The human version (we wrote this, not the council)This policy sets conditions for offices, taxi ranks and other operational space for taxi and private hire businesses, including minicabs. Such development is supported only where it is suitably located, with priority given to sites in or near town centres and at or near stations. It must not cause a harmful overconcentration of similar uses, harm amenity or the highway network, or harm walking routes and cycleways. It must be of high-quality design, and offices and ranks must be accessible and safe in operating hours, using lighting and CCTV. On-site parking for operational use must have active charging points for all designated taxi spaces.
Health, schools & community
Health and wellbeing, GP and hospital capacity, schools, sport, open space, play areas and community buildings.
301 sections of the plan, in document order.
The human version (we wrote this, not the council)This section covers the Long Marston Airfield New Community, a 697-hectare site for at least 10,300 homes, with a minimum of 4,500 built by 2050. It also provides 15 hectares of employment land, 21 Gypsy and Traveller pitches, four primary schools, a secondary school with land reserved for a second, a district centre, three local centres and a new country park. Early phases of 500 homes can start first, but wider development depends on the Stratford-upon-Avon Bypass opening, expected in 2035. Land is safeguarded for a railway station.
The human version (we wrote this, not the council)This policy protects the safety and operation of aerodromes. Development will not be permitted where it would harm the operational integrity or safety of safeguarded civil and military aerodromes or their navigation aids, radio aids or telecommunications systems. The Council will consult the Airport Operator on wind turbine proposals in the Heathrow Airport Safeguarding Zone, and will consult the Elstree Airport Licensee on relevant proposals. Development near Elstree is permitted only if it does not compromise the Aerodrome's operational integrity and general safety and is compatible with its continued use. The explanation describes Elstree Aerodrome as a privately operated airfield licensed by the Civil Aviation Authority, but not officially safeguarded.
The human version (we wrote this, not the council)This section sets out proposal BID.1, a mixed-use urban extension north and east of Bidford-on-Avon delivering at least 2,225 homes between 2033 and 2050 across around 221 hectares. It includes two primary schools, land for a secondary school, an early years facility, a local centre, 11 hectares of employment land and 8 Gypsy and Traveller pitches. A new link road with a bridge over the River Avon will cut traffic through the village centre, and open space will keep a green gap between Bidford and neighbouring Broom.
The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.
The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.
The human version (we wrote this, not the council)This policy requires development to deliver high-quality green infrastructure, the network of green spaces, trees, waterways and other natural features that benefits wildlife, flood management, health and recreation. Residential schemes of more than ten dwellings, or over 1,000 square metres of floorspace, must meet Natural England's Accessible Green Space standards and submit a Green Infrastructure Statement. These standards aim for good quality green space within a 15-minute walk of home. Green infrastructure must be managed for at least 30 years after completion, with arrangements to secure its management in perpetuity.
The human version (we wrote this, not the council)This section describes proposal BIT.1, land at Park Farm west of Bishop's Tachbrook. The 41-hectare site will deliver at least 655 homes between 2030/31 and 2037/38, plus 2.2 hectares of land for a possible two-form entry primary school, a community hall site and a small local centre. A significant green buffer will protect the setting of the Grade I listed Warwick Castle parkland. A contaminated land assessment is needed for the former quarry and landfill in the northern part of the site.
The human version (we wrote this, not the council)This policy resists the loss of existing accessible green space, including allotments, and the transfer of public green infrastructure into private gardens. Loss will be refused unless an assessment against Natural England's standards proves the space is surplus, the land makes no positive contribution to appearance, recreation or wildlife, it contains no priority habitats or species, and there is no cumulative harm to the local area. Any green space lost must be replaced with equivalent or better provision within the catchment of the space lost.
The human version (we wrote this, not the council)This section sets out the context, vision and key spatial objectives for Borehamwood. It describes Borehamwood as Hertsmere's largest settlement, principal town and economic centre, with strong rail and road links and an internationally known film and television industry. The Plan makes it the main focus for housing-led growth and regeneration, using a brownfield-first approach and coordinated, rather than piecemeal, redevelopment. The vision includes a regenerated town centre, a stronger Shenley Road, protection of the studios cluster, and a network of connected neighbourhoods. It lists eleven key spatial objectives covering housing, town centre vitality, film and creative industries, movement, design, green infrastructure and infrastructure delivery.
The human version (we wrote this, not the council)This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.
The human version (we wrote this, not the council)This policy protects trees, woodlands, orchards and hedgerows. There is a presumption to refuse development that would cause the loss or deterioration of ancient or veteran trees, ancient woodland, traditional orchards or important native hedgerows, except in exceptional circumstances with clear overriding public benefit. Minimum natural buffers are required, including fifty metres for ancient woodland, at least twenty-five metres for other woodland and five metres either side of hedgerows. Where trees could be affected, a tree survey to British Standard 5837 is required, and acceptable losses must be replaced with locally appropriate species.
