Design & placemaking

Design quality, design codes, character of new development, space standards and residential amenity.

340 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy sets a presumption in favour of keeping public houses. Loss of a pub with heritage, economic, social or cultural value, including by change of use or redevelopment, will be refused unless robust evidence shows legitimate efforts to keep it as a pub, that it is not viable with no reasonable prospect of continued pub or community use, and that it has been actively marketed for a minimum continuous period of two years. Re-provision within redevelopment must be investigated. Development affecting a pub must not harm its viability, character or appearance.

Policy EC19

Markets

pp. 210–213

The human version (we wrote this, not the council)This policy says proposals must protect and seek to enhance existing markets and market spaces. New markets that complement the town centre network are encouraged and should be directed to town centre locations. Outside centres, new market space is supported only if the sequential approach shows it will not harm town centre vitality, uses vacant or underused sites, is well served by public transport, can be accommodated on streets or public realm, and is temporary. The supporting text notes Borehamwood and Potters Bar have monthly farmers and craft markets, and Borehamwood has a twice-weekly street market on Shenley Road.

The human version (we wrote this, not the council)This policy aims to give people of all ages and abilities access to sports, recreation and play opportunities that are publicly accessible and inclusive. Existing sports and recreational facilities should be retained, and loss is supported only if they are genuinely surplus to needs or replaced with improved provision. Developments used by children and young people must increase play and informal recreation opportunities. New housing must include high-quality formal play provision meeting Table 9.1 standards, such as 0.55 hectares per 1,000 population for children and young people, and 0.80 for parks and gardens.

The human version (we wrote this, not the council)This policy aims to make sure enough burial space is available for current and future needs. The Council will protect existing cemeteries and burial grounds from development that would cause their loss or harm their operation. It supports expanding and making better use of existing cemeteries, and planning for population growth, ageing and the needs of faith groups. New or extended burial sites are supported where they meet an identified need, are large enough for long-term demand, and can be reached by sustainable transport. They must also provide supporting infrastructure and avoid unacceptable harm to residential amenity, highway safety, landscape and biodiversity.

The human version (we wrote this, not the council)This policy expects development to protect, maintain and where possible enhance sites important for nature conservation, habitats and ecological networks. Where protected species may be present, proposals need an ecological survey and a minimum 10m buffer of complementary habitat to retained priority habitats, or 15m for woodland. Harm to important sites is only supported if the mitigation hierarchy is followed and exceptional public need outweighs the harm. Loss of irreplaceable habitats such as Ancient Woodland or veteran trees will be refused without exceptional reasons. Relevant development must secure Biodiversity Net Gain of 20%, delivered onsite wherever possible, with management plans where needed.

The human version (we wrote this, not the council)This policy requires development to use a design-led approach to maximise urban greening, such as landscaping, street trees, green roofs and walls, and sustainable drainage. Major development must meet Urban Greening Factors of at least 0.3 for commercial and 0.4 for residential schemes, and where appropriate 0.5 for residential greenfield schemes, unless this is shown not to be feasible. New buildings should include integral swift and bat bricks at one brick per dwelling. Existing trees and their habitat should be kept, and veteran trees and ancient woodland protected. Major development must submit a Landscape Design Strategy and Arboriculture Survey.

The human version (we wrote this, not the council)This policy protects and expands the Borough's publicly accessible open spaces. Loss of or harm to open space, including parks, playing fields and allotments, is only permitted in exceptional cases. These include where the space is surplus to requirements, where equivalent replacement is provided, or where substantial public benefits clearly outweigh the loss. Development must provide new or better open space where its needs require this. Major proposals should include publicly accessible open space on site wherever practicable, or off-site provision or contributions where that is impracticable. New spaces should be safe, inclusive, multifunctional and well managed. Ancillary uses on open space are supported if they are necessary and proportionate.

The human version (we wrote this, not the council)This section is the contents page for Chapter 11, Sustainable Design. It lists twelve policies: SD1 Responding to the Climate Emergency, SD2 Sustainable Design and Retrofitting, SD3 Managing Heat Risk, SD4 Minimising Greenhouse Gas Emissions, SD5 Improving Air Quality, SD6 Energy Infrastructure, SD7 Minimising and Managing Flood Risk, SD8 Water Supply and Wastewater, SD9 Ground Conditions, SD10 Reducing and Sustainably Managing Waste, SD11 Securing a Circular Economy, and SD12 Minerals Consultation Area. Each policy is listed with a page number. The section has no policy wording itself.

