Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Site allocations

The specific sites the plan proposes to allocate for development, and what each allocation requires.

288 sections of the plan, in document order.

The human version (we wrote this, not the council)This site allocation lists six sites in Shoeburyness. Land at George Street could provide about 8 homes with green space to the rear. Land at Elm Road could provide about 250 homes, but ground conditions must be made safe first. Terminal Close could provide about 150 homes in a mixed use scheme, with some small shops on Shoebury High Street, and is released from employment use. Three sites already have planning permission: land between Barge Pier Road and Ness Road for about 210 homes with a health centre, Land at Eagle Way for about 21 homes, and Thorpedene, Delaware Road, for about 19 homes.

The human version (we wrote this, not the council)This policy protects the Upper Nene Valley Gravel Pits Special Protection Area. Development likely to have significant effects must meet the Habitats Regulations, and a Habitats Regulations Assessment is required, with early consultation with Natural England. Development in the zone of influence must show compliance with the mitigation strategy and pay a Suitable Access Management and Monitoring contribution or provide bespoke mitigation such as Suitable Alternative Natural Greenspace. Possible functionally linked land needs two years of overwintering bird surveys. Major developments must show water recycling capacity. Proposals within 250 metres of the site need an assessment of effects on birds.

The human version (we wrote this, not the council)This section explains where the plan's new homes will come from and lists every site proposal. There are four sources of supply: sites with planning permission, allocations, broad locations or opportunity sites, and windfall development. Delivery of broad locations is less certain, so only part of their capacity is assumed by 2045. Windfall sites are those not identified in the plan, such as conversions or flats over shops. The table then lists the site proposals for each neighbourhood with their approximate homes. The largest is Bournes Green New Neighbourhood, Land North of Southend, for a minimum of 4,900 homes, followed by Better Queensway with about 1,760 homes.

The human version (we wrote this, not the council)This section introduces Part 3 of the Local Plan, on Hertsmere's towns and places. It says the Plan is organised around four principal settlements: Borehamwood, Potters Bar, Bushey and Radlett, with Settlement Visions prepared for each. It describes the character and vision of each town. It also covers Hertsmere's links with neighbours such as Watford, St Albans, Welwyn Hatfield, Three Rivers, Barnet, Enfield and Harrow. It explains that a brownfield-first approach is used, but that urban land alone cannot meet all needs. The Plan therefore also allocates sites at settlement edges and a new settlement at Bowmans Cross.

The human version (we wrote this, not the council)This policy protects the county's most important nature sites, including the Chilterns Beechwoods, Burnham Beeches and Aston Rowant Special Areas of Conservation. Proposals must show they will not harm these sites, and a Habitats Regulations Assessment is required. The plan sets a 500 metre exclusion zone for new housing around Burnham Beeches and the Ashridge part of the Chilterns Beechwoods. Within wider Zones of Influence, developments must fund alternative green spaces (SANGs) and visitor management measures to reduce recreational pressure. Several strategic SANG sites and a Gateway site are allocated.

The human version (we wrote this, not the council)This policy sets the rules for Suitable Alternative Natural Greenspace (SANG), which is green space created to draw visitors away from protected nature sites. A SANG must provide at least eight hectares per 1,000 new occupants, a circular walk of at least 2.3km, one parking space per hectare, and be secured and managed for at least 80 years. It must be open before the homes relying on it are occupied. Developments of ten or more homes must contribute to a strategic SANG or provide their own; smaller schemes can rely on any strategic SANG in the zone.

The human version (we wrote this, not the council)This policy supports Gateway sites, a new type of visitor destination designed to draw people away from protected Special Areas of Conservation. A Gateway must sit within 500 metres of the SAC boundary, cover more than 8 hectares (ideally over 15), and offer facilities such as refreshments, toilets, local retail and sufficient parking so visitors stay there rather than entering the protected area. Proposals that would increase visitor numbers to the SAC will not be supported. A Gateway is currently proposed at Land at Wards Hurst, Ringshall, near the Ashridge Estate.

