The human version (we wrote this, not the council)This allocation designates approximately twelve hectares of land north of Lower Icknield Way, Princes Risborough, as a new Key Employment Area, of which 9.6 hectares is expected to be developed for business, industrial and storage uses. The site is visible from the Chilterns National Landscape and the Ridgeway National Trail, so high-quality design and structural landscaping are required, including new hedgerow planting. Access would come from Lower Icknield Way, with contributions towards the Princes Risborough to Chinnor walking and cycling route.
Jobs & economy
Employment land, offices, industry, warehousing, rural businesses, tourism and skills.
246 sections of the plan, in document order.
The human version (we wrote this, not the council)This allocation provides 4.5 hectares of employment land behind Weston Road, Aston Clinton, of which 3.6 hectares is expected to be developed. It supports the expansion of Halton Brook Business Park, an established base for medical instrument manufacturing, reinforcing the area as a hub for medical technology. Development must be coordinated with the neighbouring allocated site, keep and improve the hedgerow and trees on the western boundary, and be designed to sit comfortably alongside the homes on Weston Road.
The human version (we wrote this, not the council)This allocation covers the Bucks Goat Centre and Layby Farm near Stoke Mandeville for approximately one hectare of employment land for offices, light industry and research. The Bucks Goat Centre visitor attraction can continue, be reconfigured or relocated, and existing educational uses retained or re-provided. A site-wide masterplan is required, and buildings must respect neighbouring bungalows in scale and use local materials such as timber cladding and red brick. A financial contribution to the Southeast Aylesbury Link Road is also required.
The human version (we wrote this, not the council)This allocation provides 2.6 hectares of employment land behind Stokenchurch Business Park, near Junction 5 of the M40, for light industrial, general industrial and storage uses. The site lies within the Chilterns National Landscape, so proposals must take a landscape-led approach backed by a Landscape and Visual Impact Assessment. Development must connect properly to the existing business park so it works as one employment area. Its proximity to the Aston Rowant protected area, about five hundred metres away, means further habitat assessment is required.
The human version (we wrote this, not the council)This policy sets the minimum employment land to be provided over the Plan period, through allocations, existing commitments and neighbourhood plan allocations. The figures are about 15.8 ha for office and research and development, of which at least 10 ha is office space, about 104 ha for local industrial and warehousing in units under 9,300 sq m, and about 484 ha for strategic industrial and warehousing in units over 9,300 sq m. The Council will also support a broad range of employment uses, such as advanced manufacturing, life sciences, motorsports and clean energy. New developments that provide affordable workspaces will be supported.
The human version (we wrote this, not the council)This allocation sets out a 29 hectare mixed employment-led development off Drakes Drive, Long Crendon, next to the existing industrial park. Around 7.7 hectares would be business, industrial and storage space, alongside leisure uses that complement rather than compete with local facilities. Buildings must be directed to the lowest flood risk areas, with none allowed in the highest risk zone. The scheme must improve buses and provide safe walking and cycling links to Long Crendon, Thame, Haddenham and Aylesbury, guided by a site-wide masterplan.
The human version (we wrote this, not the council)This policy keeps existing and allocated employment sites and industrial estates in employment use (Classes E(g), B2 and B8). Proposals should show regard to the Economic Growth Strategy 2025. New employment uses and expansions are supported if they do not harm neighbours' amenity. A net loss of employment will only be supported with evidence that the use is no longer needed, no longer viable, or in clear conflict with adjoining uses. Other uses must meet tests, including at least 12 months of active marketing. New employment development outside defined areas is supported only where it is well related to an existing area and no capacity exists there.
The human version (we wrote this, not the council)This allocation supports the continued growth of Pinewood Studios at Iver Heath as a Strategic Employment Area and a hub of national and international importance for film, television and the creative industries. The main use will be creative industries production, along with supporting facilities, research, training and related digital uses such as data centres. Other uses will only be allowed if it is robustly shown there is no reasonable prospect of keeping the site for creative industry uses. Development must also improve sustainable transport links and protect wildlife at the neighbouring Black Park Country Park.
