Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Site allocations

The specific sites the plan proposes to allocate for development, and what each allocation requires.

288 sections of the plan, in document order.

Policy NESS012

Winslow

pp. 149–157

The human version (we wrote this, not the council)This allocation covers a 411.4-hectare site around Winslow for a minimum of 9,370 homes, with 3,650 in the plan period, plus 15 Gypsy and Traveller pitches, around 16 hectares of employment land and 3,500 sqm of town centre uses. It requires four primary schools, two secondary schools, new link roads and integration with East West Rail, whose safeguarded land must not be built on. Green gaps must prevent merging with Great Horwood. The employment land targets high-value sectors, helped by the new station and the Oxford to Cambridge growth corridor.

The human version (we wrote this, not the council)This site allocation covers land south of Grange Park in Northampton, allocated for residential development. A masterplan agreed by the Council is required. Proposals must provide approximately 850 dwellings, open space, sports and education provision, and a sustainable transport network. They must also provide structural greenspace and wildlife corridors, and address impacts on the Upper Nene Valley Gravel Pits Special Protection Area. Healthcare and transport contributions are required. Heritage and landscape assessments must show that the rural setting of nearby historic villages is preserved, separation between settlements is maintained, and coalescence is avoided. TPO trees, hedgerows and the stream corridor must be kept.

The human version (we wrote this, not the council)This policy supports the extension of the Martin's Yard employment area in Northampton for employment purposes to meet local demand. The extension is restricted to the area shown in Figure 17. A Transport Assessment must test the existing highway and access. Ecological and green infrastructure enhancements and net biodiversity gains are required, given the site lies in the Brampton Valley Arm, immediately south of the Kingsthorpe Local Nature Reserve. A landscape barrier is needed between the employment area and the residual land. Applications need a flood risk assessment, sustainable drainage and improved water quality.

The human version (we wrote this, not the council)This site allocation covers Horizon House, St Peter's Way in Northampton. Proposals to bring Horizon House back into office use, including extensions, are supported, with around 25,000 sq. m of commercial floorspace. Offices should be modern and include shared workspaces. Refurbishment must be sensitive to its heritage status as the former Corporation Gas Works offices and to nearby assets, including St Peter's Church, a Grade I listed building. Proposals must minimise inactive frontages, provide accessible greenspace, integrate the River Nene, improve walking, cycling and riverside safety, and contribute to transport mitigation. A flood risk assessment is needed.

The human version (we wrote this, not the council)This section covers open space allocations. Public open spaces allocated in the 2014 Site Allocations document are carried over into this plan, and three new allocations are added: the open spaces linked to the two Warner Bros. Studios sites and the Suitable Alternative Natural Greenspace serving housing site H34 west of the Kings Langley Estate. Housing developments must contribute to open space and children's play space where the scale of development justifies it. The council will update its open space study after adoption, which may lead to further allocations.

The human version (we wrote this, not the council)This site allocation covers land south of Junction 15 of the M1, allocated for 68 hectares of strategic warehousing. A masterplan covering the whole site must be prepared before any planning application. Two years of overwintering bird surveys are needed, and impacts on the Upper Nene Valley Gravel Pits Special Protection Area must be addressed. The design must reduce the effect of building scale and massing on local character. A strategic landscape assessment is required, respecting the setting of the Courteenhall registered park and garden. A detailed heritage impact assessment, agreed with Historic England, and a detailed ecological assessment are also required.

The human version (we wrote this, not the council)This section sets out the education allocations. A new secondary school site is allocated at Carpenders Park Farm, Oxhey Lane (ED1), able to accommodate a school of up to 10 forms of entry serving Carpenders Park, South Oxhey, Eastbury and parts of neighbouring boroughs. Land including and adjoining The Reach Free School (ED2) is allocated for a new secondary school or a four form entry expansion, and a primary school site at Woodside Road, Abbots Langley (ED3) is carried over from 2014. Identified school sites will be safeguarded for educational use.