The human version (we wrote this, not the council)This section is the contents page for the Borehamwood site allocations in Chapter 14. It lists seventeen allocations, HBA6 to HBA22: Retail Park; The Point, Shenley Road; Regent House and Car Park, Theobald Street; Hertsmere Civic Offices Cluster; Borehamwood Fire Station and Job Centre Cluster; Elstree Way Cluster; Imperial Place; Old Haberdasher's Sports Ground; Aycliffe Road and Leeming Road Local Centre; land north and south of Allum Lane; land at Barnet Lane and Vale Avenue; Organ Hall Farm; Borehamwood Industrial Area Extension; and Lismirrane Industrial Park Extension. Each is shown with a page number.

The human version (we wrote this, not the council)This site allocation covers the Retail Park in Borehamwood Town Centre, a 5.01 ha urban site in public and private ownership with about 20,000 sqm of mainly large-format retail, leisure and health uses and extensive surface parking. It is allocated for comprehensive mixed-use redevelopment, delivering at least 500 new homes in the latter stages of the plan period, with the 20,000 sqm of main town centre uses re-provided. A site-wide masterplan is required, with phasing that keeps a critical mass of retail activity. Constraints include the culverted Borehamwood Brook beneath part of the car park and flood risk.

The human version (we wrote this, not the council)This site allocation covers The Point, Shenley Road, Borehamwood, a 1.02 ha publicly owned site. It holds a single-storey building with a cinema, gym and bingo hall, and rooftop public car parking. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 200 new homes, with compatible town centre, leisure and community uses. A site-wide masterplan is required. It must improve pedestrian links to Shenley Road, Centenary Place and Furzehill Road, and may include a public square. Existing leisure uses must be retained, modernised or re-provided where need continues. Development must conserve the setting of All Saints Church and its graveyard, and should generally be mid-rise.

The human version (we wrote this, not the council)This site allocation covers Regent House and the car park behind it on Theobald Street, Borehamwood, a 0.55 ha urban site. Regent House is a privately owned office building and the rear car park, which serves Elstree and Borehamwood Railway Station, is publicly owned. It is allocated for residential-led redevelopment delivering at least 55 homes, with public realm and compatible town centre uses. A site-wide masterplan is required, and the two sites must be treated together. A heritage assessment must show how the significance and setting of the Grade II listed Manor House has shaped the design. Pedestrian and cycle links to the railway station must be improved.

The human version (we wrote this, not the council)This site allocation covers the Hertsmere Civic Offices Cluster on Elstree Way, Borehamwood, a 2.23 ha publicly owned site. It holds civic offices, police and public-service facilities, health facilities, a children's nursery, community uses and a public car park. It is allocated for comprehensive mixed-use regeneration delivering at least 345 homes, with civic, health, community and other compatible uses, public realm and green infrastructure. Constraints include a culverted Main River beneath the car park and reservoir flooding. A site-wide masterplan is required. Existing public services must be kept, modernised or re-provided, and stay operational until replacements are available.

The human version (we wrote this, not the council)This policy safeguards land for planned road schemes so that development cannot block their delivery. The protected schemes include several Aylesbury link roads, the Wing West Link Road, Buckingham South Link Road, Princes Risborough Relief Road, Whaddon and Horton bypasses, A421 capacity improvements and Winslow link roads. Development that would prejudice these schemes, or the Transport Improvement Lines shown on the council's website, will not be supported. Major sites must also identify, protect and help deliver strategic transport infrastructure where evidence shows it is critical.

The human version (we wrote this, not the council)This site allocation covers the Borehamwood Fire Station and Job Centre Cluster on Elstree Way, a 0.63 ha site in several public-sector ownerships. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 63 homes during the plan period, together with public, community, social or other active uses. Relocating the fire station would be needed first, and replacement accommodation must be secured before the existing facility is lost, unless otherwise agreed with the service provider. Flood Zone 2 affects the vicinity of the site access. A site-wide masterplan is required, and the Job Centre or successor services must be kept or re-provided where need continues.