The human version (we wrote this, not the council)This policy supports development that sustains and enhances the rural economy by creating or safeguarding jobs and businesses. Proposals must be of an appropriate scale, avoid unacceptable harm to residential amenity, respect the rural area's character and protect the best and most versatile agricultural land. Acceptable types include the re-use of farm buildings under Policy R5, farm diversification, small-scale tourism and visitor accommodation, expansion of small businesses in their existing locations, agriculture, forestry, fisheries and equestrian use, and small-scale employment to meet local needs. Proposals that value the natural and historic environment as an asset are also acceptable.
The human version (we wrote this, not the council)This allocation sets aside land at the former Finmere Aerodrome near Tingewick as a new Key Employment Area, delivering approximately 27 hectares of employment land for industrial, storage and distribution uses. Development should be masterplanned, led by landscape design, and focus on the previously developed (brownfield) parts of the former RAF airfield. Requirements include safe access from the A421, a bus turning circle, protection of the Tingewick Conservation Area and nearby Ancient Woodland, and archaeological investigation. Around 16 hectares of new employment development are expected after supporting infrastructure.
The human version (we wrote this, not the council)This policy supports tourism and leisure development, including tourist accommodation, where it strengthens the tourism offer, conserves the natural and built environment and does not harm visual amenity, the countryside or residents. Evidence of rising demand is needed, and sustainability measures should be included. The loss of tourist facilities is allowed only if they are not viable after at least 12 months of marketing. Caravan, chalet and camping sites must meet extra criteria on access, services, traffic and design. Planning permission for caravans and chalets will carry a condition limiting them to holiday use, so they are not used as permanent homes.
The human version (we wrote this, not the council)This allocation provides approximately 2.3 hectares of flexible employment land at Rectory Farm, New Road, Weston Turville, for office, research, industrial and storage uses. The site forms part of the wider Hampden Fields strategic allocation, and development must fit with the agreed Hampden Fields masterplan and phasing. Proposals need safe vehicle access from New Road, walking and cycling links to nearby employment areas and homes, and landscape buffers to protect neighbouring residents and the countryside. Around 1.9 hectares of new employment development are expected after supporting infrastructure.
The human version (we wrote this, not the council)This policy covers development alongside canals. At Primary and Secondary villages in the settlement hierarchy, new canalside development is supported where it provides active canal frontages with recreational or economic uses and has regard to the canal's use, accessibility and safety. Away from these villages, canal-related development may be acceptable where it needs to be near the canal, protects the openness and rural character of the countryside, does not harm the area or neighbours, keeps public access to the canal, and does not affect road safety. Adequate parking must be provided on site.
The human version (we wrote this, not the council)This allocation supports Marlow Film Studios at Little Marlow as a film, high-end television and media production complex within the West of London Screen Cluster. The site already has planning permission following an appeal decided by the Secretary of State. Development must include improvements to the Westhorpe interchange, a new pedestrian and cycle bridge across the A404, and links to Marlow station and Bourne End. As the site sits in the Metropolitan Green Belt, proposals must protect openness, heritage assets including the Little Marlow Conservation Area, and the setting of the Chilterns National Landscape.
The human version (we wrote this, not the council)This allocation designates Westcott Enterprise Zone and Venture Park, a 268 hectare Strategic Employment Area expected to deliver approximately 65 hectares of employment land for research, industrial and distribution uses. Westcott is a nationally important centre for space, robotics, drones and advanced engineering, home to around ninety businesses. The policy takes a flexible approach, allowing supporting facilities and limited, time-restricted worker accommodation where needed for the site to function, but housing must stay subordinate to the employment role. Proposals must also improve sustainable travel links to Aylesbury, Bicester and the wider area.
