must be provided on site.

The human version (we wrote this, not the council)This policy sets the retail hierarchy and directs shops, leisure and other main town centre uses to centres first. The hierarchy runs from Northampton as the regional town centre, through Daventry, Brackley and Towcester, to the district centres of Weston Favell and Kingsthorpe, then local centres, villages and shops. Outside town centres, a change of use to retail or similar uses of 280 sq m gross or more needs a retail impact assessment. Vacant units can change use after 12 months of marketing. Active ground floor frontages in Primary Shopping Areas, and neighbourhood centres and local parades, are protected.

The human version (we wrote this, not the council)This policy supports moving the vehicle recycling facility, to help regenerate the Daventry South East Gateway. A proposal is supported where the new site meets all of four criteria. There must be no significant adverse impact on the local landscape and heritage assets. There must be good access to the strategic highway network. There must be no significant adverse impact on the amenity of existing residents. There must be no harm to the form, character and setting of an existing settlement.

The human version (we wrote this, not the council)This policy requires major developments to show how they support education, skills and training outcomes in line with the West Northamptonshire Economic Growth Strategy. This must cover both the construction and operational phases, including apprenticeships and training, and work with the West Northamptonshire Employment Support Service and local education providers to recruit locally and build skills for priority sectors. Where on-site delivery is not feasible, financial contributions will be sought under the Infrastructure and Developer Contributions SPD. New or expanded education and training facilities are supported in accessible locations served by sustainable transport.

The human version (we wrote this, not the council)This site allocation sets aside 10 ha at Shacks Barn, Whittlebury, for mixed employment development. A masterplan for the whole site is needed before any application. Uses will be E(g), B2 and B8, with supporting uses only if complementary, and an independent market assessment is required. Access uses the existing access only, with new footpaths and cycleways, public transport links and a Transport Assessment and travel plan. A heritage impact assessment is needed because of the Lordsfield Farm scheduled monument. Archaeological, landscape and visual, and crime prevention assessments are also required.

The human version (we wrote this, not the council)This site allocation sets aside 50 ha south of Junction 16 of the M1, Northampton, for strategic B8 warehousing and logistics. A masterplan is needed before any application. Proposals must follow minerals extraction and restoration policies, use low-carbon design, offer training, and provide public transport and active travel. Landscape buffers must separate the site from Nether Heyford and Upper Heyford. Applicants must show no adverse effect on the nearby SSSI, and deliver biodiversity net gain. Heritage, noise, lighting, transport, flood risk and crime assessments are required. Two years of overwintering bird surveys must check links to the Upper Nene Valley Gravel Pits Special Protection Area.

The human version (we wrote this, not the council)This site allocation covers land east of the M1 for strategic B8 warehousing and logistics, as an extension of the Daventry International Rail Freight Terminal (DIRFT). A masterplan is needed before any application. Proposals must use low-carbon design, offer training, and provide for public transport and active travel. Landscape buffers must protect Crick, Clay Coton, Lilbourne and Yelvertoft. Heritage, landscape, noise, lighting, transport, flood risk and crime assessments are required. All vehicle access must go through the existing DIRFT site west of the M1, and drainage should maximise Sustainable Drainage Systems.

The human version (we wrote this, not the council)This policy supports Silverstone as an international venue for motorsport and high-performance innovation. Growth in advanced engineering and automotive technology is encouraged, along with education, business and skills work linked to motorsport. Proposals should show economic benefits, inward investment and collaboration between business, academia and the public sector. Development should complement existing uses and support the visitor economy, and must follow the Plan's placemaking, design and sustainability policies. Proposals must show functional links to Towcester and Brackley, and address cross-boundary infrastructure needs, working with Buckinghamshire Council.

The human version (we wrote this, not the council)This policy supports high quality sustainable strategic B8 and logistics development at Northampton Gateway. Ancillary uses are supported if evidence shows they are needed to support the site and its employees. Proposals must integrate low-carbon and renewable energy in design and construction, offer good quality training, and ensure transport connectivity, including public transport and cycling. Particular attention goes to better links with Northampton town and Roade village. Proposals must also set out how the natural environment, such as parkland and trees, will be maintained and managed.

The human version (we wrote this, not the council)This policy protects the special qualities of the Special Landscape Areas shown on the Policies Map. The Council will consider impacts, including cumulative ones, and resist proposals that would cause harm that cannot be successfully mitigated. Development in or affecting these areas should pay particular attention to design, materials, siting and land use, be informed by the Special Landscape Area studies, and help conserve, enhance or restore the area's character. Where required, a landscape and visual impact assessment must inform the design, show how impacts are minimised, and show that harm can be mitigated by suitable landscape treatment.

The human version (we wrote this, not the council)This policy requires, unless exempt, a 10% net gain in biodiversity as required by the Environment Act 2021. It should be delivered by enhancing and creating habitats, following the biodiversity net gain hierarchy, with on-site provision preferred unless off-site gives a better outcome. Exempt development must still provide suitable biodiversity enhancements. Applications subject to mandatory net gain must submit a draft Biodiversity Net Gain Plan covering the hierarchy, baseline value, pre and post-development values, how 10% will be reached, and contribution to the Local Nature Recovery Strategy. Off-site gain should follow that Strategy. Development mainly aimed at nature is supported.