Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Flooding & water

Flood risk, drainage, SuDS, river and groundwater quality, and water efficiency.

139 sections of the plan, in document order.

The human version (we wrote this, not the council)This section sets out the site allocations for Kings Langley. Four housing sites are allocated with a combined indicative capacity of around 520 homes. The largest is West of the Kings Langley Estate at 400 homes, followed by land adjacent to the RES site at Egg Farm Lane with 100. Two small sites, Flower House on Station Road and Lonsdale on Hyde Lane, provide 10 homes each. The site tables set out size, phasing, Green Belt status and requirements covering matters such as access, heritage, flooding and biodiversity.

The human version (we wrote this, not the council)This section sets out the site allocations for Maple Cross. Three sites are allocated with a combined indicative capacity of around 1,635 homes. Most come from one strategic site, Land to the West and South of Maple Cross, allocated for up to 1,500 homes plus supporting uses including a primary school, community, retail and commercial space; this land was removed from the Green Belt. The other sites are Land to the North of Chalfont Road (130 homes) and garages behind Longcroft Road (5 homes).

The human version (we wrote this, not the council)This policy requires building alterations, extensions and basements to be of a high standard. Extensions must respect the form, materials and character of the original building and group of buildings, and must not harm the amenity of neighbours, including back gardens. Contemporary designs are supported where these tests are met. Roof extensions on the street frontage should be avoided in favour of rear extensions. Residential extensions must keep a usable garden. Basements, including light wells, must not harm structural stability, flood risk, the natural environment or neighbouring amenity, and need safe access and egress.

The human version (we wrote this, not the council)This section explains the purpose of the infrastructure policy: making sure new development is backed by coordinated, resilient transport, telecoms, utilities and waste facilities. It sets out how the policy will work in practice through the detailed rules in Chapter 7, which cover things like transport requirements, parking, public rights of way, water and telecoms infrastructure, plus wider policies on design, biodiversity, flooding and drainage.

The human version (we wrote this, not the council)This policy aims to make sure transport, telecoms, utilities and waste infrastructure is delivered to support planned growth. Priorities include a transport network that puts walking, cycling and public transport first, gigabit-capable broadband, water and energy networks, and waste facilities that support a circular economy. Developments must show there is enough infrastructure capacity, be phased so infrastructure arrives alongside or before homes, and avoid unacceptable knock-on effects. Land needed for strategic routes and networks will be protected from other development.

The human version (we wrote this, not the council)This section introduces the development management chapter. All development should show it is sustainable, with high quality design and place making, accessibility for all and sustainable transport. Health Impact Assessments are required where development would increase health inequalities. The section covers protecting open spaces, living and working conditions, river pollution and flood risk, and air quality, noting that no Air Quality Management Areas are currently designated. It also covers contaminated land and the mining legacy, avoiding the best and most versatile farmland, groundwater, waste, and designing out crime and terrorism risk.

The human version (we wrote this, not the council)This policy requires all development to be designed and built to cope with a changing climate. Non-residential schemes over 1,000 square metres should achieve BREEAM Excellent certification, an independent sustainability standard, including full water efficiency credits. Buildings must follow a cooling hierarchy that favours passive measures such as orientation, shading and natural ventilation before mechanical cooling. Major residential schemes must complete a CIBSE TM59 overheating assessment and major non-residential schemes a TM52 assessment. Development must also build in resilience to extreme weather, use sustainable drainage and reduce the urban heat island effect.

The human version (we wrote this, not the council)This section sets out the site allocations for Mill End. Four sites are allocated with a combined indicative capacity of around 548 homes. The main site is Land to the South of Shepherds Lane and East of the M25, a 20.8 hectare grey belt site for 520 homes plus supporting uses including gypsy and traveller pitches, a medical centre or GP surgery, extra care housing and public open space. The remaining sites are small: garages behind Drillyard on West Way (6 homes), Quickwood Close garages (16) and garden land off Uxbridge Road (6).

The human version (we wrote this, not the council)This policy covers new agricultural, forestry and equestrian buildings. New buildings or extensions are supported if they are reasonably necessary in scale, construction and design for the efficient and viable long-term operation of the holding. There must be no existing building that can be used, altered or extended, and the new building should be within or next to a group of existing buildings. The site and materials must not cause visual intrusion, and livestock buildings must not cause loss of residential amenity. The supporting text begins the water management section, covering flood risk assessments, SuDS and water stress.

The human version (we wrote this, not the council)This policy covers water and flood risk management. Development must not harm the ecological status of a waterbody, and should look at de-culverting and river restoration. Runoff must be no more than greenfield rates, using SuDS, or at least a 50% reduction where that is not possible. In Flood Zone 3 there must be floodplain compensation, an 8m set back from main rivers, and floor levels 600mm above the flood level. A Water Statement must show adequate sewerage. New homes must achieve no more than 100 litres per person per day. Large non-residential buildings must reach at least 4 BREEAM water credits. The text also begins the parking section.