The human version (we wrote this, not the council)This section summarises the Infrastructure Delivery Plan (IDP), which sets out the key infrastructure needed to support growth. The IDP is a live document that will be updated. The plan proposes a total of 14,700 dwellings up to 2045, including a new neighbourhood of 4,900 homes at Land North of Southend. A table splits needs between the existing urban area and Bournes Green. Needs include road, bus, rail, walking and cycling upgrades, community facilities, and health and emergency services. The existing urban area needs about 1,000 extra early years places. Bournes Green would need about 450 early years places, two primary schools and one secondary school.
The human version (we wrote this, not the council)This section introduces the infrastructure chapter. It says infrastructure must be delivered alongside homes and jobs, guided by the Infrastructure Delivery Plan and its Phase 1 and Phase 2 reviews. It covers national policy, school places and green infrastructure. It lists infrastructure types in the plan, such as transport, healthcare, education, utilities and digital. Funding comes from Section 106, Section 278, the Community Infrastructure Levy and SAMM fees. The SAMM zone of influence around the Upper Nene Valley Gravel Pits SPA extends from 3km to 5.9km. The section also summarises transport and social infrastructure.
The human version (we wrote this, not the council)This policy sets out what development must do in or near the Colne Valley Regional Park, a park of over 10,000 hectares in the east of the county established in 1967. Development should maintain and enhance the park's landscape, waterways and biodiversity, provide countryside recreation that is accessible to all, and improve walking, wheeling and cycling routes. It should also support the rural economy, encourage community participation and help reduce pollution to the River Colne. A possible extension of the park to cover Fulmer parish is being considered.
The human version (we wrote this, not the council)This section sets out proposal BIT.3, 122 hectares north-west of Bishop's Tachbrook delivering at least 1,720 homes on about 46 hectares between 2028/29 and 2040/41. Around 74 hectares becomes public open space, including a 40-hectare extension to Tachbrook Country Park to keep a permanent green gap south of Leamington. The scheme includes a community hub with possible shops and a GP surgery, land for a two-form entry primary school, and funding towards secondary education. Green buffers must keep Bishop's Tachbrook visually separate from Leamington and Warwick.
The human version (we wrote this, not the council)This policy requires development in Borehamwood to contribute to a safer, more accessible and more sustainable movement network. Proposals should prioritise walking, cycling, wheeling and public transport, and provide safe, direct routes to Elstree & Borehamwood railway station, Shenley Road, schools, parks, employment areas and local centres. They should improve east-west and north-south connections across barriers such as major roads and the railway, improve the station gateway, and provide high-quality cycle parking. Parking, servicing and construction impacts must not harm pedestrian safety. Major development must show how its layout supports reduced car dependency. Development that prejudices identified walking, cycling, public transport or station gateway improvements will not be supported.
The human version (we wrote this, not the council)This section sets out the parking standards for new development. For homes, there are minimum car parking standards that differ between Southend Central and the rest of the city. A flat needs 0.5 spaces in Southend Central and 0.75 spaces elsewhere, and a house needs 1 space. Houses with 4 or more bedrooms need 1.5 spaces outside Southend Central. Lower provision would need to be justified. For other uses, such as shops, offices, hotels and schools, the tables set maximum car parking standards. A further table sets minimum cycle parking standards, including 1 secure covered space per dwelling unless there is a garage or secure area.
The human version (we wrote this, not the council)This policy requires development in Borehamwood to protect, enhance and extend the town's green and blue infrastructure network. Proposals should protect existing parks, trees, hedgerows, green corridors, habitats and watercourses, provide new or better green infrastructure to support growth, and improve walking and cycling links to the countryside. Street trees, sustainable drainage and urban greening should be part of the design. Development should improve access to open space where there are gaps, and keep the landscape setting of Borehamwood without merging with nearby settlements. Edge-of-town development must be landscape-led with a clear, defensible and attractive edge. Development that fragments the network or harms landscape features will not be supported.
The human version (we wrote this, not the council)This policy explains that most development in the Green Belt is inappropriate and will be refused unless very special circumstances apply. Exceptions include buildings for agriculture and forestry, facilities for outdoor sport and recreation, replacing or extending existing buildings, limited infilling within identified villages, and affordable housing on rural exception sites. Infill plots and buildings must be comparable in size to typical plots and houses in the village. The plan has also reviewed the Green Belt to identify Grey Belt land, but this policy applies to all Green Belt land.
