Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Transport & travel

Roads, rail, buses, walking and cycling, parking, EV charging and major schemes such as East West Rail and HS2.

564 sections of the plan, in document order.

The human version (we wrote this, not the council)This section explains where the plan's new homes will come from and lists every site proposal. There are four sources of supply: sites with planning permission, allocations, broad locations or opportunity sites, and windfall development. Delivery of broad locations is less certain, so only part of their capacity is assumed by 2045. Windfall sites are those not identified in the plan, such as conversions or flats over shops. The table then lists the site proposals for each neighbourhood with their approximate homes. The largest is Bournes Green New Neighbourhood, Land North of Southend, for a minimum of 4,900 homes, followed by Better Queensway with about 1,760 homes.

The human version (we wrote this, not the council)This section sets out proposal BID.1, a mixed-use urban extension north and east of Bidford-on-Avon delivering at least 2,225 homes between 2033 and 2050 across around 221 hectares. It includes two primary schools, land for a secondary school, an early years facility, a local centre, 11 hectares of employment land and 8 Gypsy and Traveller pitches. A new link road with a bridge over the River Avon will cut traffic through the village centre, and open space will keep a green gap between Bidford and neighbouring Broom.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.

The human version (we wrote this, not the council)This section introduces Part 3 of the Local Plan, on Hertsmere's towns and places. It says the Plan is organised around four principal settlements: Borehamwood, Potters Bar, Bushey and Radlett, with Settlement Visions prepared for each. It describes the character and vision of each town. It also covers Hertsmere's links with neighbours such as Watford, St Albans, Welwyn Hatfield, Three Rivers, Barnet, Enfield and Harrow. It explains that a brownfield-first approach is used, but that urban land alone cannot meet all needs. The Plan therefore also allocates sites at settlement edges and a new settlement at Bowmans Cross.

The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.

The human version (we wrote this, not the council)This policy sets priorities for strategic connections, to be achieved by working with transport providers. For rail, it seeks faster and more frequent services between London, Birmingham and airports via Northampton, extra services, a multi-transport interchange in the Milton Keynes and Northampton areas, better links to Aylesbury and Bletchley, and more rail freight. For road, it seeks A45 traffic management, A43 improvements, a step-change in bus services including to Silverstone, better bus links to Northampton station, and more electric buses. It also supports using the canal network for freight.

The human version (we wrote this, not the council)This section describes proposal BIT.1, land at Park Farm west of Bishop's Tachbrook. The 41-hectare site will deliver at least 655 homes between 2030/31 and 2037/38, plus 2.2 hectares of land for a possible two-form entry primary school, a community hall site and a small local centre. A significant green buffer will protect the setting of the Grade I listed Warwick Castle parkland. A contaminated land assessment is needed for the former quarry and landfill in the northern part of the site.

The human version (we wrote this, not the council)This section sets out the context, vision and key spatial objectives for Borehamwood. It describes Borehamwood as Hertsmere's largest settlement, principal town and economic centre, with strong rail and road links and an internationally known film and television industry. The Plan makes it the main focus for housing-led growth and regeneration, using a brownfield-first approach and coordinated, rather than piecemeal, redevelopment. The vision includes a regenerated town centre, a stronger Shenley Road, protection of the studios cluster, and a network of connected neighbourhoods. It lists eleven key spatial objectives covering housing, town centre vitality, film and creative industries, movement, design, green infrastructure and infrastructure delivery.

The human version (we wrote this, not the council)This policy allows two routes shown on the policies map to be investigated for future transport use: the former Northampton to Market Harborough railway line, which would need part of the North West Relief Road to be realigned, and the former Northampton to Brackmills railway line. Schemes must make compensation for any loss of habitat. The Market Harborough route must also include a parallel walking and cycling route. Consideration will also be given to a Northampton Northern Orbital Road.

The human version (we wrote this, not the council)This policy supports new or expanded overnight lorry parks where they meet an identified need. They should be next to the strategic road network, in particular the M1, A5, A14, A43 and A45, and include driver facilities. Access should avoid queuing on the highway, and sites must not be next to or reached through residential areas or unsuitable rural roads. They should promote safety through Secured by Design and aim for Park Mark Freight standards, avoid harm from noise, lighting and air quality, be screened and landscaped, and have a transport impact assessment and travel plan.

The human version (we wrote this, not the council)This section summarises the Infrastructure Delivery Plan (IDP), which sets out the key infrastructure needed to support growth. The IDP is a live document that will be updated. The plan proposes a total of 14,700 dwellings up to 2045, including a new neighbourhood of 4,900 homes at Land North of Southend. A table splits needs between the existing urban area and Bournes Green. Needs include road, bus, rail, walking and cycling upgrades, community facilities, and health and emergency services. The existing urban area needs about 1,000 extra early years places. Bournes Green would need about 450 early years places, two primary schools and one secondary school.

