Open Consultation

Consultations you can actually read.

OpenConsult / Plan explorer

Infrastructure & utilities

The roads, pipes and wires behind development: infrastructure funding, water supply, sewerage, broadband and the electricity grid.

393 sections of the plan, in document order.

The human version (we wrote this, not the council)This policy supports affordable homes on Rural Exception Sites, which are sites next to villages that would not normally get planning permission for housing. Schemes must meet a clearly evidenced local need, be of a size that suits the settlement, have access to local services, and be owned and managed by a Registered Provider so the homes stay affordable in perpetuity. A small amount of market housing may be allowed only where robust evidence shows a 100% affordable scheme would not be viable, and only at the minimum level needed.

The human version (we wrote this, not the council)This policy guides development on windfall sites, meaning unallocated sites that come forward unexpectedly within settlements. Development will be permitted where its scale, density and character fit the existing settlement, either within the built-up area or by consolidating the settlement pattern without harm. Proposals must not cause settlements to merge, must avoid significant harm to landscape, heritage, biodiversity and open space, and must have the infrastructure capacity to support them. The policy includes criteria for judging whether a site counts as being within a settlement.

The human version (we wrote this, not the council)This policy covers archaeology. Developers should hold pre-application discussions, especially for major proposals and archaeologically sensitive areas, to decide whether and when an evaluation is needed. Where remains are known or found, their significance and condition must be assessed. Preservation in situ is preferred for significant remains equivalent to scheduled monuments, where appropriate and practical. Preserved remains need provision for ongoing management and on-site interpretation, and damaging activities such as tree planting or new paths should be avoided. Remains not preserved must be fully investigated and recorded, with results published and the archive deposited at a recognised repository.

The human version (we wrote this, not the council)This policy asks development to apply circular economy principles to conserve resources and improve efficiency. Major development should aim to be net zero-waste. Proposals must manage the type and volume of recyclable materials and waste during construction and occupation. They must provide enough on-site space for sorting recycling, composting organic material and general waste, with safe access and separate commercial and household waste in mixed-use schemes. Flats need temporary storage for each unit and communal storage. New multi-storey development must also provide storage and collection systems on each floor unless other designs are shown to work. Major schemes are encouraged to submit a Circular Economy Statement.

The human version (we wrote this, not the council)This section sets out road safety requirements and the reasoning behind them. In urban areas, residential streets should be designed for 20mph, with continuous footpaths and cycleways connecting to the surrounding network. In rural areas, new accesses need good visibility and speed reduction where necessary, with the needs of horse riders and farm vehicles considered. Warwickshire County Council aims to cut deaths and serious injuries on its roads by 50% by 2030, working towards zero by 2050.

The human version (we wrote this, not the council)This policy links land use and transport. Development must make effective use of land, consider access to public transport, and give priority to reducing car use and enabling walking, cycling and public transport. Proposals must not harm the working or safe use of the transport network and public realm. Land needed for transport infrastructure in the Infrastructure Delivery Plan will be safeguarded. The Council will work with partners on better pedestrian networks, station improvements such as step-free access, bus priority and bus stops, and wider cycle hire. Major development and other schemes affecting the network must submit a Transport Assessment, Transport Statement and/or Travel Plan.

The human version (we wrote this, not the council)This section describes the proposed Hatton New Community, a 262-hectare new settlement delivering at least 4,558 homes, with 4,000 built by 2050 and up to 5,250 possible. It includes two primary schools, a secondary school, a district centre, three neighbourhood centres, 2 hectares of employment land and at least 25 hectares of open space. Development runs in three phases from 2032/33 to 2056/7, with a new spine road bridging the railway and canal, major upgrades to Hatton Station, and a minimum density of 40 homes per hectare.

The human version (we wrote this, not the council)This policy sets the requirements for data centre proposals. Applicants must show that enough electrical grid capacity can be secured, that electricity, digital connectivity and water needs can be met, and that noise, air quality and visual impacts are properly mitigated. Back-up generators should not use diesel, and sustainable heating and cooling should be used where feasible. In sensitive locations such as the Green Belt, applicants must show the development cannot go in a less sensitive place, and all proposals must evidence the need for the facility and its local economic benefits.