Policy NESS013

Turweston

pp. 158–164

The human version (we wrote this, not the council)This allocation sets out a 143-hectare site east of Brackley, next to the county boundary, for around 2,890 homes, plus 5 Gypsy and Traveller pitches, about 2 hectares of employment land and 2,500 sqm of town centre uses. It requires two primary schools, contributions to secondary education, improvements to the A422 corridor and buffers to HS2, Ancient Woodland and the sewage treatment works. Development must conserve the setting of Turweston Conservation Area and manage flood risk from the River Great Ouse.

The human version (we wrote this, not the council)This section introduces the Daventry chapter. Daventry grew from about 4,000 people in 1950 to around 28,000 in 2021 after being used for overspill development from Birmingham. The chapter describes regeneration schemes such as the Abbey Retail Park, the iCon building and the Arc cinema, and green features such as the Country Park and Borough Hill. It covers housing, including 450 homes under construction at Micklewell Park and 4,000 homes allocated at Daventry North East. A 2022 study found town centre vacancy of 13.1%, below the national average of 14.1%. The strategy supports continued growth.

The human version (we wrote this, not the council)This site allocation is for 770 dwellings East of Solihull, an urban extension close to Solihull Town Centre. The site sits behind homes on the northern side of Hampton Lane, with the Grand Union canal as its northern boundary and Field Lane to the east. Development should protect the setting of the Grade II listed Field Farm and 239 Lugtrout Lane. It should provide open space, play areas and homes for older people. The existing sports pitch, used by Coldlands Colts Boys FC, must be kept. Developers will contribute to education, health services and playing pitches, with highway works on Damson Parkway and Lugtrout Lane.

Policy SMBC/SO2

Moat Lane Depot

pp. 164–165

The human version (we wrote this, not the council)This site allocation is for 99 dwellings at Moat Lane Depot. It is a brownfield site in the urban area, made up of the existing Council depot and industrial estate, which are expected to become available during the Plan period. The site has good access to key services, facilities and public transport. Development should provide public open space, play areas and on site doorstep play. An integrated drainage, landscape and ecological strategy is needed to fix drainage issues and reduce surface water flooding. Developers will contribute to education, health services and playing pitches, and improve walking and cycling links to Solihull Town Centre.

Policy NESS015

Beachampton

pp. 165–170

The human version (we wrote this, not the council)This allocation creates a new settlement on a 381.6-hectare site in north Buckinghamshire, next to the Milton Keynes boundary. It will deliver a minimum of 8,230 homes, with around 3,200 in the plan period to 2045 and the rest beyond, plus 15 Gypsy and Traveller pitches and around 2,500 sqm of town centre uses. Requirements include four primary schools, two secondary schools, the Whaddon Bypass and a spine road network. Green gaps must keep Beachampton, Nash and Whaddon separate, and Ancient Woodland must be protected with buffers.

The human version (we wrote this, not the council)This site allocation covers the Micklewell Park Extension in Daventry, allocated for residential development. A masterplan agreed by the Council must show comprehensive delivery and full integration with the site to the south, which has permission and is under construction. Proposals must provide approximately 430 dwellings. They must keep the Green Wedge to the north and east and protect the Grand Union Canal Conservation Area and its setting. Provision is needed for public transport, walking, cycling and wheeling. Contributions are required for leisure and sports facilities and healthcare. Assessments must cover heritage, landscape, ecology, highways, flood risk, noise and air quality.

The human version (we wrote this, not the council)This site allocation sets out how land north of Middlemore in Daventry is allocated for residential development. Proposals must follow a masterplan agreed by the Council. They must provide approximately 720 dwellings. They must keep the route of the Braunston Tunnel as a green heritage corridor with a footpath and the ventilation shafts. Other requirements include greenspace and wildlife corridors, links to Middlemore, Micklewell Park and the Heartlands employment area, walking and cycling routes, open space, community facilities, and contributions to leisure, healthcare and transport. Assessments are needed on heritage, landscape, ecology, highways, flood risk, noise, air quality and other topics.