The human version (we wrote this, not the council)This section covers proposal BIT.2 at Red House Farm, south-west of Bishop's Tachbrook. The 160-hectare site provides around 121 hectares of strategic employment land, totalling 3,750,000 sq ft of floorspace mainly for logistics and industry. The developer will fund a new M40 junction to replace junctions 13 and 14, plus a dual carriageway link road to Warwick and Leamington. The scheme also includes a Park and Ride, a central mixed-use hub, 39 hectares of green and blue infrastructure, and a travelling showpersons yard of at least 6 plots. Delivery runs from 2027 to 2034/35.

The human version (we wrote this, not the council)This section introduces the infrastructure chapter. It says infrastructure must be delivered alongside homes and jobs, guided by the Infrastructure Delivery Plan and its Phase 1 and Phase 2 reviews. It covers national policy, school places and green infrastructure. It lists infrastructure types in the plan, such as transport, healthcare, education, utilities and digital. Funding comes from Section 106, Section 278, the Community Infrastructure Levy and SAMM fees. The SAMM zone of influence around the Upper Nene Valley Gravel Pits SPA extends from 3km to 5.9km. The section also summarises transport and social infrastructure.

The human version (we wrote this, not the council)This policy sets out what development must do in or near the Colne Valley Regional Park, a park of over 10,000 hectares in the east of the county established in 1967. Development should maintain and enhance the park's landscape, waterways and biodiversity, provide countryside recreation that is accessible to all, and improve walking, wheeling and cycling routes. It should also support the rural economy, encourage community participation and help reduce pollution to the River Colne. A possible extension of the park to cover Fulmer parish is being considered.

The human version (we wrote this, not the council)This policy makes Borehamwood the principal location for housing-led growth, regeneration and infrastructure investment in Hertsmere over the plan period. Residential-led mixed-use development is supported where it renews under-optimised land, helps meet the housing requirement and strengthens the town centre. Growth should come mainly from previously developed and under-used land, focused on the town centre, the railway station area and the Elstree Way corridor, with higher densities where suitable. Development should deliver affordable housing, protect the film and television cluster, improve walking, cycling and public transport links, and be supported by infrastructure. Major development must contribute to comprehensive planning, and fragmented site-by-site schemes are resisted.

The human version (we wrote this, not the council)This policy covers regeneration of Borehamwood Town Centre. Development there must contribute to housing-led mixed-use regeneration, active streets, better public realm and the infrastructure needed for growth. Proposals are supported where they add homes, keep the centre viable, provide a mix of town centre uses, give active ground floor frontages, and strengthen Shenley Road as the civic, commercial and social spine. They should also improve the arrival experience at Elstree & Borehamwood railway station. Residential-only redevelopment of strategically important sites is not supported unless mixed use is shown to be unviable or unnecessary. Major development needs a masterplan or design and access statement.

The human version (we wrote this, not the council)This section sets out proposal BIT.3, 122 hectares north-west of Bishop's Tachbrook delivering at least 1,720 homes on about 46 hectares between 2028/29 and 2040/41. Around 74 hectares becomes public open space, including a 40-hectare extension to Tachbrook Country Park to keep a permanent green gap south of Leamington. The scheme includes a community hub with possible shops and a GP surgery, land for a two-form entry primary school, and funding towards secondary education. Green buffers must keep Bishop's Tachbrook visually separate from Leamington and Warwick.

The human version (we wrote this, not the council)This policy sets the rules for Suitable Alternative Natural Greenspace (SANG), which is green space created to draw visitors away from protected nature sites. A SANG must provide at least eight hectares per 1,000 new occupants, a circular walk of at least 2.3km, one parking space per hectare, and be secured and managed for at least 80 years. It must be open before the homes relying on it are occupied. Developments of ten or more homes must contribute to a strategic SANG or provide their own; smaller schemes can rely on any strategic SANG in the zone.

The human version (we wrote this, not the council)This section covers proposal GAY.1, a 588-hectare employment allocation at Gaydon next to the Jaguar Land Rover and Aston Martin Lagonda sites. It provides about 157 hectares of strategic employment land and 81 hectares of non-strategic land, focused on automotive manufacturing. At least 50% of floorspace on the main site must be industrial or research uses, with warehousing capped at 50%. It includes 51 hectares for JLR expansion, 7.5 hectares for AML, 73.5 hectares of testing tracks, and a travelling showpersons yard of at least 8 plots.

The human version (we wrote this, not the council)This policy requires development in Borehamwood to contribute to a safer, more accessible and more sustainable movement network. Proposals should prioritise walking, cycling, wheeling and public transport, and provide safe, direct routes to Elstree & Borehamwood railway station, Shenley Road, schools, parks, employment areas and local centres. They should improve east-west and north-south connections across barriers such as major roads and the railway, improve the station gateway, and provide high-quality cycle parking. Parking, servicing and construction impacts must not harm pedestrian safety. Major development must show how its layout supports reduced car dependency. Development that prejudices identified walking, cycling, public transport or station gateway improvements will not be supported.

The human version (we wrote this, not the council)This policy covers the 329 hectare Little Marlow Lakes area between Marlow and Bourne End, which sits in the Green Belt beside the River Thames. It allocates Spade Oak Lake as a strategic alternative green space (SANG) to reduce visitor pressure on Burnham Beeches, with parking off Muschallick Road, and supports wider outdoor recreation. Qualifying developments relying on the SANG must contribute financially and provide safe walking and cycling links between Marlow and Bourne End. Development must protect the river setting, lakes, wildlife, conservation areas and manage flood risk.