The human version (we wrote this, not the council)This section explains the purpose of the natural environment policy: conserving and enhancing Buckinghamshire's biodiversity, landscapes, water and green spaces while strengthening resilience to climate change. It sets out how delivery will run through the detailed Chapter 7 policies on matters such as water quality, biodiversity gain, green infrastructure, trees, protected sites, Green Belt, landscape character, flood risk and drainage.

The human version (we wrote this, not the council)This policy sets out how the Council will protect and improve the natural environment and respond to climate change. It commits to conserving the Chilterns National Landscape, delivering at least 10% biodiversity net gain on qualifying developments, and supporting nature recovery through the local strategy. It also covers protecting water quality, aiming for good status in rivers and groundwater by 2027, directing growth to places that reduce car travel, using sustainable drainage, adopting higher water efficiency standards, and supporting renewable energy.

The human version (we wrote this, not the council)This policy says the boundaries of Local Wildlife Sites are shown on the policies map, and proposals that may affect them will be decided using NDMP N6. These sites are not statutory. They are chosen through a local partnership process, with an expert panel. Sites identified as pLWS are treated as having LWS value unless shown otherwise. Developers must follow the mitigation hierarchy, and any off-site habitat compensation must be managed for at least 25 years. The text notes the mandatory 10% Biodiversity Net Gain, which should be delivered on site wherever possible. It also covers great crested newts, soils, water quality and light pollution.

The human version (we wrote this, not the council)This section sets out the site allocations for Oxhey Hall. Two housing sites are allocated with a combined indicative capacity of around 108 homes: Vivian Gardens (8 homes) and Land at Hampermill Lane (100 homes). The site tables set out size, phasing and Green Belt status, along with the site-specific requirements and constraints that future planning applications must address.

The human version (we wrote this, not the council)This section explains the purpose of the placemaking policy: securing high-quality, sustainable development that responds to Buckinghamshire's character, heritage and landscape. It describes how delivery will work through the detailed Chapter 7 policies on design, residential amenity and space standards, together with wider rules on heritage, community facilities, transport, biodiversity, landscape and flooding, so new places are attractive, healthy, well connected and resilient.

The human version (we wrote this, not the council)This section introduces the biodiversity, green and blue infrastructure and landscapes chapter. It explains that England is one of the most nature-depleted countries on Earth and Three Rivers has not escaped that decline. New laws, especially the Environment Act 2021, give councils a duty to conserve and enhance biodiversity, and introduce Biodiversity Net Gain and Local Nature Recovery Strategies. Development must follow the mitigation hierarchy: avoid harm first, then mitigate it, and only compensate as a last resort. The district's wildlife, from wetlands to woodlands, is described as integral to its character and quality of life.

The human version (we wrote this, not the council)This policy requires qualifying development to deliver at least 10% measurable biodiversity net gain, meaning the site must be left better for nature than before, measured with the Government's statutory metric. Gains should be delivered on site first, then off site, with buying statutory credits a last resort, secured by monitoring plans lasting at least 30 years. Protection of wildlife sites is weighted by importance, from international down to local, and loss of irreplaceable habitats such as ancient woodland will normally be refused. New housing must provide on average at least one swift brick per dwelling for nesting birds.

The human version (we wrote this, not the council)This section explains the purpose of the heritage policy: conserving and enhancing Buckinghamshire's historic environment as an irreplaceable resource that supports local character and identity. It sets out how delivery will run through the detailed Chapter 7 policies on conservation areas, heritage assets and design, alongside wider rules on amenity, transport, biodiversity, landscape and flooding, so historic buildings and places are protected as part of sustainable growth.

The human version (we wrote this, not the council)This section sets out the site allocations for Rickmansworth. Six sites are allocated: four housing sites providing around 151 homes, including the Affinity Water Depot on Church Street (75 homes) and a depot at Stockers Farm Road (40 homes), plus two care home sites. Land on London Road is allocated for a 75-bedroom care home, counted as equivalent to 40 dwellings, and Meresworth for a 51-bed care home, equivalent to 27 dwellings. Site tables list size, phasing, Green Belt status and site-specific requirements.

The human version (we wrote this, not the council)This policy supports the University of Northampton at its Waterside Campus. The site is safeguarded for education and ancillary uses, and development should improve links with the wider Central Area. The Council will continue to support student accommodation and related uses. Proposals should respond to the riverside setting and green and blue infrastructure, and address flood risk, drainage and utility constraints. A site-specific Flood Risk Assessment is needed, meeting the Upper Nene design standard of a 0.5% probability event plus climate change allowance. Access for maintaining foul drainage infrastructure must be safeguarded.