The human version (we wrote this, not the council)This site allocation covers the Elstree Way Cluster in Borehamwood, a privately owned 0.74 ha urban site. It holds a former police and office building, a petrol filling station and motor-repair premises. It is allocated for comprehensive residential-led mixed-use redevelopment delivering at least 170 new homes, with employment, workspace or other compatible active uses kept or re-provided at ground and lower levels. Because of the historic petrol filling and vehicle repair uses, ground conditions should be investigated. A site-wide masterplan is required. Development must support the wider employment and creative role of Elstree Way and provide an active ground-floor frontage to it.

The human version (we wrote this, not the council)This site allocation covers Imperial Place on Elstree Way, Borehamwood, a privately owned 2.2 ha site of office buildings and a multi-storey car park. It is allocated for comprehensive mixed-use regeneration delivering at least 550 new homes in the first half of the plan period, with employment and workspace retained, re-provided or intensified, plus public realm and green infrastructure. Parts of the site lie in Flood Zones 2 and 3, and a culverted watercourse runs along its eastern boundary. A site-wide masterplan is required. Development must respond to the operational needs of Elstree Studios and neighbouring employment uses.

The human version (we wrote this, not the council)This section is the housing trajectory, a set of tables showing expected new homes in each year from 2026/27 to 2042/43. The requirement is 2,512 homes a year, 42,704 in total, or 2,638 a year with the 5% buffer. Total expected supply over the plan period is 44,779 homes, against a cumulative requirement with the buffer of 44,839, a shortfall of 60 by the end of the period. Supply falls short in the early and late years and exceeds the requirement in the middle years. Further tables break the supply down by site for each area, starting with Northampton.

The human version (we wrote this, not the council)This policy requires developments to show they will have adequate water supply, foul drainage and sewage treatment capacity before homes are occupied, with phasing conditions used to enforce this. New buildings are expected to connect to mains drainage. The evidence shows 34 wastewater treatment works need upgrades to accommodate planned growth. A related policy (IN4) safeguards two strategic water sites: land at Galley Lane near Stoke Hammond for the Grand Union Canal water transfer project, and land west of Iver for a possible new drinking water treatment works.

The human version (we wrote this, not the council)This site allocation covers land south of Allum Lane, Elstree, Borehamwood, a privately owned 10.46 ha site of open and agricultural land in the Metropolitan Green Belt. It is allocated for at least 150 new homes, including specialist accommodation for older people, with healthcare and community facilities, public open space and green infrastructure. Delivery is expected in the first half of the plan period. Planning application 24/0442/FUL proposes an Integrated Retirement Community of 150 homes. Development must keep a strong landscape separation between Borehamwood and Elstree Village, and the setting of the Grade II listed buildings at Nicoll Farmhouse must inform the design. Archaeology near ARCH-17 must be investigated.

The human version (we wrote this, not the council)This site allocation covers land west of Vale Avenue, Borehamwood, a privately owned 3.4 ha site of open fields in the Metropolitan Green Belt. It is allocated for at least 98 homes, expected in the first five years of the plan period, with public and communal open space, landscape, biodiversity enhancement and sustainable drainage. Application 25/1615/FUL for 98 homes has a resolution to grant subject to a S106 agreement. A strong landscape framework must set a durable Green Belt boundary and keep a clear distinction between Borehamwood and Elstree. Adjoining Local Wildlife Sites must be protected and enhanced, and mature and protected trees retained.

The human version (we wrote this, not the council)This site allocation covers Organ Hall Farm, Theobald Street, Borehamwood, a privately owned 8.9 ha undeveloped greenfield site in the Metropolitan Green Belt. It is allocated for at least 102 new homes in the first half of the plan period, with a new medical centre, landscaping, amenity space, custom and self-build housing and sustainable drainage. Outline permission 22/2149/OUT allows up to 110 dwellings and an 800 sqm medical centre, and 25/1412/REM covers 102 dwellings. Flood Zones 2 and 3 must inform the layout. The effect on existing allotments must be addressed, with replacement or mitigation where they are lost or displaced.

The human version (we wrote this, not the council)This site allocation covers the Extension to Lismirrane Industrial Park, 16.34 ha of mainly open land in the Metropolitan Green Belt, next to the existing industrial park and the Centennial Park employment cluster. It is allocated as a Strategic Industrial Employment Site for light and general industrial uses, storage and distribution, research and development, and ancillary office or flexible workspace. Approximately 35,000 sqm of net additional flexible employment floorspace is expected. Several consents have been granted or have a resolution to grant. Development must keep a primary employment function and follow a site-wide masterplan under Policy DM3.