The human version (we wrote this, not the council)This section sets out the parking standards for new development. For homes, there are minimum car parking standards that differ between Southend Central and the rest of the city. A flat needs 0.5 spaces in Southend Central and 0.75 spaces elsewhere, and a house needs 1 space. Houses with 4 or more bedrooms need 1.5 spaces outside Southend Central. Lower provision would need to be justified. For other uses, such as shops, offices, hotels and schools, the tables set maximum car parking standards. A further table sets minimum cycle parking standards, including 1 secure covered space per dwelling unless there is a garage or secure area.

The human version (we wrote this, not the council)This section describes proposal HEN.1 at Henley-in-Arden, a 125-hectare masterplanned development of at least 2,084 homes, largely on the golf club land, delivered from 2029/30 to 2044/45. It includes 3.3 hectares of employment land, a two-form entry primary school, expansion of the secondary school with a new sixth form, 9 Gypsy and Traveller pitches, and a new country park at Beaudesert Mount. A link road from the A3400 to the A4189, including a new rail bridge, will let through traffic bypass the town centre. The site will be released from the Green Belt.

The human version (we wrote this, not the council)This section is the contents page for the Borehamwood site allocations in Chapter 14. It lists seventeen allocations, HBA6 to HBA22: Retail Park; The Point, Shenley Road; Regent House and Car Park, Theobald Street; Hertsmere Civic Offices Cluster; Borehamwood Fire Station and Job Centre Cluster; Elstree Way Cluster; Imperial Place; Old Haberdasher's Sports Ground; Aycliffe Road and Leeming Road Local Centre; land north and south of Allum Lane; land at Barnet Lane and Vale Avenue; Organ Hall Farm; Borehamwood Industrial Area Extension; and Lismirrane Industrial Park Extension. Each is shown with a page number.

The human version (we wrote this, not the council)This section sets out the framework for delivering and monitoring the Local Plan. For each strategic policy it lists aims, who will deliver them, how, and the key indicators and data used to track progress. Targets include 14,700 additional homes by 2045, with 4,900 at Bournes Green New Neighbourhood, including 45% affordable homes. Others include 68,400sqm of employment floorspace by 2045, and 20% affordable housing on sites of 10 to 49 dwellings and 30% on sites of 50 or more. It also sets a city-wide target of 15% tree canopy cover and at least 10% biodiversity net gain. Further indicators cover health, heritage, flooding, transport and the airport.

The human version (we wrote this, not the council)This section is the glossary of terms in the Plan, set out as a table of terms and descriptions in alphabetical order. It defines planning terms such as accessible homes, active travel, affordable housing, Air Quality Management Area, Article 4 Direction, amenity green space, ancient woodland, biodiversity, Brownfield Land Register and build to rent. For example, active travel is making journeys in physically active ways like walking, wheeling, cycling or scootering. Ancient woodland is an area wooded continuously since at least 1600 AD.

The human version (we wrote this, not the council)This section sets out proposal KEN.1, land south of Kenilworth delivering at least 776 homes on 60 hectares between 2029/30 and 2036/37, at a density of at least 35 homes per hectare. A significant green edge will maintain separation between Kenilworth and Leek Wootton. A spine road linking Rouncil Lane and Warwick Road must come early in the development. A buffer to the north-west protects sightlines from Kenilworth Castle, and the site sits in a mineral safeguarding area for sand and gravel.

The human version (we wrote this, not the council)This site allocation covers The Point, Shenley Road, Borehamwood, a 1.02 ha publicly owned site. It holds a single-storey building with a cinema, gym and bingo hall, and rooftop public car parking. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 200 new homes, with compatible town centre, leisure and community uses. A site-wide masterplan is required. It must improve pedestrian links to Shenley Road, Centenary Place and Furzehill Road, and may include a public square. Existing leisure uses must be retained, modernised or re-provided where need continues. Development must conserve the setting of All Saints Church and its graveyard, and should generally be mid-rise.

The human version (we wrote this, not the council)This section covers proposal LEA.1 at Blackdown, north of Leamington Spa. Some 72 hectares will be released from the Green Belt for at least 1,043 homes on about 37 hectares, plus roughly 35 hectares of public open space, delivered between 2031/32 and 2041/42. The scheme includes a two-form entry primary school, a community hub and safeguarded land for expanding North Leamington School. Land may also be needed for a future Park and Ride, and the site must contribute to the Kenilworth to Leamington cycle route.

The human version (we wrote this, not the council)This policy requires all new developments, except householder applications, to follow a vision-led approach to transport that prioritises walking, wheeling, cycling and public transport before car use. Larger sites must provide safe walking and cycling routes, including safe routes to schools within statutory walking distance (2 miles for under 8s, 3 miles for over 8s), and fund new or improved bus services for at least five years. Requirements also cover travel plans, car clubs, mobility hubs, and changing and shower facilities in non-residential buildings over 2,500 square metres. Developments must not have an unacceptable impact on highway or rail safety.

← Back to the plan search