The human version (we wrote this, not the council)This policy requires, unless exempt, a 10% net gain in biodiversity as required by the Environment Act 2021. It should be delivered by enhancing and creating habitats, following the biodiversity net gain hierarchy, with on-site provision preferred unless off-site gives a better outcome. Exempt development must still provide suitable biodiversity enhancements. Applications subject to mandatory net gain must submit a draft Biodiversity Net Gain Plan covering the hierarchy, baseline value, pre and post-development values, how 10% will be reached, and contribution to the Local Nature Recovery Strategy. Off-site gain should follow that Strategy. Development mainly aimed at nature is supported.

Policy TR3

Parking

pp. 325–328

The human version (we wrote this, not the council)This policy sets a carefully managed approach to parking, designing places on the basis that walking, cycling and public transport will become the preferred ways to travel. Car-free and car-lite development is supported in highly accessible, well-connected locations, and elsewhere where specific conditions are met, such as good access to services, a Controlled Parking Zone, or enough public transport capacity. Development must not exceed the parking standards in Appendix 7 Sustainable Parking Standards. Adequate disabled persons parking must be provided, including in car-free schemes. Proposals must provide cycle parking following the Cycle Design Standards, including spaces for adapted cycles and cargo bikes.

The human version (we wrote this, not the council)This policy supports proposals that deliver the aims of the West Northamptonshire Tree and Woods Strategy, the UK Tree Strategy and the England Tree Action Plan, to increase tree cover, protect woodland and connect people to trees. It supports expanding and linking woodland habitats, conserving ancient woodland and veteran trees, protecting high quality and amenity trees, and more street trees in urban areas. Tree planting should be targeted where green infrastructure benefits are greatest, including low-grade farmland and land needing remediation. It also supports sustainable public access to woodlands and positive woodland management.

The human version (we wrote this, not the council)This policy commits the City Council to regular monitoring of the Local Plan. Monitoring will check the impact of the plan and how well its policies and proposals work, using the framework in Appendix 10. It will focus on making sure development is served by the infrastructure it needs, through an infrastructure led approach. It will also check progress on preparing the plan against the Local Development Scheme. Finally, monitoring will show when policies need revising, such as the timing and release of further housing, or when more Supplementary Planning Documents or Masterplans are needed.

The human version (we wrote this, not the council)This policy covers trees and hedgerows in development. Proposals should integrate existing trees, woodland and hedgerows, and unavoidable losses need replacement planting for each tree lost. Retained trees must be protected during works, and planting should use native species of local provenance. Loss of ancient woodland and veteran trees is not permitted unless the benefits clearly outweigh the loss. All new development must meet the Urban Greening Factor standard to help reach average green cover of 40% and avoid net loss of urban green cover. Major commercial development needs a score of at least 0.3, residential at least 0.4, and 0.5 on greenfield land.

The human version (we wrote this, not the council)This policy supports proposals that protect and enhance existing green and blue infrastructure and create more. New developments must protect, manage, maintain and connect existing assets. Major housing and commercial developments must deliver or contribute to green and blue infrastructure projects in proportion to the development, with a site-specific strategy or plan showing connections beyond the site. Proposals should show a positive contribution to projects in existing Green Infrastructure Plans and the National Green Infrastructure Framework. Green and blue infrastructure for major developments should be managed, maintained and monitored for at least 25 years.

The human version (we wrote this, not the council)This policy protects water quality in rivers, canals, lakes, reservoirs and groundwater. Development will only be supported where it does not harm surface or underground water bodies, and proposals should look for chances to improve water quality. Schemes affecting designated wildlife sites or water catchments must show how quality will be maintained and pressure on the wastewater network reduced. Extra safeguards apply in Drinking Water Safeguard Zones and Source Protection Zones, including restrictions on soakaways and infiltration drainage, and a Water Framework Directive assessment is required where development could harm a waterbody.