The human version (we wrote this, not the council)This policy requires proposals to submit a Sustainable Design Statement, in proportion to the scale of development, showing how sustainable design has been built into the design. New self-contained homes should seek to achieve the BRE Home Quality Mark. New non-residential development of 500 square metres gross floorspace or more must achieve a BREEAM New Construction rating of Excellent, unless this is shown not to be feasible. Sustainable retrofitting is encouraged using a whole building approach. Major residential refurbishment must achieve an Excellent rating under BREEAM Domestic Refurbishment, and major non-residential refurbishment an Excellent rating under BREEAM Non-Domestic Refurbishment, unless not feasible.

The human version (we wrote this, not the council)This policy deals with heat risk. Development must reduce its effect on the urban heat island through building and space design, materials and urban greening. New development must be designed to cut the chance of internal overheating and reliance on air conditioning, and proposals are supported only if priority is given to feasible measures high in the cooling hierarchy. Major development must submit an Energy Statement showing how this is met. Major schemes with public realm should create comfortable spaces with shade and passive cooling, giving priority to urban greening. The explanation refers to CIBSE guidance TM59, TM52 and TM49, and resists loss of soft landscaping.

The human version (we wrote this, not the council)This policy sets carbon rules to help the Borough become net zero-carbon. Major development must be net zero-carbon, with an on-site cut in carbon emissions of at least 35% beyond the Part L baseline of the Building Regulations 2021 Future Home Standard, and must minimise unregulated emissions. Where net zero cannot be reached on site, developers must pay into Hertsmere's carbon offset fund or provide off-site measures. Payments use a formula with a charge of £100 per year for every tonne of CO2 offset, over an assumed 30 years. Major schemes are encouraged to assess embodied carbon, and must set out their approach in an Energy Strategy.

The human version (we wrote this, not the council)This policy covers energy infrastructure. Proposals must respond to a site-specific assessment of the most efficient energy supply options, and major schemes should engage early with energy suppliers. Development should prioritise connection to decentralised heat networks. Major development must provide a Feasibility Assessment for connecting to, or extending, nearby existing or planned heat networks, and minor new-build and conversions must show they have investigated connection. Major schemes should talk to UK Power Networks early about primary substation capacity, using measures such as microgrids where needed. Major development in Heat Network Priority Areas should have a communal low temperature heating system.

The human version (we wrote this, not the council)This policy covers waste. The Council will ensure waste is managed sustainably to protect human health and the environment, and will promote a circular economy. Development proposals must apply the waste hierarchy and follow circular economy principles. The Council will work with partners including Hertfordshire County Council to help achieve waste net self-sufficiency. Loss of an existing waste site is only permitted if replacement processing capacity is secured. New waste facilities are permitted only where there is an identified strategic need, existing capacity has been maximised, and they are in a Strategic Industrial Location or extend an existing facility. They must also avoid harm to health, nature and amenity.

The human version (we wrote this, not the council)This policy asks development to apply circular economy principles to conserve resources and improve efficiency. Major development should aim to be net zero-waste. Proposals must manage the type and volume of recyclable materials and waste during construction and occupation. They must provide enough on-site space for sorting recycling, composting organic material and general waste, with safe access and separate commercial and household waste in mixed-use schemes. Flats need temporary storage for each unit and communal storage. New multi-storey development must also provide storage and collection systems on each floor unless other designs are shown to work. Major schemes are encouraged to submit a Circular Economy Statement.

The human version (we wrote this, not the council)This policy promotes the Healthy Streets Approach across Hertsmere, so walking, cycling and public transport become people's preferred choice of travel. Development must show how it has applied the Healthy Streets Approach and Indicators, and all major development must submit a Healthy Streets Assessment as part of the Transport Assessment. The approach matters most in town centres and key movement corridors. Development must protect and improve walking routes and cycleways, and proposals that harm them will be refused unless mitigation is provided. High-quality public realm should reduce vehicle dominance and remove barriers such as gates, guardrails and stepped kerbs. Cyclist end-of-trip facilities should be provided.

Policy TR3

Parking

pp. 325–328

The human version (we wrote this, not the council)This policy sets a carefully managed approach to parking, designing places on the basis that walking, cycling and public transport will become the preferred ways to travel. Car-free and car-lite development is supported in highly accessible, well-connected locations, and elsewhere where specific conditions are met, such as good access to services, a Controlled Parking Zone, or enough public transport capacity. Development must not exceed the parking standards in Appendix 7 Sustainable Parking Standards. Adequate disabled persons parking must be provided, including in car-free schemes. Proposals must provide cycle parking following the Cycle Design Standards, including spaces for adapted cycles and cargo bikes.