The human version (we wrote this, not the council)This allocation supports Silverstone Circuit and Silverstone Park at Dadford as an internationally significant motorsport destination and a centre for high-performance engineering, business, education and leisure. It backs track and event improvements, new and upgraded employment space, training facilities linked to the Silverstone University Technical College, and accommodation for students, apprentices and employees connected to the site. Proposals must protect neighbouring communities from noise and traffic, improve sustainable transport, and conserve the rural landscape and heritage assets including Luffield Priory. The site straddles the boundary with West Northamptonshire, so cross-boundary working will be important.
The human version (we wrote this, not the council)This policy supports moving the vehicle recycling facility, to help regenerate the Daventry South East Gateway. A proposal is supported where the new site meets all of four criteria. There must be no significant adverse impact on the local landscape and heritage assets. There must be good access to the strategic highway network. There must be no significant adverse impact on the amenity of existing residents. There must be no harm to the form, character and setting of an existing settlement.
The human version (we wrote this, not the council)This policy requires major developments to show how they support education, skills and training outcomes in line with the West Northamptonshire Economic Growth Strategy. This must cover both the construction and operational phases, including apprenticeships and training, and work with the West Northamptonshire Employment Support Service and local education providers to recruit locally and build skills for priority sectors. Where on-site delivery is not feasible, financial contributions will be sought under the Infrastructure and Developer Contributions SPD. New or expanded education and training facilities are supported in accessible locations served by sustainable transport.
The human version (we wrote this, not the council)This site allocation sets aside 10 ha at Shacks Barn, Whittlebury, for mixed employment development. A masterplan for the whole site is needed before any application. Uses will be E(g), B2 and B8, with supporting uses only if complementary, and an independent market assessment is required. Access uses the existing access only, with new footpaths and cycleways, public transport links and a Transport Assessment and travel plan. A heritage impact assessment is needed because of the Lordsfield Farm scheduled monument. Archaeological, landscape and visual, and crime prevention assessments are also required.
The human version (we wrote this, not the council)This site allocation sets aside 50 ha south of Junction 16 of the M1, Northampton, for strategic B8 warehousing and logistics. A masterplan is needed before any application. Proposals must follow minerals extraction and restoration policies, use low-carbon design, offer training, and provide public transport and active travel. Landscape buffers must separate the site from Nether Heyford and Upper Heyford. Applicants must show no adverse effect on the nearby SSSI, and deliver biodiversity net gain. Heritage, noise, lighting, transport, flood risk and crime assessments are required. Two years of overwintering bird surveys must check links to the Upper Nene Valley Gravel Pits Special Protection Area.
Land east of M1 (extension of Daventry International Rail Freight Terminal DIRFT)
pp. 298–301The human version (we wrote this, not the council)This site allocation covers land east of the M1 for strategic B8 warehousing and logistics, as an extension of the Daventry International Rail Freight Terminal (DIRFT). A masterplan is needed before any application. Proposals must use low-carbon design, offer training, and provide for public transport and active travel. Landscape buffers must protect Crick, Clay Coton, Lilbourne and Yelvertoft. Heritage, landscape, noise, lighting, transport, flood risk and crime assessments are required. All vehicle access must go through the existing DIRFT site west of the M1, and drainage should maximise Sustainable Drainage Systems.
The human version (we wrote this, not the council)This policy supports Silverstone as an international venue for motorsport and high-performance innovation. Growth in advanced engineering and automotive technology is encouraged, along with education, business and skills work linked to motorsport. Proposals should show economic benefits, inward investment and collaboration between business, academia and the public sector. Development should complement existing uses and support the visitor economy, and must follow the Plan's placemaking, design and sustainability policies. Proposals must show functional links to Towcester and Brackley, and address cross-boundary infrastructure needs, working with Buckinghamshire Council.
The human version (we wrote this, not the council)This policy covers waste. The Council will ensure waste is managed sustainably to protect human health and the environment, and will promote a circular economy. Development proposals must apply the waste hierarchy and follow circular economy principles. The Council will work with partners including Hertfordshire County Council to help achieve waste net self-sufficiency. Loss of an existing waste site is only permitted if replacement processing capacity is secured. New waste facilities are permitted only where there is an identified strategic need, existing capacity has been maximised, and they are in a Strategic Industrial Location or extend an existing facility. They must also avoid harm to health, nature and amenity.