The human version (we wrote this, not the council)This policy covers green and blue corridors. They will be managed and enhanced by building existing and future networks into proposals, securing contributions for their creation and management, and delivering long-term management strategies for the sub-regional and local networks. Measures to enhance or provide new green infrastructure should be sustainable, help adapt to climate change through flood risk management and carbon storage, be of the highest quality in appearance, access and biodiversity, reflect local character with native and climate-appropriate species, and be supported by long-term management strategies such as the Local Nature Recovery Strategy.

The human version (we wrote this, not the council)This policy supports high-quality, fast and reliable digital infrastructure across Hertsmere. The Council will work with stakeholders to remove barriers to digital access. Development must enable full-fibre, or equivalent, connectivity to all end users and meet the expected demand for mobile connectivity, and must be connection-ready on first occupation. Proposals on sites without full-fibre broadband, or otherwise poorly served, including in employment areas and town centres, must show how they will improve digital connectivity. New digital infrastructure and equipment is supported where it is the minimum needed, sharing has been investigated, and there is no significant harm to visual amenity.

The human version (we wrote this, not the council)This policy protects the safety and operation of aerodromes. Development will not be permitted where it would harm the operational integrity or safety of safeguarded civil and military aerodromes or their navigation aids, radio aids or telecommunications systems. The Council will consult the Airport Operator on wind turbine proposals in the Heathrow Airport Safeguarding Zone, and will consult the Elstree Airport Licensee on relevant proposals. Development near Elstree is permitted only if it does not compromise the Aerodrome's operational integrity and general safety and is compatible with its continued use. The explanation describes Elstree Aerodrome as a privately operated airfield licensed by the Civil Aviation Authority, but not officially safeguarded.

The human version (we wrote this, not the council)This policy protects and enhances the natural and cultural environment of river corridors and their tributaries. Proposals must show they understand the river's importance for biodiversity and natural capital. Development likely to harm a watercourse's functions and setting will not be permitted. In previously undeveloped areas, an undeveloped buffer of at least 10m from the top of the bank must be kept on both sides, planted with native species, with no new domestic gardens. A working methods statement and a long-term Landscape Ecological Management Plan are required. Culverting and hard bank revetment are not supported, de-culverting is supported, and groundwater must not be harmed.

The human version (we wrote this, not the council)This section introduces the transport chapter. It says transport schemes to support growth are set out in the Infrastructure Delivery Plan, which has had Phase 1 and Phase 2 reviews. It sets out the national policy context, including the NPPF's vision-led approach to joining up land use and transport, and its call for adequate overnight lorry parking. The Plan draws on the Local Transport Plan 2025 to 2045 and strategies on active travel, mobility hubs and rail. The section also covers sustainable transport, including the Local Transport Plan, local walking and cycling plans, rights of way and electric vehicle charging.

The human version (we wrote this, not the council)This section introduces Part 3 of the Local Plan, on Hertsmere's towns and places. It says the Plan is organised around four principal settlements: Borehamwood, Potters Bar, Bushey and Radlett, with Settlement Visions prepared for each. It describes the character and vision of each town. It also covers Hertsmere's links with neighbours such as Watford, St Albans, Welwyn Hatfield, Three Rivers, Barnet, Enfield and Harrow. It explains that a brownfield-first approach is used, but that urban land alone cannot meet all needs. The Plan therefore also allocates sites at settlement edges and a new settlement at Bowmans Cross.

The human version (we wrote this, not the council)This policy sets the sustainable transport vision. Development must prioritise safe, direct and inclusive walking, wheeling, cycling and public transport over private car use, and support the aim of 50% of town journeys by active travel by 2030. A transport hierarchy puts avoiding the need to travel first and freight and fleet vehicles last. Major and allocated sites must provide walking and cycle routes, secure cycle parking, bus access, connected streets and mobility hubs, and consider car-free development in sustainable locations. Transport assessments are required, with an Active Travel Assessment, Travel Plan and public transport strategy for major schemes.