Policy NESS018

Wing

pp. 171–176

The human version (we wrote this, not the council)This allocation covers a 96-hectare site north-west of Wing for a minimum of 1,630 homes, all expected within the plan period, plus 5 Gypsy and Traveller pitches and around 1,000 sqm of town centre uses. It requires a primary school, contributions to off-site education and GP services, and new roads including the Wing North Spine Road and Wing West Link Road. Development must protect Wing Conservation Area and the Castle Hill Scheduled Monument, provide buffers to Local Wildlife Sites, and follow a site-wide masterplan.

The human version (we wrote this, not the council)This site allocation re-allocates Daventry North East for residential development. Proposals must provide approximately 3400 dwellings. They need a masterplan agreed by the Council. They must also provide education, a local centre with community facilities and local employment, an open space network, and an extension to Daventry Country Park under policy D10. They need sustainable transport links to the town centre, Southbrook and Long Buckby Railway Station, towpath access with a contribution to the surface, and healthcare funding.

The human version (we wrote this, not the council)This site allocation is for mixed use development at Arden Cross, including the HS2 Interchange station, commercial uses, homes, retail, higher education and a health education campus. It should be delivered through a comprehensive masterplan that improves access, creates a green and blue network and builds a clear sense of place. The masterplan should create a high density, active place around the transport hub. The c140ha site will be released from the Green Belt. The first land is expected in 2030, and 1,600 homes are expected within the plan period. To limit harm to the setting of Park Farmhouse and Packington Hall and Park, planting should protect key views.

Policy SMBC/UK2

Damson Parkway

pp. 173–175

The human version (we wrote this, not the council)This site allocation is for employment development at Damson Parkway, to meet local and strategic needs and needs linked to the UK Central Solihull Hub Area. It is a 94ha release from the Green Belt that already houses JLR activities, with potential for an additional 57.5 ha (gross), or 40 ha (net). It may also provide ancillary facilities for Birmingham Airport. There should be no building in higher flood risk zones. Existing sports provision must be relocated nearby before the land can be developed, with the new site agreed with Sport England. Infrastructure includes flood alleviation to Damson Lane and highway works. The site lies in a Growth Zone.

The human version (we wrote this, not the council)This site allocation covers land north and west of Daventry town centre. The eastern part, north of Eastern Way, is protected as Local Green Space, although parking and sport and play space may be provided there for Daventry Hill School. The western part is allocated for mixed uses: residential, office, hotel, leisure, restaurant or pub, and health. A masterplan agreed by the Council is required. Proposals must provide pedestrian and cycle links to the town centre, buildings that suit key views, quality public space to develop the area's tourism potential, and contributions to transport and healthcare. Assessments cover heritage, landscape, ecology, highways, flood risk, noise, crime and contamination.

The human version (we wrote this, not the council)This site allocation covers the former Council offices on Lodge Road, Daventry. Proposals to use the offices for town centre uses are encouraged. Re-use or redevelopment should make the best use of land while responding sensitively to the nearby Grade I listed Church of the Holy Cross. It should also respond positively to level changes and surrounding buildings, and keep mature landscaping along Eastern Way where possible. Development must be informed by assessments and mitigation covering archaeology and heritage, ecology, highways and transport, flood risk and water recycling, noise and air quality, and crime and disorder.

The human version (we wrote this, not the council)This site allocation covers land off Newnham Drive, Daventry, for E(g), B2 or B8 uses. Proposals should design the layout so that neighbouring residents do not suffer adverse amenity impacts. They should relate well to the existing employment area and provide walking and cycling links to the rest of that area and to the neighbouring homes. They should make an appropriate contribution towards off site sustainable transport and highways mitigation, set out any water and water recycling mitigation and phasing needed, and comply with the Northamptonshire Minerals and Waste Local Plan.

The human version (we wrote this, not the council)This section introduces the individual policies for housing allocations of more than 200 homes, including mixed use sites. It explains that sites have been allocated in line with the settlement hierarchy and are grouped by the tier in which each settlement sits in the Settlement Review. The text here is a short fragment that leads into the tier listings that follow.