The human version (we wrote this, not the council)This site allocation covers Atherstone Football Ground (H28). It will deliver at least 46 dwellings and needs the football ground to move. The preferred new location is east of Sheepy Road, north of Atherstone, with access from Sheepy Road or Royal Meadow Drive. Extra enabling housing may be allowed if site conditions permit. The site needs a detailed Flood Risk Assessment to show how much land outside the Flood Zone 3 climate change extent can be built on. Until new modelling is available, the developable area will be based on the EA Flood Zones. Ground levels may be adjusted for safe access if third party flood risk does not rise.

The human version (we wrote this, not the council)This site allocation safeguards 6.8 hectares of employment land at Holly Lane, Atherstone (E1). Aldi currently has an interest in the land. If Aldi no longer needs it, the site stays safeguarded as a long term employment site for smaller scale mixed E(g)(ii) and B2 uses. Access would be from Holly Lane and/or Abeles Way. Area A is the developable area and Area B is a semi natural buffer along Innage Brook. A Level 3 Flood Risk Assessment must show how much land lies outside flood zones 2 and 3 plus climate change freeboard.

Policy NESS003

Aylesbury

pp. 108–115

The human version (we wrote this, not the council)This allocation covers a 529.7-hectare site north of Aylesbury for around 9,080 homes, with 3,650 delivered in the plan period, plus 15 Gypsy and Traveller pitches and 3,500 sqm of town centre uses. It requires four primary schools, a secondary school, healthcare facilities and the Northeast Aylesbury Link Road connecting the A413 and A418. Development must avoid the highest flood risk areas near the River Thame, keep green gaps to prevent merging with Bierton, and follow a site-wide masterplan and phasing strategy.

The human version (we wrote this, not the council)This section sets out the site allocations for Sarratt. One housing site is allocated: Adams Nurseries on Church Lane, with an indicative capacity of 15 homes. The site is classed as grey belt and remains in the Green Belt, and development should be limited to the brownfield part of the site, with amenity space and biodiversity net gain on the greenfield areas. The site table also covers access constraints and other requirements for future proposals.

The human version (we wrote this, not the council)This section is the glossary, which explains terms used in the Local Plan. It defines terms such as deliverable and developable sites, Green Belt and its five purposes, Grey Belt, and major development, which for housing means 10 or more homes or a site of 0.5 hectares or more. It also explains Local Green Space, National Landscapes, previously developed land, Social Rent and windfall sites. Other entries cover housing terms such as self-build and custom-build housing and discounted market sales housing at least 20% below local market value. The glossary ends with contact details for Tandridge District Council in Oxted.

The human version (we wrote this, not the council)This section sets out the site allocations for South Oxhey. Four housing sites are allocated with a combined indicative capacity of around 200 homes: Northwick Day Centre on Northwick Road (50 homes), the former Sir James Altham School (30), Pinewood Lodge (40) and Land South of St Josephs (80). Each site table sets out size, phasing, whether the land is brownfield or greenfield, Green Belt status and the site-specific requirements future proposals must meet.

The human version (we wrote this, not the council)This policy protects the Chilterns Beechwoods Special Area of Conservation, an internationally important wildlife site, from pressure caused by new residents visiting it. Development within the site's zone of influence that would add 100 or more homes must undergo a Habitats Regulations Assessment. Where required, schemes must provide mitigation or avoidance measures, principally Suitable Alternative Natural Greenspace (SANG), attractive green space designed to draw visitors away from the protected area, or a financial contribution towards it. The 100-home threshold was set on the advice of Natural England.

The human version (we wrote this, not the council)This site allocation covers Hill Farm Rise, Hunsbury Hill in Northampton, allocated for residential development of approximately 80 dwellings. Proposals must follow the diagram in Figure 8. They need an ecological survey and landscape assessment, covering established trees, possible priority grassland and a possible wildlife site. They must be sensitive to the adjoining Local Wildlife Site and keep rail network operational access. Design must reduce noise, particularly from the railway. Other requirements include better links to the Mereway neighbourhood centre, a flood risk assessment, a transport assessment covering the A45 and M1, and contributions to transport and healthcare.

The human version (we wrote this, not the council)This section introduces the environment chapter. The district takes its name from the Rivers Colne, Chess and Gade, which meet at Rickmansworth, and with the Grand Union Canal and many former quarry lakes the area has a complex flooding picture and a wide floodplain. Three Rivers faces flood risk from rivers, surface water, groundwater, sewers and reservoirs, and climate change is expected to increase that risk. At the same time the district lies in one of the driest parts of the UK, so development must be flood-safe and use water efficiently.

The human version (we wrote this, not the council)This policy manages flood risk and water use. Development in flood risk areas must pass national tests that steer building to the safest available land, and no new development is allowed in Flood Zone 3b, the functional floodplain. Floor levels in Flood Zones 2 and 3 must sit at least 300mm above predicted maximum flood levels, and major schemes need sustainable drainage limiting runoff to greenfield rates. Buildings must stay 10 metres from main rivers and 5 metres from other watercourses. As the district is seriously water stressed, new homes must use no more than 110 litres per person per day.

← Back to the plan search