The human version (we wrote this, not the council)This policy requires development to deliver high-quality green infrastructure, the network of green spaces, trees, waterways and other natural features that benefits wildlife, flood management, health and recreation. Residential schemes of more than ten dwellings, or over 1,000 square metres of floorspace, must meet Natural England's Accessible Green Space standards and submit a Green Infrastructure Statement. These standards aim for good quality green space within a 15-minute walk of home. Green infrastructure must be managed for at least 30 years after completion, with arrangements to secure its management in perpetuity.

The human version (we wrote this, not the council)This policy sets priorities for strategic connections, to be achieved by working with transport providers. For rail, it seeks faster and more frequent services between London, Birmingham and airports via Northampton, extra services, a multi-transport interchange in the Milton Keynes and Northampton areas, better links to Aylesbury and Bletchley, and more rail freight. For road, it seeks A45 traffic management, A43 improvements, a step-change in bus services including to Silverstone, better bus links to Northampton station, and more electric buses. It also supports using the canal network for freight.

The human version (we wrote this, not the council)This policy resists the loss of existing accessible green space, including allotments, and the transfer of public green infrastructure into private gardens. Loss will be refused unless an assessment against Natural England's standards proves the space is surplus, the land makes no positive contribution to appearance, recreation or wildlife, it contains no priority habitats or species, and there is no cumulative harm to the local area. Any green space lost must be replaced with equivalent or better provision within the catchment of the space lost.

The human version (we wrote this, not the council)This section covers proposal BIT.2 at Red House Farm, south-west of Bishop's Tachbrook. The 160-hectare site provides around 121 hectares of strategic employment land, totalling 3,750,000 sq ft of floorspace mainly for logistics and industry. The developer will fund a new M40 junction to replace junctions 13 and 14, plus a dual carriageway link road to Warwick and Leamington. The scheme also includes a Park and Ride, a central mixed-use hub, 39 hectares of green and blue infrastructure, and a travelling showpersons yard of at least 6 plots. Delivery runs from 2027 to 2034/35.

The human version (we wrote this, not the council)This section introduces the infrastructure chapter. It says infrastructure must be delivered alongside homes and jobs, guided by the Infrastructure Delivery Plan and its Phase 1 and Phase 2 reviews. It covers national policy, school places and green infrastructure. It lists infrastructure types in the plan, such as transport, healthcare, education, utilities and digital. Funding comes from Section 106, Section 278, the Community Infrastructure Levy and SAMM fees. The SAMM zone of influence around the Upper Nene Valley Gravel Pits SPA extends from 3km to 5.9km. The section also summarises transport and social infrastructure.

The human version (we wrote this, not the council)This section summarises the Infrastructure Delivery Plan (IDP), which sets out the key infrastructure needed to support growth. The IDP is a live document that will be updated. The plan proposes a total of 14,700 dwellings up to 2045, including a new neighbourhood of 4,900 homes at Land North of Southend. A table splits needs between the existing urban area and Bournes Green. Needs include road, bus, rail, walking and cycling upgrades, community facilities, and health and emergency services. The existing urban area needs about 1,000 extra early years places. Bournes Green would need about 450 early years places, two primary schools and one secondary school.

The human version (we wrote this, not the council)This policy sets out what development must do in or near the Colne Valley Regional Park, a park of over 10,000 hectares in the east of the county established in 1967. Development should maintain and enhance the park's landscape, waterways and biodiversity, provide countryside recreation that is accessible to all, and improve walking, wheeling and cycling routes. It should also support the rural economy, encourage community participation and help reduce pollution to the River Colne. A possible extension of the park to cover Fulmer parish is being considered.

The human version (we wrote this, not the council)This policy makes Borehamwood the principal location for housing-led growth, regeneration and infrastructure investment in Hertsmere over the plan period. Residential-led mixed-use development is supported where it renews under-optimised land, helps meet the housing requirement and strengthens the town centre. Growth should come mainly from previously developed and under-used land, focused on the town centre, the railway station area and the Elstree Way corridor, with higher densities where suitable. Development should deliver affordable housing, protect the film and television cluster, improve walking, cycling and public transport links, and be supported by infrastructure. Major development must contribute to comprehensive planning, and fragmented site-by-site schemes are resisted.

← Back to the plan search