The human version (we wrote this, not the council)This policy covers deliveries, servicing and construction. Proposals should support sustainable freight by water, rail and road, including last-mile distribution, and enable safe, clean and efficient deliveries and servicing, including for emergency services. These needs should be considered early in the design-led approach, especially in mixed-use schemes. Deliveries and servicing space should be off-street, with on-street loading bays used only where shown to be necessary. Larger developments should allow deliveries outside peak hours and secure temporary storage of parcels. Commercial and industrial schemes must provide evidence that servicing parking suits their location, nature and scale. The Council will explore centralised delivery hubs.

The human version (we wrote this, not the council)This site allocation covers the Retail Park in Borehamwood Town Centre, a 5.01 ha urban site in public and private ownership with about 20,000 sqm of mainly large-format retail, leisure and health uses and extensive surface parking. It is allocated for comprehensive mixed-use redevelopment, delivering at least 500 new homes in the latter stages of the plan period, with the 20,000 sqm of main town centre uses re-provided. A site-wide masterplan is required, with phasing that keeps a critical mass of retail activity. Constraints include the culverted Borehamwood Brook beneath part of the car park and flood risk.

The human version (we wrote this, not the council)This site allocation covers The Point, Shenley Road, Borehamwood, a 1.02 ha publicly owned site. It holds a single-storey building with a cinema, gym and bingo hall, and rooftop public car parking. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 200 new homes, with compatible town centre, leisure and community uses. A site-wide masterplan is required. It must improve pedestrian links to Shenley Road, Centenary Place and Furzehill Road, and may include a public square. Existing leisure uses must be retained, modernised or re-provided where need continues. Development must conserve the setting of All Saints Church and its graveyard, and should generally be mid-rise.

The human version (we wrote this, not the council)This site allocation covers Regent House and the car park behind it on Theobald Street, Borehamwood, a 0.55 ha urban site. Regent House is a privately owned office building and the rear car park, which serves Elstree and Borehamwood Railway Station, is publicly owned. It is allocated for residential-led redevelopment delivering at least 55 homes, with public realm and compatible town centre uses. A site-wide masterplan is required, and the two sites must be treated together. A heritage assessment must show how the significance and setting of the Grade II listed Manor House has shaped the design. Pedestrian and cycle links to the railway station must be improved.

The human version (we wrote this, not the council)This site allocation covers the Borehamwood Fire Station and Job Centre Cluster on Elstree Way, a 0.63 ha site in several public-sector ownerships. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 63 homes during the plan period, together with public, community, social or other active uses. Relocating the fire station would be needed first, and replacement accommodation must be secured before the existing facility is lost, unless otherwise agreed with the service provider. Flood Zone 2 affects the vicinity of the site access. A site-wide masterplan is required, and the Job Centre or successor services must be kept or re-provided where need continues.

The human version (we wrote this, not the council)This site allocation covers the Elstree Way Cluster in Borehamwood, a privately owned 0.74 ha urban site. It holds a former police and office building, a petrol filling station and motor-repair premises. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 170 new homes, with employment, workspace or other compatible active uses kept or re-provided at ground and lower levels. Because of the historic petrol filling and vehicle repair uses, ground conditions should be investigated. A site-wide masterplan is required. Development must support the wider employment and creative role of Elstree Way and provide an active ground-floor frontage to it.

The human version (we wrote this, not the council)This site allocation covers Imperial Place on Elstree Way, Borehamwood, a privately owned 2.2 ha site of office buildings and a multi-storey car park. It is allocated for comprehensive mixed-use regeneration delivering at least 550 new homes in the first half of the plan period, with employment and workspace retained, re-provided or intensified, plus public realm and green infrastructure. Parts of the site lie in Flood Zones 2 and 3, and a culverted watercourse runs along its eastern boundary. A site-wide masterplan is required. Development must respond to the operational needs of Elstree Studios and neighbouring employment uses.