The human version (we wrote this, not the council)This section describes proposal HEN.1 at Henley-in-Arden, a 125-hectare masterplanned development of at least 2,084 homes, largely on the golf club land, delivered from 2029/30 to 2044/45. It includes 3.3 hectares of employment land, a two-form entry primary school, expansion of the secondary school with a new sixth form, 9 Gypsy and Traveller pitches, and a new country park at Beaudesert Mount. A link road from the A3400 to the A4189, including a new rail bridge, will let through traffic bypass the town centre. The site will be released from the Green Belt.
The human version (we wrote this, not the council)This policy protects the Chilterns National Landscape, which covers 27% of the council area and has the highest status of landscape protection. Development within it should be limited in scale, and development in its setting must be sensitively located and designed. All proposals must take a landscape-led approach, conserve the area's special qualities and follow the Chilterns Building Design Guide. Major developments will be refused unless exceptional circumstances are shown to be in the public interest, and must be supported by a Landscape and Visual Impact Assessment.
The human version (we wrote this, not the council)This section sets out the framework for delivering and monitoring the Local Plan. For each strategic policy it lists aims, who will deliver them, how, and the key indicators and data used to track progress. Targets include 14,700 additional homes by 2045, with 4,900 at Bournes Green New Neighbourhood, including 45% affordable homes. Others include 68,400sqm of employment floorspace by 2045, and 20% affordable housing on sites of 10 to 49 dwellings and 30% on sites of 50 or more. It also sets a city-wide target of 15% tree canopy cover and at least 10% biodiversity net gain. Further indicators cover health, heritage, flooding, transport and the airport.
The human version (we wrote this, not the council)This policy manages noise, air quality and contaminated land. Noise-generating developments must include attenuation measures, and noise-sensitive uses such as homes, schools and hospitals will not be supported where users would suffer from existing noise. Developments that may worsen air quality must submit an air quality impact assessment, particularly within Air Quality Management Areas, and road traffic is identified as the county's main source of air pollution. Development on land that may be contaminated requires an assessment, with remediation normally completed before first occupation.
The human version (we wrote this, not the council)This section sets out proposal KEN.1, land south of Kenilworth delivering at least 776 homes on 60 hectares between 2029/30 and 2036/37, at a density of at least 35 homes per hectare. A significant green edge will maintain separation between Kenilworth and Leek Wootton. A spine road linking Rouncil Lane and Warwick Road must come early in the development. A buffer to the north-west protects sightlines from Kenilworth Castle, and the site sits in a mineral safeguarding area for sand and gravel.
The human version (we wrote this, not the council)This policy controls artificial light at night to protect wildlife, dark skies and local character. External lighting must be the minimum needed for safety and security, with light spill, glare and impact on the night sky minimised. Dark corridors, such as watercourses and hedgerow networks, must be protected because species like bats depend on them. A mitigation hierarchy applies: avoid lighting in sensitive areas first, then minimise it, then compensate. All lighting should have a clear purpose, be no brighter than necessary, use warmer colours where possible and be switched off when not needed.
The human version (we wrote this, not the council)This section covers proposal LEA.1 at Blackdown, north of Leamington Spa. Some 72 hectares will be released from the Green Belt for at least 1,043 homes on about 37 hectares, plus roughly 35 hectares of public open space, delivered between 2031/32 and 2041/42. The scheme includes a two-form entry primary school, a community hub and safeguarded land for expanding North Leamington School. Land may also be needed for a future Park and Ride, and the site must contribute to the Kenilworth to Leamington cycle route.
The human version (we wrote this, not the council)This policy requires all new developments, except householder applications, to follow a vision-led approach to transport that prioritises walking, wheeling, cycling and public transport before car use. Larger sites must provide safe walking and cycling routes, including safe routes to schools within statutory walking distance (2 miles for under 8s, 3 miles for over 8s), and fund new or improved bus services for at least five years. Requirements also cover travel plans, car clubs, mobility hubs, and changing and shower facilities in non-residential buildings over 2,500 square metres. Developments must not have an unacceptable impact on highway or rail safety.
The human version (we wrote this, not the council)This section lists the Local Green Spaces designated by village, as defined in paragraph 106 of the NPPF. Each village name is followed by the document that designated the spaces: a Neighbourhood Development Plan, the Daventry Settlements and Countryside Local Plan Part 2, or the South Northamptonshire Local Plan Part 2. The list includes village greens, churchyards, allotments, playing fields, recreation grounds and pocket parks. Villages and towns shown include Arthingworth, Barby, Boughton, Brixworth, Crick and Daventry.
The human version (we wrote this, not the council)This section describes proposal LEA.2 at Milverton, the second urban extension north of Leamington Spa. Some 76 hectares leave the Green Belt for at least 974 homes on about 38 hectares, with 38 hectares of open space, delivered between 2032 and 2045. It includes a food store of up to 15,000 sq ft, around 2 hectares of employment land, land for a possible hospital expansion, and a two-form entry primary school. A landscape-led approach is required given the site's sensitive position between Kenilworth and Leamington.