The human version (we wrote this, not the council)This section explains the settlement tier system used to group site allocations. The Settlement Review places every settlement in Buckinghamshire into tiers based on local services, public transport, jobs and distance to the nearest town, to judge how much growth is sustainable. Tier 1 covers the major urban areas: Aylesbury, High Wycombe and land on the edge of Milton Keynes, while Tier 5 covers medium and small villages and Tier 6 hamlets, where nothing is allocated. Sites of 200 or more homes get their own policy; smaller allocations sit in appendix K.

The human version (we wrote this, not the council)This allocation covers around 92.8 hectares at South Aylesbury for approximately 1,350 homes and 5 Gypsy and Traveller pitches, made up of five land parcels planned together. It requires a 2FE primary school, a local centre, a community building with a possible police touchdown facility, and 50% green infrastructure. Land is safeguarded for the Aylesbury Southeast Link Road, now under construction, with financial contributions towards it. Detailed flood modelling is required, including measures to help protect Stoke Mandeville Hospital from surface water flooding.

The human version (we wrote this, not the council)This site allocation covers the South East Gateway in Daventry, for E(g), B2 or B8 uses. A masterplan agreed by the Council is required. Proposals must provide a mix of unit sizes not exceeding 10,000 sq m, high quality design and an enhanced gateway into the town along the A45. They must respond to nearby heritage, including the Burnt Walls and Borough Hill Scheduled Monuments, and keep the area shown as a heritage buffer open in perpetuity. An archaeological desk based assessment is needed. Walking and cycling links to the Marches employment area and neighbouring homes, transport contributions and water infrastructure details are also required.

The human version (we wrote this, not the council)This allocation covers a 113-hectare site at south-west Aylesbury for 1,400 homes and 5 Gypsy and Traveller pitches, with a 2FE primary school, on-site health and community facilities, a linear park and sports pitches. It requires a Southwest Link Road connecting the Stoke Mandeville relief road to the A418 Oxford Road, plus strategic flood defences and drainage. Outline permission was granted in May 2026, with construction expected from 2028, delivering fifty homes initially then 140 per year. A buffer is needed against noise from HS2.

The human version (we wrote this, not the council)This policy sets Hertsmere's town centre network and hierarchy, shown in Table 8.5 and on the Policies Map, with Borehamwood Town Centre as the primary retail centre and Darkes Lane, Potters Bar as a second tier centre. It applies a town centres first approach and the Sequential Test to main town centre uses. Out-of-centre proposals are refused unless provided for in the Plan or they pass the sequential test. Retail Impact Assessments are required for main town centre uses of 350 square metres gross floorspace or more at edge-of-centre and out-of-centre locations. Farm shops are restricted to land-based goods.

The human version (we wrote this, not the council)This site allocation supports proposals that enhance Daventry Country Park's recreation, leisure, health and wellbeing and cultural assets, as long as they protect, manage or enhance important habitats and heritage assets. Daventry North East (Policy D5) is expected to provide an extension to the Country Park and a link between the Grand Union Canal and the town centre. This should include linked green and blue space, nature recovery measures, a linear park with footpath and cycleway connections, and chances for recreation. Nearby development should preserve or enhance the setting of the Daventry Reservoir Conservation Area and the Grand Union Canal Conservation Area.

The human version (we wrote this, not the council)This allocation covers three parcels totalling around 242.6 hectares north of the A41 at Aylesbury, including Aylesbury Woodlands. It provides approximately 1,700 homes plus sixty extra care units, around 102,800 sqm of employment floorspace including the Aylesbury Woodlands Enterprise Zone, a 4,000 sqm local centre, a two-form entry primary school, a 6,000 sqm hotel and conference facility and a 16-hectare sports village. Primary access must come from the Eastern Link Road, at least 50% of the site must be green infrastructure, and employment land is safeguarded from other uses.

The human version (we wrote this, not the council)This policy supports measures that promote walking, cycling and wheeling in and around Brackley. This includes links within the settlement confines and between Brackley and surrounding rural settlements and employment areas. Priority is given to the measures identified in the most recent Brackley Local Cycling and Walking Infrastructure Plan. Existing active travel links will be retained and, where possible, improved and enhanced. Opportunities to enhance, promote and improve public transport links will also be supported.

← Back to the plan search