The human version (we wrote this, not the council)This site allocation covers the Old Haberdasher's Sports Ground on Croxdale Road, Borehamwood, a 4.1 ha publicly owned site leased to a third party. It is allocated for at least 200 new homes, together with publicly accessible open space, green infrastructure, sustainable drainage and biodiversity enhancement. Development is acceptable only where the loss of the existing sports and recreation provision has been addressed under national and Local Plan policy. That means equivalent or better replacement, unless up-to-date evidence shows the provision is surplus. Replacement facilities must be available before the existing provision is lost, unless another phasing arrangement is agreed. A site-wide masterplan is required.

The human version (we wrote this, not the council)This site allocation covers the Aycliffe Road and Leeming Road Local Centre in Borehamwood, a 1.42 ha urban site. It has ground-floor shops and services with homes above, adjoining residential blocks, parking, garages and open space. The main commercial and maisonette blocks are in public ownership. It is allocated for phased residential-led mixed-use regeneration delivering at least 200 homes and an improved local centre, with public realm, open space and green infrastructure. Existing shops and services must be kept, re-provided or replaced with an equivalent or better offer. Phasing must keep trading going, and affected tenants and leaseholders need a rehousing strategy. A site-wide masterplan is required.

The human version (we wrote this, not the council)This policy requires development in Potters Bar to protect and enhance the town's character, heritage, green and blue infrastructure and landscape setting. Proposals should respond to local scale and townscape, protect heritage assets, and place taller buildings only where they fit. They should protect trees, parks and habitats, improve ecological links, and enhance Potters Bar Brook as a blue-green spine. Sustainable drainage is expected. Development at the edge of the town must be landscape-led and comprehensively planned, and must avoid unacceptable coalescence with nearby settlements.

The human version (we wrote this, not the council)This site allocation covers Metropolitan House, 3 Darkes Lane, a 0.58 ha urban site with a part 8-storey, part 3-storey office building and town centre uses at ground floor. It proposes redevelopment delivering at least 96 homes in Years 1 to 5, with main town centre uses on the ground floor and homes above. Two consents already exist: prior approval for change of use from office to 96 flats, and permission for external alterations to the building. The scheme must account for the railway line and flood risk, and provide public realm, amenity space and proportionate infrastructure improvements.

The human version (we wrote this, not the council)This site allocation covers Canada Life Place, off Mutton Lane, a 1.84 ha urban site with a 13-storey office building, a 6-storey office building and smaller buildings on the High Street. It proposes comprehensive mixed-use redevelopment delivering at least 369 homes during Years 1 to 10, with town centre, commercial, leisure and cultural uses on the ground floor. Development must follow a masterplan under Policy DM3, be design-led, and take account of nearby Grade II listed buildings, Ladbrooke School and surface water flood risk.

The human version (we wrote this, not the council)This site allocation covers the Tesco site on Mutton Lane, a 2.9 ha urban site with a supermarket, car park and petrol filling station. It proposes comprehensive redevelopment delivering at least 588 homes and the re-provision of the existing foodstore, mainly in the latter years of the plan period. Homes must be high quality and include at least 20% Affordable Housing. Development must follow a site-wide masterplan under Policy DM3, link well to the High Street and neighbouring Canada Life Place, and deliver new public realm and open space.

The human version (we wrote this, not the council)This site allocation covers Potters Bar Station Car Park on Darkes Lane, a 1 ha publicly owned urban site used as the railway station car park. It proposes comprehensive redevelopment delivering at least 55 flats and re-providing an appropriate amount of car parking needed for long-term access to the station. Homes will be medium density and include genuinely affordable homes, with possible town centre uses at ground floor. Development must follow a site-wide masterplan under Policy DM3 and consider the adjoining railway line and surface water flood risk.

← Back to the plan search

Have your say

Tips for a response that counts

One focused page beats ten rambling ones. Read the full guide to consultations

  1. Submit a formal representation. This is the only response that must be considered at the plan’s independent examination. The emails below are worth sending too, but they do not count as representations. Open the official response portal

    This portal is one form for the whole plan, and it asks which policy or site allocation you are commenting on. Quote the policy reference and page numbers shown here in your answer so your point is logged against the right part.

    Write your comments before you open the portal: a notes app, an email draft or paper all work. Paste each one in and keep a copy. Ticking policies as you read builds the draft for you on the My response page.

  2. Email your ward councillors. They voted on this plan and represent you. The draft raises the consultation window and the missing costs.
    Not sure of your ward? Find your councillor →
  3. Email the planning policy team with questions about the consultation. Email the policy team

Deadline: 11:59pm, Thursday 19 November 2026. Emails open in your own mail app with a suggested draft. Edit it so it says what you think.