The human version (we wrote this, not the council)This policy sets out specific requirements for development in Fossetts. New development must support health and wellbeing, be matched by the infrastructure it needs, and create a walkable, housing led neighbourhood. A range of homes, including family housing, will come from sites in Policy N7i. Employment areas at Stock Road, Temple Farm and Rosshill are protected. The Scheduled Monument at Prittlewell Camp will be conserved, with buffer zones as needed. The policy supports making Eastern Avenue easier to cross on foot and by bike. It also seeks to protect green space, plant trees, avoid flood risk, improve bus routes and fill cycle network gaps between Priory Park and Fossetts Way.
The human version (we wrote this, not the council)This policy asks development to apply circular economy principles to conserve resources and improve efficiency. Major development should aim to be net zero-waste. Proposals must manage the type and volume of recyclable materials and waste during construction and occupation. They must provide enough on-site space for sorting recycling, composting organic material and general waste, with safe access and separate commercial and household waste in mixed-use schemes. Flats need temporary storage for each unit and communal storage. New multi-storey development must also provide storage and collection systems on each floor unless other designs are shown to work. Major schemes are encouraged to submit a Circular Economy Statement.
The human version (we wrote this, not the council)This section introduces the economy policies, which support delivery of the Local Plan's gross target of 219 hectares of new employment land, based on the Lichfields Employment and Retail Study 2025. Delivery will come through existing commitments, new allocations, intensification of existing sites and protecting employment land from loss. Employment uses cover offices, research and development, industry and storage under Use Classes E(g), B2 and B8. The policies support the Buckinghamshire Economic Growth Plan 2025 and note that permitted development rights converting offices to homes may reduce employment floorspace.
The human version (we wrote this, not the council)This policy protects Buckinghamshire's strategic and key employment sites, listed in Appendix L, which include the three Enterprise Zones and Pinewood Studios. Regeneration, improvement and intensification for employment use will be supported where proposals link strongly to the Buckinghamshire Economic Growth Plan and its key sectors: life sciences, space, robotics and drones, advanced manufacturing and creative industries. The sites are protected for employment use and their loss to non-employment uses will be resisted. Complementary uses such as shared training facilities and staff amenities are also supported.
The human version (we wrote this, not the council)This policy covers employment sites above 1,000 square metres or 0.25 hectares that are not listed as strategic or key sites. Intensification and regeneration for employment uses will be supported. A change to non-employment uses may only be permitted where the site has been robustly marketed for employment use for a continuous period of 18 months with no viable interest, at an appropriate price, before the application is submitted. Any affected businesses should be able to relocate, ideally within Buckinghamshire, and the change must not harm the employment use of the rest of the site.
The human version (we wrote this, not the council)This policy safeguards small employment sites, defined as up to 1,000 square metres or 0.25 hectares, which support small businesses, start-ups and local services in market towns and on settlement edges. Losing such a site to non-employment uses, including housing, will only be supported where it is clearly shown that employment use is no longer appropriate or achievable, reasonable efforts have been made to keep employment on the site, and the loss would not unacceptably reduce the supply and choice of small business premises. Once lost, these sites are rarely replaced.
The human version (we wrote this, not the council)This section describes Shoeburyness and sets out its vision. It is the easternmost neighbourhood of Southend and one of the most fragmented. The Garrison is a Victorian military site, largely protected as a Conservation Area and now mostly homes. Gunners Park and East Beach attract visitors. North Shoebury has a retail park anchored by a large ASDA store. Local jobs focus on Vanguard Way, Campfield Road and Towerfield Road, and the MOD and QinetiQ remain on the New Ranges. The vision conserves the Garrison, keeps Gunners Park and East Beach for recreation, improves links to Shoeburyness Railway Station, increases tree cover and protects the employment areas.