The human version (we wrote this, not the council)This section is an introductory list for the Potters Bar site allocations in Chapter 15. It names the eleven allocations that follow, HPBA4 to HPBA14, and gives the page where each starts. They run from Metropolitan House on Darkes Lane, Canada Life Place and the Tesco site, through the Bus Garage, the Station Car Park and the Barnet Road urban extension, to land at Dove Lane and two Strategic Industrial Employment Sites.

The human version (we wrote this, not the council)This site allocation covers Metropolitan House, 3 Darkes Lane, a 0.58 ha urban site with a part 8-storey, part 3-storey office building and town centre uses at ground floor. It proposes redevelopment delivering at least 96 homes in Years 1 to 5, with main town centre uses on the ground floor and homes above. Two consents already exist: prior approval for change of use from office to 96 flats, and permission for external alterations to the building. The scheme must account for the railway line and flood risk, and provide public realm, amenity space and proportionate infrastructure improvements.

The human version (we wrote this, not the council)This site allocation covers Canada Life Place, off Mutton Lane, a 1.84 ha urban site with a 13-storey office building, a 6-storey office building and smaller buildings on the High Street. It proposes comprehensive mixed-use redevelopment delivering at least 369 homes during Years 1 to 10, with town centre, commercial, leisure and cultural uses on the ground floor. Development must follow a masterplan under Policy DM3, be design-led, and take account of nearby Grade II listed buildings, Ladbrooke School and surface water flood risk.

The human version (we wrote this, not the council)This site allocation covers the Tesco site on Mutton Lane, a 2.9 ha urban site with a supermarket, car park and petrol filling station. It proposes comprehensive redevelopment delivering at least 588 homes and the re-provision of the existing foodstore, mainly in the latter years of the plan period. Homes must be high quality and include at least 20% Affordable Housing. Development must follow a site-wide masterplan under Policy DM3, link well to the High Street and neighbouring Canada Life Place, and deliver new public realm and open space.

The human version (we wrote this, not the council)This site allocation covers the Bus Garage on the High Street, a 1.2 ha publicly owned urban site currently used as a bus depot. It proposes comprehensive redevelopment delivering at least 119 homes, with compatible employment, main town centre and community uses at ground or lower level, mainly in the latter years of the plan period. Existing buildings will be demolished and the site reconfigured with a street-based layout and better routes. Development must follow a site-wide masterplan under Policy DM3 and take account of constraints, including the locally listed wall on the southern boundary.

The human version (we wrote this, not the council)This section lists every site allocated in the plan, organised by settlement. For each allocation it gives the local planning authority, settlement category, allocation type, related policy, site reference and name, the number of homes, hectares of employment land and any Gypsy and Traveller pitches. The list runs from Alcester through to Wellesbourne and beyond, covering both large strategic sites such as the new communities and small local sites of only a few homes.

The human version (we wrote this, not the council)This site allocation covers Potters Bar Station Car Park on Darkes Lane, a 1 ha publicly owned urban site used as the railway station car park. It proposes comprehensive redevelopment delivering at least 55 flats and re-providing an appropriate amount of car parking needed for long-term access to the station. Homes will be medium density and include genuinely affordable homes, with possible town centre uses at ground floor. Development must follow a site-wide masterplan under Policy DM3 and consider the adjoining railway line and surface water flood risk.

The human version (we wrote this, not the council)This site allocation covers the Barnet Road Strategic Urban Extension, 63.4 ha of privately owned agricultural land south of Potters Bar, between Baker Street and Barnet Road. It proposes a strategic urban extension delivering at least 900 homes, with a neighbourhood centre of community, local retail and employment space and walkable neighbourhoods linked by walking and cycling routes. The site is defined as grey belt, and development must secure a defensible Green Belt boundary on its southern and western edges. A site-wide masterplan under Policy DM3 and work with Hertfordshire County Council on school places are required.

← Back to the plan search