Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Northampton

73 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy covers trees and hedgerows in development. Proposals should integrate existing trees, woodland and hedgerows, and unavoidable losses need replacement planting for each tree lost. Retained trees must be protected during works, and planting should use native species of local provenance. Loss of ancient woodland and veteran trees is not permitted unless the benefits clearly outweigh the loss. All new development must meet the Urban Greening Factor standard to help reach average green cover of 40% and avoid net loss of urban green cover. Major commercial development needs a score of at least 0.3, residential at least 0.4, and 0.5 on greenfield land.

The human version (we wrote this, not the council)This policy supports proposals that protect and enhance existing green and blue infrastructure and create more. New developments must protect, manage, maintain and connect existing assets. Major housing and commercial developments must deliver or contribute to green and blue infrastructure projects in proportion to the development, with a site-specific strategy or plan showing connections beyond the site. Proposals should show a positive contribution to projects in existing Green Infrastructure Plans and the National Green Infrastructure Framework. Green and blue infrastructure for major developments should be managed, maintained and monitored for at least 25 years.

The human version (we wrote this, not the council)This policy covers green and blue corridors. They will be managed and enhanced by building existing and future networks into proposals, securing contributions for their creation and management, and delivering long-term management strategies for the sub-regional and local networks. Measures to enhance or provide new green infrastructure should be sustainable, help adapt to climate change through flood risk management and carbon storage, be of the highest quality in appearance, access and biodiversity, reflect local character with native and climate-appropriate species, and be supported by long-term management strategies such as the Local Nature Recovery Strategy.

The human version (we wrote this, not the council)This policy covers development in the Nene Valley Nature Improvement Area. Development there will be permitted where it enables the functioning of the Nature Improvement Area and, where appropriate, contributes to opportunities for habitat creation or habitat management within it. The policy sets two tests. The first is that the development enables the area to function. The second is that, where appropriate, it adds to habitat creation or habitat management in the area. The policy links to Plan objectives 1 to 7.

The human version (we wrote this, not the council)This policy protects and enhances the natural and cultural environment of river corridors and their tributaries. Proposals must show they understand the river's importance for biodiversity and natural capital. Development likely to harm a watercourse's functions and setting will not be permitted. In previously undeveloped areas, an undeveloped buffer of at least 10m from the top of the bank must be kept on both sides, planted with native species, with no new domestic gardens. A working methods statement and a long-term Landscape Ecological Management Plan are required. Culverting and hard bank revetment are not supported, de-culverting is supported, and groundwater must not be harmed.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.

The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.

The human version (we wrote this, not the council)This policy sets priorities for strategic connections, to be achieved by working with transport providers. For rail, it seeks faster and more frequent services between London, Birmingham and airports via Northampton, extra services, a multi-transport interchange in the Milton Keynes and Northampton areas, better links to Aylesbury and Bletchley, and more rail freight. For road, it seeks A45 traffic management, A43 improvements, a step-change in bus services including to Silverstone, better bus links to Northampton station, and more electric buses. It also supports using the canal network for freight.

The human version (we wrote this, not the council)This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.

The human version (we wrote this, not the council)This section introduces the infrastructure chapter. It says infrastructure must be delivered alongside homes and jobs, guided by the Infrastructure Delivery Plan and its Phase 1 and Phase 2 reviews. It covers national policy, school places and green infrastructure. It lists infrastructure types in the plan, such as transport, healthcare, education, utilities and digital. Funding comes from Section 106, Section 278, the Community Infrastructure Levy and SAMM fees. The SAMM zone of influence around the Upper Nene Valley Gravel Pits SPA extends from 3km to 5.9km. The section also summarises transport and social infrastructure.

The human version (we wrote this, not the council)This section lists the Local Green Spaces designated by village, as defined in paragraph 106 of the NPPF. Each village name is followed by the document that designated the spaces: a Neighbourhood Development Plan, the Daventry Settlements and Countryside Local Plan Part 2, or the South Northamptonshire Local Plan Part 2. The list includes village greens, churchyards, allotments, playing fields, recreation grounds and pocket parks. Villages and towns shown include Arthingworth, Barby, Boughton, Brixworth, Crick and Daventry.

The human version (we wrote this, not the council)This section lists the strategic policies of the Plan for the purposes of neighbourhood plans, grouped by chapter. They include the spatial strategy SP1, placemaking policies PL1, PL6 and PL7, the spatial strategies for Northampton, Daventry, Brackley and Towcester, and growth at Long Buckby, and rural policies R1 to R6. Homes policies HO1, HO7 and HO11 are listed. From the economic chapter it lists EC1 and EC2. From the environment chapter it lists EN1, EN6, EN7, EN9 and EN10. TR1, TR2 and IN1 complete the list.

The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.

← Back to the plan search